Home / Browse projects / Nashik, Maharashtra / SHASHI SIDDHI ANNEXE
SHASHI SIDDHI ANNEXE
RG-MH-50817 · RERA P51600052603 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
Clear
- No litigation declared
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHASHI SIDDHI ANNEXE is a Residential / Group Housing project by SIDDHIVINAYAK ASSOCIATES in Nashik, Maharashtra, registered with MahaRERA as P51600052603 on 11 Sep 2023. Possession is promised by 31 Dec 2028. 16 of the 61 units on this registration are recorded sold or booked, and 8 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSHASHI SIDDHI ANNEXE
- TypeResidential / Group Housing
- Location
- NASHIK
- Nashik (M Corp.)
- 422009
- Pincode422009
- RERA no.P51600052603
- ReraGenie IDRG-MH-50817
Builder
- NameSIDDHIVINAYAK ASSOCIATES
- Entity typePartnership
- PartnersANILKUMAR PUNAMCHAND KHIVANSARA, KANTILAL KANAHYALAL LAHOTI, RONAK MAHESH SHAH, BHIKULAL BABULAL BAGMAR, ABHAY VIJAYRAJ KANKARIA, SHAMSUNDAR RAMRATAN JAJU
- Other registrations8 more →
- Completed6 of 9
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Sep 2023
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed72 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHASHI SIDDHI ANNEXE A WING | NA | 7 | 7 | 28 | 5 | 33 |
| SHASHI SIDDHI ANNEXE B WING | NA | 7 | 0 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 70%.
SHASHI SIDDHI ANNEXE A WING52%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 55% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SHASHI SIDDHI ANNEXE B WING53%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 50% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed36
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| SHASHI SIDDHI ANNEXE A WING | 0 | 14 | 14 |
| SHASHI SIDDHI ANNEXE B WING | 19 | 3 | 22 |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHASHIKALA GANPAT LENKAR | Nashik | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHASHI SIDDHI ANNEXE A WING | NA | Rs 7.37 cr | Rs 5.15 cr |
| SHASHI SIDDHI ANNEXE B WING | NA | Rs 5.80 cr | Rs 3.10 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ROHAN BABANRAO GHUGE |
| Engineer | BABANRAO Y GHUGE |
| Chartered Accountant | SANKET SANGALE |
| Chartered Accountant | MAHESH P SHAH |
| Chartered Accountant | SANKET S SANGALE |
| Partner | Role in project |
|---|---|
| SIDDHIVINAYAK ASSOCIATES | - |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500081 | Ram G | SIDDHIVINAYAK ASSOCIATES | 11/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 7 Aug 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 7 Aug 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: From 1.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: From 1.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: From 21.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: From 21.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: From 3.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: From 3.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: From 1.pdf | 25 Mar 2026 |
| Withdrawal Update Form 2File: From 2.pdf | 25 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 .pdf | 25 Mar 2026 |
| Withdrawal Update Form 1File: from 1.pdf | 4 Mar 2026 |
| Withdrawal Update Form 2File: From 2.pdf | 4 Mar 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 4 Mar 2026 |
| Withdrawal Update Form 1File: A certificate Siddhi.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: E certificate Siddhi.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Form 3 Siddhivinayak Associates.pdf | 16 Feb 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: A cert Siddhivinayak.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: E certificate Siddhivinayak.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Siddhi.pdf | 7 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddhivinayak associates form 3 CA Certificate.pdf | 3 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner.pdf | 30 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 30 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aRCHITECH CERTIFICATE.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q2 (FY 2024-25).pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner Certificate.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 16 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Siddhivinayak.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Siddhivinayak.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold - Siddhivinayak.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Q1 (FY 2024-25).pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 27 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Siddhivinayak.pdf | 16 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate - Siddhivinayak.pdf | 16 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Siddhivinayak Associates FY 23-24(Q4).pdf | 16 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_compressed.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_compressed.pdf | 20 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: siddhi sold unsold.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Siddhivinayak.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Siddhi Architect Certificate_compressed.pdf | 4 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Siddhi Engineer Certificate.pdf | 4 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Siddhi CA Certificate_compressed.pdf | 4 Nov 2023 |
| Proforma of Agreement for saleFile: agreement draft.pdf | 4 Sep 2023 |
| Deviation Report with respect to model copy of AgreementFile: Siddhiv Rera Agreement_compressed.pdf | 4 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: ilovepdf_merged.pdf | 24 Aug 2023 |
| Details of encumbrances concerned to LegalFile: ilovepdf_merged.pdf | 24 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: siddhivinayak ca certificate_compressed.pdf | 24 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23.pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23 (1).pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23 (2).pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23 (3).pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23 (4).pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23 (5).pdf | 23 Aug 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: file_22Aug23 (6).pdf | 23 Aug 2023 |
| Deviation Report with respect to Allotment letterFile: Siddhivinayak Allotment letter_compressed.pdf | 22 Aug 2023 |
| Details of encumbrances concerned to FinanceFile: ilovepdf_merged (1).pdf | 12 Aug 2023 |
| Details of encumbrances concerned to LegalFile: ilovepdf_merged (1).pdf | 12 Aug 2023 |
| Declaration about Commencement CertificateFile: SIDDHIVINAYAK - Commencement rera.pdf | 12 Aug 2023 |
| Proforma of Allotment letterFile: Allottment Letter Siddhivinayak.pdf | 12 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SIDDHIVINAYAK - Bank Account rera.pdf | 12 Aug 2023 |
| Copy of the legal title reportFile: Title Search_compressed.pdf | 9 Aug 2023 |
| Declaration in FORM BFile: Form B - Notary.pdf | 9 Aug 2023 |
| Layout approvalFile: Layout Copy.pdf | 7 Aug 2023 |
| Building plan approvalFile: Siddhivinayak Plan 01-03_compressed.pdf | 7 Aug 2023 |
| Building plan approvalFile: Siddhivinayak Plan 02-03_compressed.pdf | 7 Aug 2023 |
| Building plan approvalFile: Siddhivinayak Plan 03-03_compressed.pdf | 7 Aug 2023 |
| PAN CardFile: Firm - Pan Card.pdf | 7 Aug 2023 |
| Copy of Layout Approval (in case of layout)File: Layout Copy.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Siddhivinayak Plan 01-03_compressed.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Siddhivinayak Plan 02-03_compressed.pdf | 7 Aug 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Siddhivinayak Plan 03-03_compressed.pdf | 7 Aug 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate_compressed.pdf | 7 Aug 2023 |
| CERSAI detailsFile: CERSAI_Search_Report survey no 868 4 shashi siddhi annexe.pdf | 7 Aug 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 8 other registrations, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHASHI SIDDHI ANNEXE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NASHIK4,100+ in Nashik
STAR WORLD
DEEPAK KALYANJI CHANDE
VRAJ CENTRAL VISTA
DHAIRYA DEVELOPERS
ROONGTA TECHONE APARTMENT
SHREE TIRUMALA BUILDCON
VRAJ CAPITAL
KAPILAVASTU CREATORS
MAA BHAGWATI RESIDENCY APARTMENT
ROONGTA LANDMARKS LLP
THREE LEAVES PHASE ONE
DEEPAK INFRA AND HOMES PRIVATE LIMITED
See every Nashik project, with the district possession charts
Builder: SIDDHIVINAYAK ASSOCIATES
SIDDHIVINAYAK ASSOCIATES has 9 registrations on MahaRERA, including Dnyanesh Residency and BLOSSOM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if SHASHI SIDDHI ANNEXE is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHASHI SIDDHI ANNEXE?
The registered promoter entity is SIDDHIVINAYAK ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHASHI SIDDHI ANNEXE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SHASHI SIDDHI ANNEXE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SHASHI SIDDHI ANNEXE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHASHI SIDDHI ANNEXE?
The professionals named in the filing: Architect: ROHAN BABANRAO GHUGE; Engineer: BABANRAO Y GHUGE; Chartered Accountant: SANKET SANGALE; Chartered Accountant: MAHESH P SHAH; Chartered Accountant: SANKET S SANGALE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHASHI SIDDHI ANNEXE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback