Home / Browse projects / Mumbai Suburban, Maharashtra / SHAKTI TROMBAY 88

Completed No litigation declared Others project

SHAKTI TROMBAY 88

By VASHU RAHEJA SONS REALTY LLP

RG-MH-39105 · RERA P51800049964 · Last updated on MahaRERA portal: 9 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Internal walls, 95%
34 of 54Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

SHAKTI TROMBAY 88 is a Others project by VASHU RAHEJA SONS REALTY LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049964 on 6 Mar 2023. The registration is recorded completed; possession was promised by 29 Dec 2025. The completion date has moved by 6 months from the original filing. 20 of the 54 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHAKTI TROMBAY 88
  • TypeOthers
  • Location
    • VILLAGE TURBHE
    • TROMBAY
    • Turbhe
    • Kurla
    • Mumbai Suburban
    • 400088
  • Pincode400088
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049964
  • ReraGenie IDRG-MH-39105

Builder

  • NameVASHU RAHEJA SONS REALTY LLP
  • Entity typePartnership
  • PartnersSUSHIL VASHU RAHEJA, NITIN VASHU RAHEJA, KIRAN SUSHIL RAHEJA, DISHA NITIN RAHEJA

Key dates

this monthRegisteredMar 2023First promiseJun 2025Revised toDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Mar 2023
  • Promised completion29 Dec 2025
  • Revised completionRevised to 29 Dec 2025 (originally 30 Jun 2025)
  • Buildings1 building record
  • Documents filed123 files

Current status

37%20 of 54 units booked
93.5%Work done, per cost certificate

Figures as on 9 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAKTI TROMBAY88NA101052254

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

SHAKTI TROMBAY88: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 9 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes90%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Open Space20

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area820 sq m
Land owned byNot the promoter
Named landowners5
Encumbrance on the landDeclared none
Declared on11 Jun 2025
LandownerVillageDistrict
VASHU RAHEJA SONS REALTY LLPChemburMumbai Suburban
CHINTAMANI MADHUKAR KOLIKurlaMumbai Suburban
KADAMBARI HEMANT KOLIThane (M Corp.)Thane
KHUSHI HEMANT KOLIThane (M Corp.)Thane
VED HEMANT KOLIThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI2214.0
Proposed, not sanctioned2,213 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBASANT VIHAR COMMERCIAL COMPLEX CHS DR C G ROAD NEAR BASANT CINEMA MUMBAI 400 074
Estimated costRs 6.63 cr
Cost incurredRs 6.20 cr
Work done93.52%
BuildingWingEstimatedIncurred
SHAKTI TROMBAY88NARs 5.68 crRs 5.39 cr
-NARs 94.64 lakhRs 80.92 lakh

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB H WADHWA AND CHHADVA ASSOCIATES
ArchitectTEJAS ARUN CHHADVA
EngineerAssociated Structural Engineers LLP
EngineerVIJAY T NARANG
Chartered AccountantM/s. TDK & Co.
Chartered AccountantV Mangal And Company
Chartered AccountantVIKAS MANGAL
Chartered AccountantTDK & CO
PartnerRole in project
VASHU RAHEJA SONS REALTY LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18062501669Jun 2025 → Dec 2025

Reason as filed by the promoterReply attached herewith.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OCC Letter dated 01_09_25.pdf9 Jan 2026
Withdrawal Update Form 1File: Form 1 Sep 2025.pdf11 Oct 2025
Withdrawal Update Form 2File: FORM 2_ENGG Certificate Sep 2025.pdf11 Oct 2025
Withdrawal Update Form 3File: Form 3 Trombay Signed.pdf11 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 31_03_2025.pdf24 Sep 2025
Form 5 (FY 2022-2023)File: Signed Annual Report 31_03_23.pdf7 Aug 2025
Form 5 (FY 2023-2024)File: Signed Annual Report as on 31st March 2024 FORM 5.pdf7 Aug 2025
Form 2A (FY 2023-2024)File: FORM 2A 23TO 24_0001.pdf2 Jul 2025
Form 2A (FY 2022-2023)File: FORM 2A 22 TO 23_0001.pdf2 Jul 2025
Form 1File: form 1.pdf1 Jul 2025
Form 2File: SIGNED FORM 2 SHAKTI 31032023 -1.pdf1 Jul 2025
Form 3File: SIGNED FORM 3 SHAKTI 31032023.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD SIGNED.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD dsc.pdf1 Jul 2025
Form 1File: Form 1 aug 2023.pdf1 Jul 2025
Form 2File: 2604_FORM_2_ENGG_Certificate_24082023.pdf1 Jul 2025
Form 3File: Final Form 3 Shakti 14082023 signed.pdf1 Jul 2025
Form 1File: AG Form 1 Architect Certificate 19_10_2023_Signed.pdf1 Jul 2025
Form 2File: 2604_FORM 2_ENGG Certificate 15102023.pdf1 Jul 2025
Form 3File: FORM 3 SHAKTI 15102023-DSC Signed.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD AND UNSOLD 30092023.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold and Unsold Inventory 31122023.pdf1 Jul 2025
Form 1File: AG Form 1 Architect Certificate 12_01_2024_dsc signed.pdf1 Jul 2025
Form 2File: 2604_FORM 2_ENGG Certificate_DEC'23__31_12_23.pdf1 Jul 2025
Form 3File: Signed form 3 31_12_23.pdf1 Jul 2025
Form 1File: AG - Form 1 Architect Certificate 18042024.pdf1 Jul 2025
Form 2File: 2604_FORM 2_ENGG Certificate_MARCH'24__dsc.pdf1 Jul 2025
Form 3File: Form 3 31_03_2024_DSC.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold AND Unsold inventory 31032024.pdf1 Jul 2025
Form 1File: Annexure A_form 1.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD dsc.pdf1 Jul 2025
Form 2File: FORM 2_ENGG Certificate___dsc.pdf1 Jul 2025
Form 3File: Form 3 _DSC.pdf1 Jul 2025
Form 1File: AG - Form 1 Architect Certificate 19_10_24.pdf1 Jul 2025
Form 2File: 2604_FORM 2_ENGG Certificate_sept'24 21_10_24.pdf1 Jul 2025
Form 3File: SIGNED Sep 2024 Final FORM 3 CA Certificate.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold&unsold sep 30092024.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31032025.pdf1 Jul 2025
Form 1File: AG - Form 1 Architect Certificate 31032025.pdf1 Jul 2025
Form 2File: SIGNED FORM 2_ENGG Certificate__March 25.pdf1 Jul 2025
Form 3File: Signed March 2025_FORM 3 Shakti Trombay.pdf1 Jul 2025
Form 1File: AG - Form 1 Architect Certificate 31_12_2024 SIGN DSC.pdf1 Jul 2025
Form 2File: FORM 2_ENGG Certificate__Dec 24.pdf1 Jul 2025
Form 3File: Dec 2024 FORM 3 SHAKTI TROMBAY_dsc.pdf1 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 31032025.pdf1 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A_0001 24-25.pdf16 Jun 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD (2).pdf22 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGG Certificate__Dec 24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED Sep 2024 Final FORM 3 CA Certificate.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AG - Form 1 Architect Certificate 19_10_24.pdf21 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2604_FORM 2_ENGG Certificate_sept'24 21_10_24.pdf21 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Annual Report as on 31st March 2024 FORM 5.pdf21 Oct 2024
Disclosure of sold/ booked inventoryFile: Adobe Scan 16 Oct 2024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A 23-24.pdf18 Oct 2024
Layout approvalFile: Drawing (14).pdf2 Aug 2024
Building plan approvalFile: 2413575Amendletter_signed.pdf2 Aug 2024
Copy of Layout Approval (in case of layout)File: Drawing (14).pdf2 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: 2413575Amendletter_signed.pdf2 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: 2416131_FurtherCC_signed (1).pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A_form 1.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD dsc.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31_03_2024_DSC.pdf22 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AG - Form 1 Architect Certificate 18042024.pdf18 Apr 2024
Disclosure of sold/ booked inventoryFile: sold AND Unsold inventory 31032024.pdf18 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2604_FORM 2_ENGG Certificate_DEC'23__22022024.pdf23 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3-1.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory 31122023.pdf17 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2604_FORM 2_ENGG Certificate 15102023.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SHAKTI 15102023-DSC Signed.pdf9 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: 2398569_FurtherCC_signed (1).pdf22 Oct 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE Signed.pdf22 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD AND UNSOLD 30092023.pdf19 Oct 2023
Layout approvalFile: Drawing (11).pdf13 Oct 2023
Building plan approvalFile: 2393464Amendletter_signed.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing (11).pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 2393464Amendletter_signed.pdf13 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Annual Report.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 aug 2023.pdf30 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2604_FORM_2_ENGG_Certificate_24082023.pdf30 Aug 2023

How this compares with Mumbai Suburban

37%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAKTI TROMBAY 88 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near TROMBAY6,700+ in Mumbai Suburban

Builder: VASHU RAHEJA SONS REALTY LLP

VASHU RAHEJA SONS REALTY LLP has 1 registration on MahaRERA, including SHAKTI TROMBAY 88. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if SHAKTI TROMBAY 88 is delayed beyond 29 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAKTI TROMBAY 88?

The registered promoter entity is VASHU RAHEJA SONS REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAKTI TROMBAY 88?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAKTI TROMBAY 88?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAKTI TROMBAY 88?

The professionals named in the filing: Architect: B H WADHWA AND CHHADVA ASSOCIATES; Architect: TEJAS ARUN CHHADVA; Engineer: Associated Structural Engineers LLP; Engineer: VIJAY T NARANG; Chartered Accountant: M/s. TDK & Co.; Chartered Accountant: V Mangal And Company. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAKTI TROMBAY 88?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAKTI TROMBAY 88. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAKTI TROMBAY 88 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.