Home / Browse projects / Pune, Maharashtra / SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT

Completed No litigation declared Residential / Group Housing project

SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT

By ICON PROPERTIES

RG-MH-27471 · RERA P52100034994 · Last updated on MahaRERA portal: 25 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 92 documents Report an error

SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT is a Residential / Group Housing project by ICON PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100034994 on 28 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameSHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT
  • TypeResidential / Group Housing
  • Location
    • VIDYA VIHAR COLONY GOKHALE ROAD
    • SHIVAJI NAGAR
    • Peth
    • Haveli
    • Pune
    • 411016
  • Pincode411016
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100034994
  • ReraGenie IDRG-MH-27471

Builder

  • NameICON PROPERTIES
  • Entity typePartnership
  • GSTIN27AAEFI6693P1ZI
  • PartnersPARAG TEPAN, MILIND SAKUNDE, PARAG SANE
  • Other registrations3 more →
  • Completed1 of 4
  • Declared earlier projects5 →

Key dates

this monthRegisteredApr 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Apr 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed92 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHEETALKUNJ CO OP HOUSING SOCIETYNA120000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHEETALKUNJ CO OP HOUSING SOCIETY: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Closed/Covered48
Open Space4

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,239 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SheetalKunj Sahakari Gruharachan Sanatha MaryaditPethPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI3964.83
Proposed, not sanctioned3,965 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANDIP HARDIKAR
EngineerRUIKERAND ASSOCIATES
Chartered AccountantDIPAK MEKHALE & COMPANY
Chartered AccountantSIDDHARTH SATCHIDANAND SMART
Chartered AccountantDIPAK MADHAVRAO MEKHALE
PartnerRole in project
ICON PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jun 2025

Documents filed92

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certficate - Sheetal Kunj.pdf25 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold as od date of completion 01042025.pdf25 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certficate - Sheetal Kunj.pdf25 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold as od date of completion 01042025.pdf25 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETALKUNJ - Q4 2425.pdf29 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold SK Q4 2425.pdf29 Apr 2025
Layout approvalFile: 01_compressed.pdf23 Apr 2025
Building plan approvalFile: 02_compressed.pdf23 Apr 2025
Building plan approvalFile: 03_compressed.pdf23 Apr 2025
Building plan approvalFile: 04_compressed.pdf23 Apr 2025
Building plan approvalFile: 05_compressed.pdf23 Apr 2025
Copy of Layout Approval (in case of layout)File: 01_compressed.pdf23 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf23 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf23 Apr 2025
Declaration about Commencement CertificateFile: 20250423175335.pdf23 Apr 2025
Building plan approvalFile: Sheetalkunj_plan 2.pdf22 Apr 2025
Building plan approvalFile: Sheetalkunj_plan 3.pdf22 Apr 2025
Building plan approvalFile: Sheetalkunj_plan 4.pdf22 Apr 2025
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf22 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj_plan 2.pdf22 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj_plan 3.pdf22 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj_plan 4.pdf22 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SHEETAL KUNJ FORM 2A FY 2425.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETALKUNJ - Q4 2425.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ 31032025.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHEETAL KUNJ 31032025.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 1 FY 2425_compressed.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 2 FY 2425_compressed.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 3 FY 2425_compressed.pdf3 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 2 SHEETAL KUNJ Q3 FY 2425.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 2425 SK.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold SK Q3 2425.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 icon property sheetalkunj.pdf2 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q1 FY2425.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q2 FY2425.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sheetal Kunj Sold Unsold 31032024.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30062024.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30092024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A- ICON PROPERTIES (MARCH 2024).pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A- ICON PROPERTIES (MARCH 2023).pdf23 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- ICON PROPERTIES (MARCH 2024).pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 4 FY 2324.pdf27 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 4 FY 2324.pdf27 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q4 FY2324.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 FY 2324 - SHEETAL KUNJ.pdf8 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ICON PROPERTIES FORM 5.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2324 SK.pdf13 Feb 2024
Disclosure of sold/ booked inventoryFile: Q3 2324 SHEETAL KUNJ SOLD UNSOLD.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 DEC23.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 FY 2324 - SHEETAL KUNJ.pdf5 Jan 2024
Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30062023.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30092023.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q2 FY2324.pdf11 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sheetal kunj Q2 FY2324.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 1 FY 2324.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 2 FY 2324.pdf10 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 31032023 SHEETALKUNJ.pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineers Certificate Q4 FY2223.pdf4 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineers Certificate Q1 FY2324.pdf4 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Sheetalkunj.pdf5 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer's Certificate_Icon Properties.pdf6 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM - 1 JUN22.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM - 1 SEP22.pdf17 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM - 1 DEC22.pdf17 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sheetal Kunj RERA Form 2.pdf17 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sheetal Kunj - p.pdf3 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate New Form 3 Q4_.pdf2 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate New Form 3 Q1 _.pdf2 Sep 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Icon SHEETALKUNJ - 10072022 C.pdf26 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Icon SHEETALKUNJ_compressed.pdf8 Aug 2022
Building plan approvalFile: Sheetalkunj com.pdf15 Jul 2022
Layout approvalFile: Sheetalkunj com.pdf15 Jul 2022
Copy of Layout Approval (in case of layout)File: Sheetalkunj com.pdf15 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj com.pdf15 Jul 2022
Copy of the legal title reportFile: TITLE REPORT.pdf11 Apr 2022
Declaration in FORM BFile: Icon Form B.pdf9 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Icon Properties_compressed.pdf9 Apr 2022

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHWINIKUNJ SAHAKARI GRUSHARACHANA SANSTHA MARYADITKOTHRUD PUNE18CompletedOct 2016Oct 2016
CHAITANYAPURI CO OPERATIVE HOUSING SOCIETY LIMITEDDHANUKAR COLONY KOTHRUD PUNE22CompletedSep 2016Sep 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA M on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHIVAJI NAGAR13,700+ in Pune

2 kmSHEETALKUNJ SAHAKARI GRUCompleted 49Lapsed / revoked 24Other 74Dot size: filed unitsN

Filed coordinates, straight-line distance. 147 registered projects within 2 km.

Builder: ICON PROPERTIES

ICON PROPERTIES has 4 registrations on MahaRERA, including SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT and BASANT BAHAR. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?

The registered promoter entity is ICON PROPERTIES, a partnership as per the filing. Its GSTIN 27AAEFI6693P1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?

The professionals named in the filing: Architect: SANDIP HARDIKAR; Engineer: RUIKERAND ASSOCIATES; Chartered Accountant: DIPAK MEKHALE & COMPANY; Chartered Accountant: SIDDHARTH SATCHIDANAND SMART; Chartered Accountant: DIPAK MADHAVRAO MEKHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA M to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.