ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Shatataraka Dilip Kunj

Registered No litigation declared Others project

Shatataraka Dilip Kunj

By SMARTS

RG-MH-31223 · RERA P51700079557 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Stilt Floor, 90%
26 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Shatataraka Dilip Kunj is a Others project by SMARTS in Thane, Maharashtra, registered with MahaRERA as P51700079557 on 12 Mar 2025. Possession is promised by 31 Dec 2027. 9 of the 35 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameShatataraka Dilip Kunj
  • TypeOthers
  • Location
    • Baji Prabhu Deshpande Marg
    • Vishnu Nagar
    • Naupada
    • Thane
    • Thane (M Corp.)
    • 400602
  • Pincode400602
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700079557
  • ReraGenie IDRG-MH-31223

Builder

  • NameSMARTS
  • Entity typePartnership

Key dates

this monthRegisteredMar 2025PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on12 Mar 2025
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed68 files

Current status

26%9 of 35 units booked
70.6%Work done, per cost certificate

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Shatataraka Dilip KunjNA97211435

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

Shatataraka Dilip Kunj: 32% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)0%
Podiums (if any)0%
Plinth80%
Stilt Floor90%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed87

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots87
Closed/Covered42
Open Space45

Land and ownership7

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area918 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on27 Sep 2025
LandownerVillageDistrict
Kunda Sharad RautThane (M Corp.)Thane
Sharad K rautThane (M Corp.)Thane
Subhash narsinha KaleThane (M Corp.)Thane
Sudhir Prabhakar GadkariThane (M Corp.)Thane
The Thane Bharat Sahakari Bank LimitedThane (M Corp.)Thane
Vishwa Hindu ParishadThane (M Corp.)Thane
Ramsing PatilThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI3303.24
Proposed, not sanctioned3,303 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHATATARAKA, BAJI PRABHU DESHPANDE MARG, THANE WEST 400602
Estimated costRs 9.00 cr
Cost incurredRs 6.35 cr
Work done70.56%
BuildingWingEstimatedIncurred
Shatataraka Dilip KunjNARs 5.00 crRs 4.75 cr
-NARs 4.00 crRs 1.60 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShashi Deshmukh
EngineerJayesh Sohoni Vijay Sohoni
Chartered AccountantAniruddh Ramesh Kulkarni
Chartered AccountantY J PADHYE & CO
Chartered AccountantRUPALI LAUKIK GODBOLE
PartnerRole in project
SMARTS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form-1 Jan to March 2026 (Shatataraka SMARTS).pdf18 Apr 2026
Withdrawal Update Form 2File: Form-2 Jan to March 2026 (Shatataraka SMARTS) (1).pdf18 Apr 2026
Withdrawal Update Form 3File: FORM 3 SIGN_compressed (1).pdf18 Apr 2026
Withdrawal Update Form 1File: Form -1 (Shatataraka).pdf24 Jan 2026
Withdrawal Update Form 2File: Form - 2 Shatataraka Dilip Kunj.pdf24 Jan 2026
Withdrawal Update Form 3File: Final form 3 of Shatataraka Dilip Kunj Q3 FY 2025-26.pdf24 Jan 2026
Withdrawal Update Form 1File: Final Form - 1 (Shatataraka Dilip Kunj-SMARTS).pdf26 Oct 2025
Withdrawal Update Form 2File: Final Form - 2 (Shatataraka Bldg SMARTS.pdf26 Oct 2025
Withdrawal Update Form 3File: FINAL SMARTS Signed Form 3.pdf26 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A-2025 (Shatataraka SMARTS).pdf9 Oct 2025
Withdrawal Update Form 1File: Final Signed online generated form-1 - QTR1.pdf27 Sep 2025
Withdrawal Update Form 1File: Final Signed online generated form-1 - QTR1.pdf27 Sep 2025
Withdrawal Update Form 2File: Final Signed online generated form-2 - QTR1.pdf27 Sep 2025
Withdrawal Update Form 2File: Final Signed online generated form-2 - QTR1.pdf27 Sep 2025
Withdrawal Update Form 3File: Final Signed online generated form-3 - QTR1.pdf27 Sep 2025
Withdrawal Update Form 3File: Final Signed online generated form-3 - QTR1.pdf27 Sep 2025
Form 5 (FY 2024-2025)File: Final Smarts Form 5.pdf27 Sep 2025
Withdrawal Update Form 1File: Final Signed online generated form-1 - QTR1.pdf6 Aug 2025
Withdrawal Update Form 2File: Final Signed online generated form-2 - QTR1.pdf6 Aug 2025
Withdrawal Update Form 3File: Final Signed online generated form-3 - QTR1.pdf6 Aug 2025
Form 1File: Form-1 Shatataraka (Jan to March-25).pdf27 Jun 2025
Form 2File: Form-2 Shatataraka (Jan to March-25).pdf27 Jun 2025
Form 3File: Signed Form 3 of SMARTS - Q4.pdf27 Jun 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold - unsold inventory- FY 24-25 -Q4.pdf27 Jun 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Report FY 2024-25- Q4.pdf27 Jun 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Final Format - A_compressed.pdf10 Mar 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Final Format-B (TBSB) compressed.pdf10 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Shatataraka Dilip Kunj.pdf5 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: CC - mail (1).pdf5 Mar 2025
Other - FinanceFile: Declaration About Redevelopement Project.pdf5 Mar 2025
Other - FinanceFile: 2 Other - Legal.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf14 Feb 2025
Proforma of Allotment letterFile: Revised Allotement Letter.pdf9 Jan 2025
Deviation Report with respect to Allotment letterFile: Revised Deviation of Allotement Letter.pdf9 Jan 2025
Deviation Report with respect to model copy of AgreementFile: Revised Deviation of Agreement for Sale.pdf9 Jan 2025
Proforma of Agreement for saleFile: Revised Agreement for Sale.pdf9 Jan 2025
Copy of the legal title reportFile: 2 Title Report for RERA (Shatataraka)_11zon.pdf8 Jan 2025
Copy of the legal title reportFile: 2 Tilte Certificate for RERA (Dilip kunj)_11zon.pdf8 Jan 2025
Declaration in FORM BFile: 12 Affidavite cum Declaration - SMARTS - new_compressed.pdf6 Aug 2024
Other - LegalFile: 0 Shatataraka Power_compressed.pdf5 Aug 2024
Other - LegalFile: Conveyance Deed Dilip Kunj_11zon.pdf5 Aug 2024
Disclosure for secured/unsecured finance availed for the projectFile: 19 Disclosure finance.pdf24 Jul 2024
PAN CardFile: 1 SMARTS PAN CARD.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 Engineers Certificate for RERA_compressed.pdf28 Jun 2024
CERSAI detailsFile: CERSAI_Search_Report_200311798193_For_Asset_Based_Search_28_06_2024_13_17_16_896.pdf28 Jun 2024
Layout approvalFile: 4 Plan layout.PDF13 Jun 2024
Building plan approvalFile: 5 Building Plan - 1.PDF13 Jun 2024
Building plan approvalFile: 5 Building Plan - 2.PDF13 Jun 2024
Building plan approvalFile: 5 Building Plan - 3.PDF13 Jun 2024
Building plan approvalFile: 5 Building Plan - 4.PDF13 Jun 2024
Building plan approvalFile: 5 Building Plan - 5.PDF13 Jun 2024
Building plan approvalFile: 5 Building Plan - 6.PDF13 Jun 2024
Details of encumbrances concerned to FinanceFile: 3 Encumbrance.pdf13 Jun 2024
Copy of Layout Approval (in case of layout)File: 4 Plan layout.PDF13 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: 6 CC.pdf13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan - 1.PDF13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan - 2.PDF13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan - 3.PDF13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan - 4.PDF13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan - 5.PDF13 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: 5 Building Plan - 6.PDF13 Jun 2024
Declaration about Commencement CertificateFile: 7 Declaration About CC.pdf13 Jun 2024
Details of encumbrances concerned to LegalFile: 3 Encumbrance.pdf13 Jun 2024
Other - TechnicalFile: 11 Declaration cum Undertaking other technical.pdf13 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Atul Angre.pdf13 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Sameer Ganu.pdf13 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Shaunak Deshmukh.pdf13 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 10 Disclosure of Interest - Sumedh Patankar.pdf13 Jun 2024

How this compares with Thane

26%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Shatataraka Dilip Kunj on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Thane7,600+ in Thane

2 kmShatataraka Dilip KunjCompleted 175Lapsed / revoked 64Other 155Dot size: filed unitsN

Filed coordinates, straight-line distance. 394 registered projects within 2 km.

Builder: SMARTS

SMARTS has 1 registration on MahaRERA, including Shatataraka Dilip Kunj. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Shatataraka Dilip Kunj is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Shatataraka Dilip Kunj?

The registered promoter entity is SMARTS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Shatataraka Dilip Kunj?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Shatataraka Dilip Kunj?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Shatataraka Dilip Kunj?

The professionals named in the filing: Architect: Shashi Deshmukh; Engineer: Jayesh Sohoni Vijay Sohoni; Chartered Accountant: Aniruddh Ramesh Kulkarni; Chartered Accountant: Y J PADHYE & CO; Chartered Accountant: RUPALI LAUKIK GODBOLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Shatataraka Dilip Kunj?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Shatataraka Dilip Kunj. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Shatataraka Dilip Kunj to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.