Home / Browse projects / Pune, Maharashtra / SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT
SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT
RG-MH-27471 · RERA P52100034994 · Last updated on MahaRERA portal: 25 Jun 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT is a Residential / Group Housing project by ICON PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100034994 on 28 Apr 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.
At a glance
Project
- NameSHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT
- TypeResidential / Group Housing
- Location
- VIDYA VIHAR COLONY GOKHALE ROAD
- SHIVAJI NAGAR
- Peth
- Haveli
- Pune
- 411016
- Pincode411016
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100034994
- ReraGenie IDRG-MH-27471
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on28 Apr 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHEETALKUNJ CO OP HOUSING SOCIETY | NA | 12 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 25 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SHEETALKUNJ CO OP HOUSING SOCIETY: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 25 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed52
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SheetalKunj Sahakari Gruharachan Sanatha Maryadit | Peth | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANDIP HARDIKAR |
| Engineer | RUIKERAND ASSOCIATES |
| Chartered Accountant | DIPAK MEKHALE & COMPANY |
| Chartered Accountant | SIDDHARTH SATCHIDANAND SMART |
| Chartered Accountant | DIPAK MADHAVRAO MEKHALE |
| Partner | Role in project |
|---|---|
| ICON PROPERTIES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 23 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 25 Jun 2025
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certficate - Sheetal Kunj.pdf | 25 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold as od date of completion 01042025.pdf | 25 Jun 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certficate - Sheetal Kunj.pdf | 25 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold as od date of completion 01042025.pdf | 25 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETALKUNJ - Q4 2425.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold SK Q4 2425.pdf | 29 Apr 2025 |
| Layout approvalFile: 01_compressed.pdf | 23 Apr 2025 |
| Building plan approvalFile: 02_compressed.pdf | 23 Apr 2025 |
| Building plan approvalFile: 03_compressed.pdf | 23 Apr 2025 |
| Building plan approvalFile: 04_compressed.pdf | 23 Apr 2025 |
| Building plan approvalFile: 05_compressed.pdf | 23 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: 01_compressed.pdf | 23 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 02_compressed.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 03_compressed.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 04_compressed.pdf | 23 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: 05_compressed.pdf | 23 Apr 2025 |
| Declaration about Commencement CertificateFile: 20250423175335.pdf | 23 Apr 2025 |
| Building plan approvalFile: Sheetalkunj_plan 2.pdf | 22 Apr 2025 |
| Building plan approvalFile: Sheetalkunj_plan 3.pdf | 22 Apr 2025 |
| Building plan approvalFile: Sheetalkunj_plan 4.pdf | 22 Apr 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 22 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj_plan 2.pdf | 22 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj_plan 3.pdf | 22 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj_plan 4.pdf | 22 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SHEETAL KUNJ FORM 2A FY 2425.pdf | 21 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETALKUNJ - Q4 2425.pdf | 16 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ 31032025.pdf | 5 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SHEETAL KUNJ 31032025.pdf | 5 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 1 FY 2425_compressed.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 2 FY 2425_compressed.pdf | 3 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 3 FY 2425_compressed.pdf | 3 Mar 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 2 SHEETAL KUNJ Q3 FY 2425.pdf | 25 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 2425 SK.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold SK Q3 2425.pdf | 23 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 icon property sheetalkunj.pdf | 2 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q1 FY2425.pdf | 25 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q2 FY2425.pdf | 25 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sheetal Kunj Sold Unsold 31032024.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30062024.pdf | 24 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30092024.pdf | 24 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A- ICON PROPERTIES (MARCH 2024).pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A- ICON PROPERTIES (MARCH 2023).pdf | 23 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A- ICON PROPERTIES (MARCH 2024).pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 4 FY 2324.pdf | 27 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 4 FY 2324.pdf | 27 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q4 FY2324.pdf | 16 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q4 FY 2324 - SHEETAL KUNJ.pdf | 8 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ICON PROPERTIES FORM 5.pdf | 2 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 Q3 FY 2324 SK.pdf | 13 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Q3 2324 SHEETAL KUNJ SOLD UNSOLD.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1 DEC23.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Q3 FY 2324 - SHEETAL KUNJ.pdf | 5 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30062023.pdf | 18 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sheetal Kunj sold unsold 30092023.pdf | 18 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 SHEETAL KUNJ Q2 FY2324.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Sheetal kunj Q2 FY2324.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 1 FY 2324.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHEETAL KUNJ Q 2 FY 2324.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 31032023 SHEETALKUNJ.pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineers Certificate Q4 FY2223.pdf | 4 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineers Certificate Q1 FY2324.pdf | 4 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Sheetalkunj.pdf | 5 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Engineer's Certificate_Icon Properties.pdf | 6 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM - 1 JUN22.pdf | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM - 1 SEP22.pdf | 17 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM - 1 DEC22.pdf | 17 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sheetal Kunj RERA Form 2.pdf | 17 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sheetal Kunj - p.pdf | 3 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate New Form 3 Q4_.pdf | 2 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Certificate New Form 3 Q1 _.pdf | 2 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Icon SHEETALKUNJ - 10072022 C.pdf | 26 Aug 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Icon SHEETALKUNJ_compressed.pdf | 8 Aug 2022 |
| Building plan approvalFile: Sheetalkunj com.pdf | 15 Jul 2022 |
| Layout approvalFile: Sheetalkunj com.pdf | 15 Jul 2022 |
| Copy of Layout Approval (in case of layout)File: Sheetalkunj com.pdf | 15 Jul 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Sheetalkunj com.pdf | 15 Jul 2022 |
| Copy of the legal title reportFile: TITLE REPORT.pdf | 11 Apr 2022 |
| Declaration in FORM BFile: Icon Form B.pdf | 9 Apr 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Icon Properties_compressed.pdf | 9 Apr 2022 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| ASHWINIKUNJ SAHAKARI GRUSHARACHANA SANSTHA MARYADIT | KOTHRUD PUNE | 18 | Completed | Oct 2016 | Oct 2016 |
| CHAITANYAPURI CO OPERATIVE HOUSING SOCIETY LIMITED | DHANUKAR COLONY KOTHRUD PUNE | 22 | Completed | Sep 2016 | Sep 2016 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 92 filed documents as one ZIP, foldered, with a manifest
Keep SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA M on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVAJI NAGAR13,700+ in Pune
Filed coordinates, straight-line distance. 147 registered projects within 2 km.
KUSUM CO. OPERATIVE HOUSING SOCIETY LIMITED
M/S FORTUNE DEVELOPERS
VB FOREST CASTLE BY ASCENT LANDMARKS
ASCENT LANDMARKS LLP
TEJ MAYURBAN
TEJRAJ PROFILE INFRA LLP
The Luxe Towers - Building I and J
Neelsidhi Mohar Raisoni Developers LLP
TEJ MIDTOWN
TEJRAJ GANPATRAO PATIL
Bellagio Courtyards
MICHELNGELO LLP
Builder: ICON PROPERTIES
ICON PROPERTIES has 4 registrations on MahaRERA, including SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT and BASANT BAHAR. Its filings disclose 5 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?
The registered promoter entity is ICON PROPERTIES, a partnership as per the filing. Its GSTIN 27AAEFI6693P1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?
The professionals named in the filing: Architect: SANDIP HARDIKAR; Engineer: RUIKERAND ASSOCIATES; Chartered Accountant: DIPAK MEKHALE & COMPANY; Chartered Accountant: SIDDHARTH SATCHIDANAND SMART; Chartered Accountant: DIPAK MADHAVRAO MEKHALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHEETALKUNJ SAHAKARI GRUHARACHANA SANSATHA MARYADIT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback