Sheetal Sapphire

By Sheetal Developers

RG-MH-27788 · RERA P51900024408 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 48 months from the original
1 of 11Construction stages donefurthest along: Plinth, 75%
24 of 24Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Sheetal Sapphire is a Residential / Group Housing project by Sheetal Developers in Mumbai City, Maharashtra, registered with MahaRERA as P51900024408 on 11 Feb 2020. Possession is promised by 31 Dec 2030. The completion date has moved by 48 months from the original filing. 0 of the 24 units on this registration are recorded sold or booked, and 1 of 11 construction stages are filed complete.

At a glance

Project

  • NameSheetal Sapphire
  • TypeResidential / Group Housing
  • Location
    • Shankarmatham Road Telang Cross Road
    • Matunga CR
    • Fnorth-400019
    • Ward FNorth
    • Mumbai City
    • 400019
  • Pincode400019
  • RERA no.P51900024408
  • ReraGenie IDRG-MH-27788

Builder

  • NameSheetal Developers
  • Entity typePartnership
  • PartnerJAYESH KHIMJI HARIA
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2020First promiseDec 2026Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Feb 2020
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Dec 2026)
  • Buildings1 building record
  • Documents filed95 files

Current status

0%0 of 24 units booked
41.8%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sheetal VarshaNA231323124

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 75%.

Sheetal Varsha: 22% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)60%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed30

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots30
Closed/Covered30

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area543 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
Hiren Lajpatrai JasaniMumbai CityMumbai City

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI2186.02
Proposed, not sanctioned2,186 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSheetal Smruti JVPD Scheme Vile Parle West Mumbai 400056
Estimated costRs 15.45 cr
Cost incurredRs 6.46 cr
Work done41.83%
BuildingWingEstimatedIncurred
Sheetal VarshaNARs 14.70 crRs 6.46 cr
-NARs 75.00 lakh-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectP N Bhobe & Associates
EngineerChandresh Chandrakant Gala
EngineerSK Consultants & Engineers
EngineerS K Consultants & Engineers
Chartered AccountantVaidya Trivedi Shah Associates LLP
Chartered AccountantBhavesh Rathod & Co
Chartered AccountantN B Sayed & Associates
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Sheetal Developers-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA29092517968Dec 2026 → Dec 2030

Reason as filed by the promoterDelayed due to pending approvals from Estate department & BMC for further CC

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Sep 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Sep 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rera form 1.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - Sheetal Sapphire as on June 2026.pdf20 Jul 2026
Withdrawal Update Form 3File: Form 3 - Sheetal Sapphire as on June 2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1 - Sheetal Sapphire as on March 2026.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 - Sheetal Sapphire as on March 2026.pdf19 Apr 2026
Withdrawal Update Form 3File: Form 3 - Sheetal Sapphire as on March 2026.pdf19 Apr 2026
Withdrawal Update Form 1File: Form 1 - Sheetal Sapphire as on Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 2File: Form 2 - Sheetal Sapphire as on Dec 2025.pdf23 Jan 2026
Withdrawal Update Form 3File: Form 3 of Sheetal Sapphire as on 31-12-2025.pdf23 Jan 2026
Withdrawal Update Form 1File: Form 1 - Sheetal Varsha as on Sep 2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 - Sheetal Sapphire as on Sep 2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 - Sheetal Sapphire as on Sep 2025.pdf18 Oct 2025
Form 5 (FY 2019-2020)File: Form 5 Sheetal Varsha FY 2019-20.pdf30 Sep 2025
Form 5 (FY 2020-2021)File: Form 5 Sheetal Varsha FY 2020-21.pdf30 Sep 2025
Form 5 (FY 2021-2022)File: Form 5 Sheetal Varsha FY 2021-22.pdf30 Sep 2025
Form 5 (FY 2022-2023)File: Form 5 Sheetal Varsha FY 2022-23.pdf30 Sep 2025
Form 5 (FY 2023-2024)File: Form 5 Sheetal Varsha FY 2023-24.pdf30 Sep 2025
Form 1File: Form 1 - Sheetal Varsha as on March 2025.pdf26 Sep 2025
Form 2File: Form 2 - Sheetal Varsha as on March 2025.pdf26 Sep 2025
Form 3File: Form 3 - Sheetal Varsha as on March 2025.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Sheetal Varsha as on March 2025.pdf26 Sep 2025
Layout approvalFile: 1-5.pdf16 Sep 2025
Layout approvalFile: 2-5.pdf16 Sep 2025
Layout approvalFile: 3-5.pdf16 Sep 2025
Layout approvalFile: 4-5.pdf16 Sep 2025
Layout approvalFile: 5-5.pdf16 Sep 2025
Building plan approvalFile: 1-5.pdf16 Sep 2025
Building plan approvalFile: 2-5.pdf16 Sep 2025
Building plan approvalFile: 3-5.pdf16 Sep 2025
Building plan approvalFile: 4-5.pdf16 Sep 2025
Building plan approvalFile: 5-5.pdf16 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 - Sheetal Varsha for FY 2024-25.pdf13 Sep 2025
Form 1File: Form 1 - Sheetal Varsha as on June 2025.pdf20 Jul 2025
Form 2File: Form 2 - Sheetal Varsha as on June 2025.pdf20 Jul 2025
Form 3File: Form 3 - Sheetal Varsha as on June 2025.pdf20 Jul 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Sheetal Varsha as on June 2025.pdf20 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SD-FORM 1-11-04-2025.pdf12 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Sheetal Varsha as on 31-03-2025.pdf12 Jun 2025
Commencement Certificates / NA Order for plotted developmentFile: Screenshot_2025-02-19-13-21-02-91_e2d5b3f32b79de1d45acd1fad96fbb0f (2).pdf20 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Screenshot_2025-02-19-13-21-27-12_e2d5b3f32b79de1d45acd1fad96fbb0f (1).pdf20 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Screenshot_2025-02-19-13-21-50-12_e2d5b3f32b79de1d45acd1fad96fbb0f (1).pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sheetal developer Certificate Scan.pdf24 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sheetal Developer Form 5 Scan 10-Oct-23.pdf16 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sheetal developers-MAHARERA-form 2-engineers certificate.pdf24 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 2022 1.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 2022 2.pdf23 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 2022 3.pdf23 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: REVISED_CA_CERT.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sheetal Developers Rera Certificate Scan Jul 22 (1).pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sheetal Developers Form 5 Mar 20 Scan Jan 22 (2).pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sheetal Developers Rera Certificate Scan Jul 22 (1).pdf23 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Annexure 'A'--Jayesh Khimji Haria.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Annexure 'A'--Jayshree Jayesh Haria.pdf20 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA Annexure 'A'--Jairaj Jayesh Haria.pdf20 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Sheetal Developers-MahaRERA-Format A signed copy.pdf29 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATED TILL 2023.pdf9 Jun 2022
Commencement Certificates / NA Order for plotted developmentFile: CC REVALIDATION (25-05-2022).pdf26 May 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 1.pdf25 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 2.pdf25 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 3.pdf25 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sheetal Developers Form 5 Mar 20 Scan Jan 22-1.pdf25 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sheetal Developers Form 5 Mar 20 Scan Jan 22-2.pdf25 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sheetal Developers Form 5 Mar 20 Scan Jan 22-3.pdf25 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sheetal Developers Form 5 Scan Jan 22_1-1.pdf4 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sheetal Developers Form 5 Scan Jan 22_2-2.pdf4 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sheetal Developers Form 5 Scan Jan 22_3-end.pdf4 Jan 2022
OtherFile: MAHARERA-signed copy of format 'D' --CC upto plinth level- 20 part floors.pdf14 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: MATUNGA-SHEETAL VARSHA-Commencement Certificate-1.pdf30 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: MATUNGA-SHEETAL VARSHA-Commencement Certificate-2.pdf30 Jan 2020
Declaration in FORM BFile: jasani bhuvan-RERA-form B-Sheetal Developers.pdf30 Jan 2020
Declaration in FORM BFile: jasani bhuvan-RERA-form B-Sheetal Developers (2).pdf30 Jan 2020
Declaration in FORM BFile: jasani bhuvan-RERA-form B-Sheetal Developers (3).pdf30 Jan 2020
Declaration in FORM BFile: jasani bhuvan-RERA-form B-Sheetal Developers (4).pdf30 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-1.pdf21 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-2.pdf21 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-3.pdf21 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sheetal developers-MAHARERA-form 2-engineers certificate.pdf21 Jan 2020
Proforma of Allotment letterFile: MAHARERA-Draft Agreement for Sale.pdf21 Jan 2020
Proforma of Allotment letterFile: RERA-Draft Allotment Letter-Sheetal Developers.pdf21 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sheetal Developers - Form 3 - RERA certificate.pdf20 Jan 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Bhoomi Premium TowerPlot no 6 Sector 34C OWE Kharghar Navi Mumbai67CompletedJan 2011Jan 2011

How this compares with Mumbai City

0%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one moved by 48 months
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sheetal Sapphire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga CR780+ in Mumbai City

Builder: Sheetal Developers

SHEETAL DEVELOPERS has 4 registrations on MahaRERA, including SHREE BALAJI and SHEETAL STANDARD BATTERIES. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Sheetal Sapphire is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sheetal Sapphire?

The registered promoter entity is Sheetal Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sheetal Sapphire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sheetal Sapphire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sheetal Sapphire?

The professionals named in the filing: Architect: P N Bhobe & Associates; Engineer: Chandresh Chandrakant Gala; Engineer: SK Consultants & Engineers; Engineer: S K Consultants & Engineers; Chartered Accountant: Vaidya Trivedi Shah Associates LLP; Chartered Accountant: Bhavesh Rathod & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sheetal Sapphire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sheetal Sapphire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sheetal Sapphire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.