SHAILAJA GPS BUSINESS CENTER
By KPG BUILDERS AND DEVELOPERS
RG-MH-18166 · RERA P51700056487 · Last updated on MahaRERA portal: 20 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 13 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHAILAJA GPS BUSINESS CENTER is a Commercial project by KPG BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700056487 on 5 Jun 2024. Possession is promised by 31 Mar 2027.
At a glance
Project
- NameSHAILAJA GPS BUSINESS CENTER
- TypeCommercial
- Location
- STATION ROAD
- KOHOJ KHUNTAWALI
- Ambarnath (R)
- Ambarnath
- Thane
- 421501
- Pincode421501
- RERA no.P51700056487
- ReraGenie IDRG-MH-18166
Builder
- NameKPG BUILDERS AND DEVELOPERS
- Entity typePartnership
- PartnersGYANDHAR PREMSHANKAR MISHRA, PRAMODKUMAR RAMPATI CHAUBEY, NARENDRA MURLIDHAR KALE, BALAJI PRALHAD KINIKAR
- Declared earlier projects13 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Jun 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed60 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHAILAJA GPS BUSINESS CENTER | NA | 9 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
SHAILAJA GPS BUSINESS CENTER: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed46
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SHOBHA P SHETTY AND JYOTI S KULKARNI | Ambarnath (R) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MAHESH JAGTAP AND ASSOCIATES |
| Engineer | KSK CONSORTIUM |
| Chartered Accountant | CA AJITHA THAMPAN |
| Chartered Accountant | Devendra Jain |
| Partner | Role in project |
|---|---|
| KPG BUILDERS AND DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 17 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Mar 2027
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: KPG builders and developers 4.pdf | 20 Apr 2026 |
| Form 2File: KPG builders and developers.pdf | 20 Apr 2026 |
| Form 3File: KPG.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Shailaja Gps business centre.pdf | 20 Apr 2026 |
| Form 1File: Form 1_Shailaja.pdf | 19 Jan 2026 |
| Form 2File: Form 2_Shailaja gps.pdf | 19 Jan 2026 |
| Form 3File: Form 3 _Shailaja.pdf | 19 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: disclosure shailaja Gps business centre.pdf | 19 Jan 2026 |
| Form 1File: shailaja gps business center form 1.pdf | 19 Oct 2025 |
| Form 2File: shailaja gps business center from 2.pdf | 19 Oct 2025 |
| Form 3File: shailaja gps business center form 3.pdf | 19 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: disclosure shailaja gps business center.pdf | 19 Oct 2025 |
| Form 2A (FY 2024-2025)File: Shailaja 2A.pdf | 25 Sep 2025 |
| Form 5 (FY 2024-2025)File: form 5 shailaja gps business center.pdf | 25 Sep 2025 |
| Form 1File: shailaja gps business center form 1.pdf | 19 Jul 2025 |
| Form 2File: shailaja gps business center form 2.pdf | 19 Jul 2025 |
| Form 3File: form 3 shailaja GPS business center.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: shailaja gps business disclosure.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shailaja GPS business center form 1.pdf | 9 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shailaja GPS business center3.pdf | 9 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shailaja gps business center form 2.pdf | 9 May 2025 |
| Disclosure of sold/ booked inventoryFile: shailaja GPS business center disclosure.pdf | 9 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 _ shailaja gps business center.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 _ shailaja gps business center.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 _ shailaja gps business center.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: disclosure _ shailaja gps business center.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure 1shailaja gps business center.pdf | 23 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shailaja gps business center_ form 3.pdf | 23 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shailaja.pdf | 23 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold books inventory shailaja gps business center30-09-2024.pdf | 23 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shailaja gps business centar form 1.pdf | 13 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shailaja GPS Business Center form 2.pdf | 13 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of shailaja gps business centar.pdf | 13 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shailaja gps business centar form 3_compressed.pdf | 13 Aug 2024 |
| Other - TechnicalFile: kpg annexure A (1).pdf | 31 May 2024 |
| Other - TechnicalFile: Declaration.pdf | 28 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3.pdf | 13 May 2024 |
| Proforma of Agreement for saleFile: As per RERA_Format_Agreement for sale_upload.pdf | 13 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank ac.pdf | 13 May 2024 |
| Other - LegalFile: Property Card Plot no 22.pdf | 13 May 2024 |
| Other - LegalFile: kpg partnership deed_compressed.pdf | 13 May 2024 |
| Details of encumbrances concerned to FinanceFile: ilovepdf_merged (2).pdf | 30 Apr 2024 |
| Details of encumbrances concerned to LegalFile: ilovepdf_merged (2).pdf | 30 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: Dev.pdf | 30 Apr 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200304469208_For_Asset_Based.pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure pkc.pdf | 25 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure gdm.pdf | 25 Apr 2024 |
| Proforma of Allotment letterFile: Format_Provisional Allotment.pdf | 25 Apr 2024 |
| Deviation Report with respect to Allotment letterFile: deviation.pdf | 25 Apr 2024 |
| Copy of the legal title reportFile: TITTLE DEED_compressed.pdf | 20 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure N kale.pdf | 20 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Balaji kinikar.pdf | 20 Apr 2024 |
| Layout approvalFile: PLOT NO 22 MUNICIPAL PLAN (1).pdf | 17 Apr 2024 |
| Building plan approvalFile: PLOT NO 22 MUNICIPAL PLAN (1).pdf | 17 Apr 2024 |
| PAN CardFile: KPG PAN CARD.pdf | 17 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: PLOT NO 22 MUNICIPAL PLAN (1).pdf | 17 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: PLOT NO 22 MUNICIPAL PLAN (1).pdf | 17 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Shailaja KPG commencement certificate.pdf | 17 Apr 2024 |
| Declaration about Commencement CertificateFile: Format -D(2).pdf | 17 Apr 2024 |
| Declaration in FORM BFile: Builder From B.pdf | 17 Apr 2024 |
Promoter's earlier projects13
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| KAILASH PARVAT CHS LTD | CTS No 4384-4385 Plot No 5 & 6 situated at Village Ambernath Bhidewadi Kansai Section Ambernath East | 95 | Completed | Dec 2024 | Mar 2024 |
| SHIV SAI KRUPA CHS LTD | CTS No 8719 Survey No33 Hissa No 5 Part B Cabin Road Ambernath East Dist Thane Maharashtra 421501 | 45 | Completed | Jun 2024 | Mar 2023 |
| SHIV SAI ARNAV | plot no 272 cts no 4342 three tyre chowk ambernath East 421501 | 35 | Completed | Jun 2024 | Mar 2023 |
| ASHIRWAD RESIDENCY CHS LTD | plot no 393 cts no 4657 Ambernath East 421501 | 24 | Completed | Dec 2023 | Jan 2023 |
| SHREE SAI PANACHE | SURVEY NO 142 HISSA NO 5 CHIKHLOLI K B ROAD AMBERNATH WEST THANE DIST | 29 | Completed | Jun 2020 | May 2019 |
| ANITA C H S LTD | PLOT NO 7 C T S NO 9000 NELYOG NAGAR B CABIN ROAD AMBERNATH EAST THANE DIST MAHARASHTRA | 37 | Completed | May 2020 | May 2019 |
| HERAMB KRUPA C H S LTD | C T S NO 4397 BHIDEWADI KANSAI SECTION VILLAGE AMBERNATH THANE DIST MAHARASHTRA | 34 | Completed | Feb 2020 | May 2019 |
| NILOY C H S | C T S NO 4378 SURVEY NO 82 PART VILLAGE KANSI AMBERNATH EAST THANE DIST MAHARASHTRA 421 501 | 78 | Completed | Dec 2019 | Sep 2018 |
| BRITTO HOUSE | PLOT NO 5 SURVEY NO 166 CTS NO 2269-2274 KHOJ KHUNTAVLI KHOJGAON AMBERNATH WEST THANE DIST MAHARASHTRA | 26 | Completed | Dec 2018 | Jan 2018 |
| SHREE SAI LEELA | SURVEY NO 86 HISSA NO 3 BARKUPADA AMBERNATH EAST THANE DIST | 12 | Completed | Jun 2018 | Jan 2018 |
| KANAK C H S LTD | NEELYOG NAGAR B CABIN ROAD VADAVLI AMBERNATH EAST THANE DIST | 1 | Completed | Jul 2016 | Jul 2016 |
| BHUSARE CHS LTD | KHOJ KUNTAVLI AMBARNATH WEST THANE DIST | 26 | Completed | Jun 2015 | Mar 2015 |
| SAI KRUPA ARCADE | KHOJ KUNTAVLI AMBERNATH WEST THANE DIST | 31 | Completed | Jun 2015 | Apr 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 60 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHAILAJA GPS BUSINESS CENTER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KOHOJ KHUNTAWALI7,600+ in Thane
CHADHA RESIDENCY
CHADHA DEVELOPERS AND PROMOTERS
KRUSHNA VIHAR - PHASE I
KRUSHAN DHAM BUILDERS & DEVELOPERS
VISHWAJEET MYSPACE
GULABRAO BABURAO KARANJULE PATIL
KHATRI SPARSH
KHATRI REALTY
Tulsi Galaxy
Manas Associates
WALEKAR HOMES
WALEKAR & SON'S DEVELOPERS
See every Thane project, with the district possession charts
Builder: KPG BUILDERS AND DEVELOPERS
KPG BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SHAILAJA GPS BUSINESS CENTER. Its filings disclose 13 earlier MahaRERA projects: declares 13 of 13 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SHAILAJA GPS BUSINESS CENTER is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHAILAJA GPS BUSINESS CENTER?
The registered promoter entity is KPG BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHAILAJA GPS BUSINESS CENTER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHAILAJA GPS BUSINESS CENTER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHAILAJA GPS BUSINESS CENTER?
The professionals named in the filing: Architect: MAHESH JAGTAP AND ASSOCIATES; Engineer: KSK CONSORTIUM; Chartered Accountant: CA AJITHA THAMPAN; Chartered Accountant: Devendra Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHAILAJA GPS BUSINESS CENTER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback