Completed No litigation declared Residential / Group Housing project

Shhraddha Ellegance Building B

By Shhraddha Properties

RG-MH-08006 · RERA P52600000096 · Last updated on MahaRERA portal: 6 Sep 2021

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Dec 2021Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Shhraddha Ellegance Building B is a Residential / Group Housing project by Shhraddha Properties in Solapur, Maharashtra, registered with MahaRERA as P52600000096 on 30 Jun 2017. The registration is recorded completed; possession was promised by 30 Dec 2021. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameShhraddha Ellegance Building B
  • TypeResidential / Group Housing
  • Location
    • Solapur (M Corp.)
    • Solapur North
    • Solapur
    • 413255
  • Pincode413255
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52600000096
  • ReraGenie IDRG-MH-08006

Builder

  • NameShhraddha Properties
  • Entity typePartnership
  • PartnersKantilal Javerchand Kankaria, Anil Sadashiv Revankar, Mahavir Mangilal Vaid, Sumit Kantilal Kankaria
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects8 →

Key dates

this monthRegisteredJun 2017First promiseDec 2019Revised toDec 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Jun 2017
  • Promised completion30 Dec 2021
  • Revised completionRevised to 30 Dec 2021 (originally 31 Dec 2019)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shhraddha Ellegance Building BNA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Sep 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Shhraddha Ellegance Building B: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Sep 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes65%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,627 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2459.0
Proposed, not sanctioned2,459 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRailway Lines, Dufferin Chowk, Solapur 413001

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashikiran C Shah
EngineerMoholkar S P
PartnerRole in project
Shhraddha Properties-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600005093Dec 2019 → Dec 2020

Reason as filed by the promoterSuper Structure and all amenities of Project are completed and we have obtained partial completions of 29 Apartments and already handed over possession of 20 Sold Apartments to Purchasers and Conveyance of the same are executed. As Sales of real estate in Solapur is very slow so we cannot met to arrange to complete interior part of remaining 9 Apartments. Hence we want extension of one year.

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000127100Rajendra Bhabutmal ShahShatrughan Bhanudas Chavare12/05/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jun 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Aug 2021

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Building-B Formation of Society Decleration.pdf6 Sep 2021
Status of ConveyanceFile: Building-B Formation of Society Decleration.pdf6 Sep 2021
Declaration about Commencement CertificateFile: Commencement Certificate.pdf5 Aug 2021
Disclosure of sold/ booked inventoryFile: Bld-B Sold Inventory.pdf5 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Bld-B CA Certificate 5 -18-19.pdf5 Aug 2021
Architect’s Certificate on Completion of Project (Form 4)File: Bld-B Architect Certificate.pdf5 Aug 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion Certificate Buld-B Part-5.pdf2 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: S-Prop Architect Certificate 2019-20 Q-4.pdf28 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: S-Prop Architect Certificate 2020-21 Q-2.pdf28 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: S-Prop Architect Certificate 2020-21 Q-3.pdf28 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S-Prop Engineer Certificate 2019-20 Q-4.pdf28 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S-Prop Engineer Certificate 2020-21 Q-2.pdf28 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: S-Prop Engineer Certificate 2020-21 Q-3.pdf28 May 2021
Certificates of CA (Form 3)File: S-Prop CA Certificate 2019-20 Q-4.pdf28 May 2021
Certificates of CA (Form 3)File: S-Prop CA Certificate 2020-21 Q-2.pdf28 May 2021
Certificates of CA (Form 3)File: S-Prop CA Certificate 2020-21 Q-3.pdf28 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate Q2 Bulding B.PDF13 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech CertificateQ3 Bulding B.PDF13 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q2 Building B.PDF13 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Q3 Building B.PDF13 Feb 2020
Certificates of CA (Form 3)File: CA Certificate Q2 Building B.PDF13 Feb 2020
Certificates of CA (Form 3)File: CA Certificate Q3 Building B.PDF13 Feb 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: B Builg SMC completion.PDF20 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert Bldg B Q1 1920.PDF2 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certi Bldg B Q1 1920.PDF2 Oct 2019
Certificates of CA (Form 3)File: CA Certificate Building B Q1 1920.PDF2 Oct 2019
Certificates of CA (Form 5)File: RERA CERT 5 SP 300919.pdf2 Oct 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion Certificate Bld B.PDF2 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert Bldg B 311218.PDF18 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Cert Bldg B 310319.PDF18 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Bldg B 311218.PDF18 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Bldg B 310319.PDF18 May 2019
Certificates of CA (Form 3)File: Ca Certificate Bldg B 311218.PDF18 May 2019
Certificates of CA (Form 3)File: CA Certificate BldgB 310319.PDF18 May 2019
OtherFile: Two Partial CC Bldg B.PDF18 May 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building B Q1 Archi Certificate.PDF25 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Building B Q2 Archi Certi.PDF25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Buildinb B Q1 Eng Cert.PDF25 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Building B Q2 eng Certi.PDF25 Jan 2019
Certificates of CA (Form 3)File: Building B Q1 Archi Certificate.PDF25 Jan 2019
Certificates of CA (Form 3)File: Building B Q2 CA Certificate.PDF25 Jan 2019
Certificates of CA (Form 5)File: Rera Form.PDF20 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: BLD B Architect Certificate.PDF15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate-Bld-B.PDF15 Oct 2018
Certificates of CA (Form 3)File: CA Certificate-BLD-B.PDF15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement of Building B.PDF4 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Bild B.PDF14 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Ellg Bldg B.PDF14 Feb 2018
Certificates of CA (Form 3)File: CA Certificate Ellg Bldg B.PDF14 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificates.PDF21 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificates.PDF21 Nov 2017
Certificates of CA (Form 3)File: CA Certificates.PDF21 Nov 2017
Copy of the legal title reportFile: Title Report Property Card SP.PDF29 Jun 2017
Layout approvalFile: Layout.pdf28 Jun 2017
Layout approvalFile: Ellg-B-Plan1.pdf28 Jun 2017
Layout approvalFile: Ellg-B-Plan2.pdf28 Jun 2017
Building plan approvalFile: Ellg-B BP.pdf28 Jun 2017
PAN CardFile: PAN Properties.PDF28 Jun 2017
Details of encumbrancesFile: Search Report Building B SP.PDF28 Jun 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf28 Jun 2017
Copy of Layout Approval (in case of layout)File: Ellg-B-Plan1.pdf28 Jun 2017
Copy of Layout Approval (in case of layout)File: Ellg-B-Plan2.pdf28 Jun 2017
Building Plan Approval (IOD)File: Ellg-B BP.pdf28 Jun 2017
Declaration in FORM BFile: S- Prop - Affidevit.PDF28 Jun 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Building-B.PDF28 Jun 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EngineerCertificate SEllg B.PDF28 Jun 2017
Certificates of CA (Form 3)File: CA Certificate Elleg B.PDF28 Jun 2017
Proforma of Allotment letterFile: S- Prop Agreement-Build-B.PDF28 Jun 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Shhraddha Ellegance Building GS No 87 5 CTS No 1012G28CompletedDec 2016Late, Jan 2017
Shhraddha Ellegance Building KBale Solapur 4132553CompletedOct 2016Oct 2016
Shhraddha Ellegance Building ABale Solapur 41325563CompletedJun 2016Late, Oct 2016
Bhramhapuri SocietyBale Solapur72CompletedMar 2016Late, Jul 2016
Shhraddha AshrayJodbhavi Peth Solapur19CompletedSep 2013Sep 2013

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 24 months
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep Shhraddha Ellegance Building B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Solapur (M Corp.)550+ in Solapur

Builder: Shhraddha Properties

Shhraddha Properties has 3 registrations on MahaRERA, including Shhraddha Ellegance Building B and Shhraddha Ellegance Building C. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 8 past projects completed on time. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if Shhraddha Ellegance Building B is delayed beyond 30 Dec 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shhraddha Ellegance Building B?

The registered promoter entity is Shhraddha Properties, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shhraddha Ellegance Building B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Shhraddha Ellegance Building B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Shhraddha Ellegance Building B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shhraddha Ellegance Building B?

The professionals named in the filing: Architect: Shashikiran C Shah; Engineer: Moholkar S P. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shhraddha Ellegance Building B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shhraddha Ellegance Building B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shhraddha Ellegance Building B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.