ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / SHAYONA

Registered No litigation declared Residential / Group Housing project

SHAYONA

By DEVESH NARENDRA JANI

RG-MH-05465 · RERA P51900051173 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
27 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

SHAYONA is a Residential / Group Housing project by DEVESH NARENDRA JANI in Mumbai City, Maharashtra, registered with MahaRERA as P51900051173 on 1 Jun 2023. Possession is promised by 31 Dec 2026. 2 of the 29 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHAYONA
  • TypeResidential / Group Housing
  • Location
    • DR BA ROAD
    • MATUNGA EAST
    • Mumbai City
    • 400019
  • Pincode400019
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900051173
  • ReraGenie IDRG-MH-05465

Builder

  • NameDEVESH NARENDRA JANI
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Jun 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed81 files

Current status

7%2 of 29 units booked
85.6%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAYONANA11929029

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHAYONA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered25

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area576 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2025
LandownerVillageDistrict
RAHUL RAMESHCHANDRA VASANIFnorth-400019Mumbai City
RAMESHCHANDRA KISHORELAL VASANIFnorth-400019Mumbai City

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2527.58
Proposed, not sanctioned2,515 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANK OF INDIA BHAU DHAJI ROAD BEH JAIN TEMPLE MUMBAI 400019
Estimated costRs 13.00 cr
Cost incurredRs 11.13 cr
Work done85.63%
BuildingWingEstimatedIncurred
SHAYONANARs 13.00 crRs 11.13 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS S ASSOCIATES
EngineerSwapnil S Jadhav
Chartered AccountantPRAVIN K CHHEDA & CO
Chartered AccountantParas Jain
PartnerRole in project
DEVESH NARENDRA JANI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Mar 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form1 Architect Certificate.pdf27 May 2026
Withdrawal Update Form 2File: Form - 2 Engineer Certificate.pdf27 May 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATEs.pdf27 May 2026
Form 2A (FY 2025-2026)File: Form 2A Quality Assurance Certificate.pdf22 May 2026
Form 2A (FY 2024-2025)File: Form 2A Quality Assurance Certificate.pdf22 May 2026
Form 5 (FY 2023-2024)File: Form 5 Annual Report Statement of Accounts.pdf16 May 2026
Form 5 (FY 2024-2025)File: Form 5 Annual Statements of Accounts.pdf16 May 2026
Withdrawal Update Form 1File: form1 Architect Certificate.pdf15 May 2026
Withdrawal Update Form 2File: Form - 2 Engineer Certificate.pdf15 May 2026
Withdrawal Update Form 3File: FORM 3 CA CERTIFICATEs.pdf15 May 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf23 Mar 2026
Withdrawal Update Form 2File: Form - 2 Engineer Certificate.pdf23 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf23 Mar 2026
Building plan approvalFile: Amended Dwg.pdf21 Mar 2026
Commencement certificateFile: Commecement Certificate.pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf21 Mar 2026
Withdrawal Update Form 2File: Form - 2 Engineer Certificate.pdf21 Mar 2026
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf21 Mar 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf16 Oct 2025
Withdrawal Update Form 2File: Form - 2 Eng. cert..pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf16 Oct 2025
Commencement certificateFile: SHAYONA FurtherCC_signed.pdf11 Sep 2025
Withdrawal Update Form 1File: Form 1 Architect Certificate.pdf11 Sep 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate.pdf11 Sep 2025
Withdrawal Update Form 3File: Form 3 CA Certificate.pdf11 Sep 2025
Form 1File: Form 1 Architect Certificate.pdf20 Aug 2025
Form 2File: Form 2 Engineer Certificate.pdf20 Aug 2025
Form 3File: Form 3 CA Certificate.pdf20 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked Inventory.pdf20 Aug 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERTIFICATE.pdf22 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate - SHAYONA.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 CA Certificate.pdf21 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Annual Report Statement of Accounts.pdf9 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA Certificate.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form - 2A - Engineer's Certificate (PPQuality Assurance).pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA Certificate.pdf19 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: SHAYONA FurtherCC_signed.pdf13 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT.pdf19 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Architect Certificate.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Eng cert.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf19 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf26 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer certificate.pdf26 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 1 Architect Certificate.pdf26 Jul 2023
Other - LegalFile: PR CARD.pdf10 May 2023
Details of encumbrances concerned to FinanceFile: No Encumbraces ltr.pdf28 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbraces ltr.pdf28 Apr 2023
Other - TechnicalFile: Declaration about technical query.pdf28 Apr 2023
CERSAI detailsFile: CERSAI declaration.pdf26 Apr 2023
Layout approvalFile: Declaration for no layout.pdf17 Apr 2023
Building plan approvalFile: Approved IOD 1.pdf17 Apr 2023
Building plan approvalFile: Approved IOD 2.pdf17 Apr 2023
PAN CardFile: Pan Card.pdf17 Apr 2023
Copy of the legal title reportFile: Title Certificate new (2).pdf17 Apr 2023
Details of encumbrances concerned to FinanceFile: No Encumbraces ltr.pdf17 Apr 2023
Details of encumbrances concerned to LegalFile: No Encumbraces ltr.pdf17 Apr 2023
Copy of Layout Approval (in case of layout)File: Declaration for no layout.pdf17 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD 1.pdf17 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Approved IOD 2.pdf17 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf17 Apr 2023
Declaration about Commencement CertificateFile: Declaration about Commencement Cert.pdf17 Apr 2023
Declaration in FORM BFile: Form B Affidavit cum declaration developer.pdf17 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266804197_For_Asset_Based_Search_24_04_2023_11_35_43_567.pdf17 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf17 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Diclosure of Int in Other Real Estate Organixation.pdf17 Apr 2023
Proforma of Allotment letterFile: Allotment Letter.pdf17 Apr 2023
Proforma of Agreement for saleFile: ageement for sale.pdf17 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Seprate Bank Account.pdf17 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation report allotment letter.pdf17 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
MATRU ASHISHCS NO 204 10 OF MATUNGA DIVISION PLOT NO 256 OF DADAR MATUNGA ESATE20CompletedDec 2018Late, Dec 2019

How this compares with Mumbai City

7%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAYONA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MATUNGA EAST780+ in Mumbai City

2 kmSHAYONACompleted 90Lapsed / revoked 67Other 93Dot size: filed unitsN

Filed coordinates, straight-line distance. 250 registered projects within 2 km.

Builder: DEVESH NARENDRA JANI

DEVESH NARENDRA JANI has 3 registrations on MahaRERA, including MATRU ASHISH and PURANDARE PARK CHSL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if SHAYONA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAYONA?

The registered promoter entity is DEVESH NARENDRA JANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAYONA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAYONA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAYONA?

The professionals named in the filing: Architect: S S ASSOCIATES; Engineer: Swapnil S Jadhav; Chartered Accountant: PRAVIN K CHHEDA & CO; Chartered Accountant: Paras Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAYONA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAYONA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAYONA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.