Home / Browse projects / Mumbai Suburban, Maharashtra / SHEETAL OM JAY ARADHANA

Completed No litigation declared Residential / Group Housing project

SHEETAL OM JAY ARADHANA

By D.G.LAND DEVELOPERS PRIVATE LIMITED

RG-MH-10815 · RERA P51800000446 · Last updated on MahaRERA portal: 19 Jan 2024

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Completion date moved by 27 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2021Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Internal walls, 40%
3Complaints at MahaRERAon this registration
Jump to the 22 documents Report an error

SHEETAL OM JAY ARADHANA is a Residential / Group Housing project by D.G.LAND DEVELOPERS PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800000446 on 18 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2021. The completion date has moved by 27 months from the original filing. 3 complaints are on record with the regulator.

At a glance

Project

  • NameSHEETAL OM JAY ARADHANA
  • TypeResidential / Group Housing
  • Location
    • MALAD WEST
    • SOMWARI BAZAR
    • Borivali
    • Mumbai Suburban
    • 400064
  • Pincode400064
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800000446
  • ReraGenie IDRG-MH-10815

Builder

  • NameD.G.LAND DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • ChairpersonBRAHMDEV DUDHNATH SHUKLA
  • Managing DirectorSURAJDEV DUDHNATH SHUKLA
  • Other registrations14 more →
  • Completed4 of 15
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredJul 2017First promiseDec 2018Revised toMar 2021Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Jul 2017
  • Promised completion31 Mar 2021
  • Revised completionRevised to 31 Mar 2021 (originally 31 Dec 2018)
  • Buildings1 building record
  • Documents filed22 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHEETAL OM JAY ARADHANANA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 40%.

SHEETAL OM JAY ARADHANA: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure15%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises5%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.5%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered31

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,118 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2913.98
Proposed, not sanctioned2,150 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAAREY ROAD , GOREGAON EAST MUMBAI

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANISH SHAH
EngineerANKUSH MOHITE AND ASSOCIATES
PartnerRole in project
D.G.LAND DEVELOPERS PRIVATE LIMITED-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800001436Dec 2018 → Dec 2019

Reason as filed by the promoterSubject : Application for Extension of Project Completion Date. Project Registration No : P51800000446 Project - SHEETAL OM JAY ARADHANA Sir, We are registered under above mentioned number and seek extension of project completion date on following grounds. Facts : Project applied : July 2017 Construction : Captioned Project is single building and is completed Construction for all 20 floors. Delivery : We have offered/delivered to all the persons whom who have sold/ allotted flat up to 15 floors and there is no dispute with any persons for said project. Expenses Made : Met within Budget . A cop

EXT51800008433Dec 2018 → Mar 2021

Reason as filed by the promoterTo, The Hon`ble Authorities, MAHARERA, SRA Building, Bandra East, Mumbai Subject : Extension of project for the period up to 31-3-2021 ---------------------------------------------------------------------- MAHARERA NO - P51800000446 Dear Sir, Captioned project is a redevelopment Project. Captioned project has been approved by MCGM for 21 Floors and Part 22 nd Floor. A copy of CC has been enclosed herewith. We have Completed 18th Floor constructions and Obtained Occupation certificate for 18 Floors and accordingly Form - 4 for completion of part of building has been uploaded for 18 floor. We ha

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC006000000110760HARSHALA JAYENDRA RAUT & ANR.D G LAND DEVELOPERS PVT LTD30/08/2019
CC006000000056675Harishchandra Vinayak GavandeD.G.LAND DEVELOPERS PRIVATE LIMITED23/10/2018
CC006000000171568Shyamsunder vithoba dhokeD.G.LAND DEVELOPERS PVT. LTD17/11/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Jan 2024

Documents filed22

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2375552_OC_signed.pdf19 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: OMJ CC.pdf1 Nov 2021
Declaration about Commencement CertificateFile: omj cc declation.pdf1 Nov 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OMJ OC 18TH FLOOR.pdf6 Oct 2020
Architect’s Certificate on Completion of Project (Form 4)File: FORM-4-omj.pdf6 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OMJ-Architect certificate.pdf8 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OMJ-Architect certificate.pdf8 Feb 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: OMJ-Architect certificate.pdf8 Feb 2019
Certificates of CA (Form 5)File: OMJ.pdf30 Sep 2018
Declaration in FORM BFile: OMJ-FORM-B.pdf17 Jul 2017
Proforma of Allotment letterFile: OMJ-RERA-AGR-FINAL.pdf17 Jul 2017
Building plan approvalFile: OMJ-IOD-COMP.pdf15 Jul 2017
Layout approvalFile: OMJ-CONCESSION-PLAN-COMP.pdf15 Jul 2017
PAN CardFile: D G LAND DEVELOPER PRIVATE LIMITED PAN.pdf15 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - COMP.pdf15 Jul 2017
Details of encumbrancesFile: OMJ-ENCUMBRANCE.pdf15 Jul 2017
Copy of Layout Approval (in case of layout)File: OMJ-CONCESSION-PLAN-COMP.pdf15 Jul 2017
Building Plan Approval (IOD)File: OMJ-IOD-COMP.pdf15 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: 11 CC 15-03-2017.pdf15 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC CERTIFICATE - OMJ - COMP.pdf15 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: OMJ-FORM-2 Aradhna.pdf15 Jul 2017
Certificates of CA (Form 3)File: OMJ-FORM-3.pdf15 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 27 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHEETAL OM JAY ARADHANA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SOMWARI BAZAR6,700+ in Mumbai Suburban

2 kmSHEETAL OM JAY ARADHANACompleted 139Lapsed / revoked 81Other 142Dot size: filed unitsN

Filed coordinates, straight-line distance. 362 registered projects within 2 km.

Builder: D.G.LAND DEVELOPERS PRIVATE LIMITED

D.G. LAND DEVELOPERS PRIVATE LIMITED has 15 registrations on MahaRERA, including SHEETAL ANIKET and SHEETAL OM JAY ARADHANA. Its filings disclose 6 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHEETAL OM JAY ARADHANA is delayed beyond 31 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHEETAL OM JAY ARADHANA?

The registered promoter entity is D.G.LAND DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHEETAL OM JAY ARADHANA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SHEETAL OM JAY ARADHANA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SHEETAL OM JAY ARADHANA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHEETAL OM JAY ARADHANA?

The professionals named in the filing: Architect: MANISH SHAH; Engineer: ANKUSH MOHITE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHEETAL OM JAY ARADHANA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHEETAL OM JAY ARADHANA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHEETAL OM JAY ARADHANA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.