ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Shelar Supremus

Registered No litigation declared Residential / Group Housing project

Shelar Supremus

By Shelar Realty

RG-MH-35160 · RERA PR1330002500941 · Last updated on MahaRERA portal: 2 Jul 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 20Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 15%
101 of 101Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 16 documents Report an error

Shelar Supremus is a Residential / Group Housing project by Shelar Realty in Thane, Maharashtra, registered with MahaRERA as PR1330002500941 on 24 Sep 2025. Possession is promised by 31 Dec 2029. 0 of the 101 units on this registration are recorded sold or booked, and 4 of 20 construction stages are filed complete.

At a glance

Project

  • NameShelar Supremus
  • TypeResidential / Group Housing
  • Location
    • Survey No. 85/3
    • 86/2/1
    • 86/2/3
    • Kalyan West
    • Village- Kalyan
    • Kalyan
    • Thane
    • 421301
  • Pincode421301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1330002500941
  • ReraGenie IDRG-MH-35160

Builder

  • NameShelar Realty
  • Entity typePartnership
  • PartnersAnusaya Atmaram Shelar, Bhushan Atmaram Shelar, Chetan Bhagwan Shelar, Ganesh Manohar Shelar, Janardhan Namdeo Shelar, Kalpesh Mohan Shelar, Paresh Janardan Shelar, Prakash Shelar, Pratap Manohar Shelar, Tushar Bhagwan Shelar, Yatish Janardan Shelar, Vedant Bhushan Shelar

Key dates

this monthRegisteredSep 2025PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Sep 2025
  • Promised completion31 Dec 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed16 files

Current status

0%0 of 101 units booked
11.2%Work done, per cost certificate

Figures as on 2 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shelar SupremusTower A141153053
Shelar SupremusTower B131048048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 2 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 20 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 15%.

Shelar Supremus · wing Tower A10%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Shelar Supremus · wing Tower B32%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 2 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed326

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots326
Stilt / Ground162
Podiums / Upper Parking Floor164
BuildingStilt / GroundPodiums / Upper Parking FloorTotal
Shelar Supremus Tower A8586171
Shelar Supremus Tower B7778155

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area7,700 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Aug 2025

Approvals and building plan

Sanctioning authorityKalyan Dombivli Municipal Corporation
Permissible FSI10180.98
Proposed, not sanctioned10,181 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO.17 TO 21,SHREE SWAMI PRASAD, BUILDING NO.33,SHELAR PARK,KHADAKPADA CHOWK<KALYAN(W), PIN-421301
Estimated costRs 36.98 cr
Cost incurredRs 4.13 cr
Work done11.17%
BuildingWingEstimatedIncurred
Shelar SupremusTower ARs 20.47 crRs 2.33 cr
Shelar SupremusTower BRs 15.78 crRs 1.80 cr
-NARs 73.97 lakh-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVitan Consultants
EngineerPentacon Structural Consultants Private Limited.
EngineerNexus Consultants & Engineers
EngineerSK Consultants & Engineers
EngineerAnand Sawant
Chartered AccountantN B Sayed & Assocaites
Chartered AccountantRashesh P Patel
PartnerRole in project
Shelar Realty-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Sep 2025
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed16

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Shelar Supremus Form 2A FY 2025-26 (1).pdf2 Jul 2026
Withdrawal Update Form 1File: Form 1 - Shelar Supremus as on March 2026.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 - Shelar Supremus as on March 2026.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 - Shelar Supremus as on March 2026.pdf22 Apr 2026
Withdrawal Update Form 1File: Form 1 - Shelar Supremas as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 - Shelar Supremas as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form 3 - Shelar Supremas as on Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 - Shelar Supremus as on Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2 - Shelar Supremus as on Sep 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3 - Shelar Supremus as on Sep 2025.pdf17 Oct 2025
Layout approvalFile: Layout - 1.pdf5 Sep 2025
Building plan approvalFile: Layout - 2.pdf5 Sep 2025
Building plan approvalFile: Layout - 3.pdf5 Sep 2025
Building plan approvalFile: Layout - 4.pdf5 Sep 2025
Building plan approvalFile: Layout - 5.pdf5 Sep 2025
Declaration and undertaking (Annexure A)File: Annexure A - Order No 50.pdf5 Sep 2025

How this compares with Thane

0%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shelar Supremus on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyan West, Village- Kalyan7,600+ in Thane

2 kmShelar SupremusCompleted 97Lapsed / revoked 56Other 154Dot size: filed unitsN

Filed coordinates, straight-line distance. 307 registered projects within 2 km.

Builder: Shelar Realty

Shelar Realty has 1 registration on MahaRERA, including Shelar Supremus. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Shelar Supremus is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shelar Supremus?

The registered promoter entity is Shelar Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shelar Supremus?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shelar Supremus?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shelar Supremus?

The professionals named in the filing: Architect: Vitan Consultants; Engineer: Pentacon Structural Consultants Private Limited.; Engineer: Nexus Consultants & Engineers; Engineer: SK Consultants & Engineers; Engineer: Anand Sawant; Chartered Accountant: N B Sayed & Assocaites. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shelar Supremus?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shelar Supremus. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shelar Supremus to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.