Home / Browse projects / Pune, Maharashtra / SHANKESHWAR MARKET

Completed No litigation declared Commercial project

SHANKESHWAR MARKET

By OM BUILDCON AND REALITY

RG-MH-41502 · RERA P52100049978 · Last updated on MahaRERA portal: 21 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jan 2028Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
16 of 22Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

SHANKESHWAR MARKET is a Commercial project by OM BUILDCON AND REALITY in Pune, Maharashtra, registered with MahaRERA as P52100049978 on 6 Mar 2023. The registration is recorded completed; possession was promised by 31 Jan 2028. The completion date has moved by 24 months from the original filing. 6 of the 22 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHANKESHWAR MARKET
  • TypeCommercial
  • Location
    • PUNE CITY WEST
    • Peth
    • Haveli
    • Pune
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100049978
  • ReraGenie IDRG-MH-41502

Builder

  • NameOM BUILDCON AND REALITY
  • Entity typePartnership
  • PartnersSUREKHA SACHIN GHULE, SACHIN BALASAHEB GHULE

Key dates

this monthRegisteredMar 2023First promiseJan 2026Revised toJan 2028Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Mar 2023
  • Promised completion31 Jan 2028
  • Revised completionRevised to 31 Jan 2028 (originally 31 Jan 2026)
  • Buildings1 building record
  • Documents filed87 files

Current status

27%6 of 22 units booked
100.0%Work done, per cost certificate

Figures as on 21 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHANKESHWAR MARKETNA4402222

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SHANKESHWAR MARKET: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed33

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots33
Closed/Covered33

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area170 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 May 2025
LandownerVillageDistrict
OM BUILDCON REALITYPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation (PMC)
Permissible FSI439.44
Proposed, not sanctioned439 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMANJARI BRANCH,P O MANJARI FARM,PUNE 412307
Estimated costRs 2.13 cr
Cost incurredRs 2.13 cr
Work done100.0%
BuildingWingEstimatedIncurred
SHANKESHWAR MARKETNARs 1.74 crRs 1.74 cr
-NARs 39.15 lakhRs 39.15 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTRIPTI GUPTA
EngineerKIRAN MOHANKALKUMBE
Chartered AccountantAKSHAY KADAM AND ASSOCIATES
Chartered AccountantDnyaneshwar Shelar
PartnerRole in project
OM BUILDCON AND REALITY-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA27042620751Jan 2026 → Jan 2028

Reason as filed by the promoterThe project completion has been delayed due to pending statutory approvals and procedural timelines with various authorities, along with ongoing external development works and final testing of essential services. The promoter is undertaking necessary compliance, quality checks, and completion formalities to ensure adherence to sanctioned plans and regulatory requirements. The proposed extension date is 31st Jan 2028. We have filed QPR for quarter 4 Jan-Mar 2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Feb 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Feb 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Form 2A_Mar 2023.pdf21 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A_Mar 2024.pdf21 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A_Mar 26.pdf21 Jul 2026
Form 5 (FY 2023-2024)File: Form 5 FY 23-24 Om Build and Reality Signed.pdf21 Jul 2026
Form 5 (FY 2022-2023)File: FORM 5 2022-23.pdf21 Jul 2026
Occupational CertificateFile: FORM 4.pdf21 Jul 2026
Withdrawal Update Form 1File: FORM 1_JUNE 26.pdf15 Jul 2026
Withdrawal Update Form 2File: sIGNED FORM2_JUN.pdf15 Jul 2026
Withdrawal Update Form 3File: 1 Final Form 3_June 26.pdf15 Jul 2026
Occupational CertificateFile: Full Occpancy Certificate.pdf21 May 2026
Form 5 (FY 2025-2026)File: updated_Signed_Form 5 FY 25-26_Om Buildcon and Reality.pdf28 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf18 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf18 Apr 2026
Withdrawal Update Form 3File: 1Form 3_final.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf17 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf17 Apr 2026
Withdrawal Update Form 3File: Form 3_Final_Mar 26.pdf17 Apr 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate - Dec 2025.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2 Engineers Certificate - Dec 2025.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf31 Jan 2026
Withdrawal Update Form 1File: Form 1 Architect Certificate Sept 25.pdf20 Nov 2025
Withdrawal Update Form 2File: Form 2 Engineer Certificate Sept 25.pdf20 Nov 2025
Withdrawal Update Form 3File: Form 3 CA Certificate Sept 25.pdf20 Nov 2025
Form 5 (FY 2024-2025)File: Form 5 FY 24-25_Om Build & Reality.pdf30 Sep 2025
Withdrawal Update Form 1File: Arch Certificate June-25.pdf30 Aug 2025
Withdrawal Update Form 2File: Engineering Certificate June-25.pdf30 Aug 2025
Withdrawal Update Form 3File: Form 3 June 25 Shankeshwar Market.pdf30 Aug 2025
Form 2A (FY 2024-2025)File: Form 2A om buildcon and reality qty Mar.-25.pdf30 Jul 2025
Form 1File: Form 1 Architect Certificate March 25 OBR.pdf30 May 2025
Form 2File: Form 2 Engineer Certificate March 25 OBR.pdf30 May 2025
Form 3File: Form 3 Mar 25.pdf30 May 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory March 25.pdf30 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate March 25 OBR.pdf30 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate March 25 OBR.pdf30 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory March 25.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Om Buildcon and Reality Dec 24.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24 Shankeshwar Market_11zon.pdf25 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Om Buildcon and Reality Dec 24.pdf25 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Om Buildcon and Reality Dec 24.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 JUNE.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPLOAD.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate June 24.pdf25 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Sept 24 Om Build and Reality.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sept 24 Om Build and Reality.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Sept 24.pdf25 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24 Om Build and Reality Signed.pdf11 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 June 24.pdf20 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold June 24.pdf20 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 24 Shankeshwar Market.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2 March 24 Shankeshwar Market.pdf28 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24 Quality Engineer Shankeshwar Market.pdf28 May 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Mar 24.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 Mar 24 Shankeshwar Market 11zon.pdf28 May 2024
Declaration about Commencement CertificateFile: Latest Commencement Certificate_Shankeshwaram Market.pdf1 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: fORM 3 JUNE 23_compressed.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEPT 23_compressed.pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 23_compressed.pdf20 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account details including no encumbrances on the Bank Account or no escrow o20 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2022-23.pdf19 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT JUNE23.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT SEPT23.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT DEC23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate June23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate Sept23.pdf15 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineer Certificate dec23.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: Shankeshwar Market sold unsold June 23.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: Shankeshwar Market sold unsold Sept 23.pdf15 Mar 2024
Disclosure of sold/ booked inventoryFile: Shankeshwar Market sold unsold dec 23.pdf15 Mar 2024
Layout approvalFile: blue print_compressed.pdf22 Feb 2023
Building plan approvalFile: blue print_compressed.pdf22 Feb 2023
Copy of Layout Approval (in case of layout)File: blue print_compressed.pdf22 Feb 2023
Building Plan Approval / NA Order for plotted developmentFile: blue print_compressed.pdf22 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of int.pdf22 Feb 2023
Details of encumbrances concerned to FinanceFile: Encombrranace certificate.pdf16 Feb 2023
Details of encumbrances concerned to LegalFile: Encombrranace certificate.pdf16 Feb 2023
Declaration about Commencement CertificateFile: commecement certificate.pdf16 Feb 2023
CERSAI detailsFile: cersai.pdf16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPDATED_compressed.pdf16 Feb 2023
Proforma of Allotment letterFile: ALLOTEMENT LETTER.pdf16 Feb 2023
Proforma of Agreement for saleFile: agreement.pdf16 Feb 2023

How this compares with Pune

27%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHANKESHWAR MARKET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE CITY WEST13,700+ in Pune

2 kmSHANKESHWAR MARKETCompleted 180Lapsed / revoked 134Other 173Dot size: filed unitsN

Filed coordinates, straight-line distance. 487 registered projects within 2 km.

Builder: OM BUILDCON AND REALITY

OM BUILDCON AND REALITY has 1 registration on MahaRERA, including SHANKESHWAR MARKET. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SHANKESHWAR MARKET is delayed beyond 31 Jan 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHANKESHWAR MARKET?

The registered promoter entity is OM BUILDCON AND REALITY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHANKESHWAR MARKET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHANKESHWAR MARKET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHANKESHWAR MARKET?

The professionals named in the filing: Architect: TRIPTI GUPTA; Engineer: KIRAN MOHANKALKUMBE; Chartered Accountant: AKSHAY KADAM AND ASSOCIATES; Chartered Accountant: Dnyaneshwar Shelar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHANKESHWAR MARKET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHANKESHWAR MARKET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHANKESHWAR MARKET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.