SHAILAJA GPS BUSINESS CENTER

By KPG BUILDERS AND DEVELOPERS

RG-MH-18166 · RERA P51700056487 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 13 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

SHAILAJA GPS BUSINESS CENTER is a Commercial project by KPG BUILDERS AND DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700056487 on 5 Jun 2024. Possession is promised by 31 Mar 2027.

At a glance

Project

  • NameSHAILAJA GPS BUSINESS CENTER
  • TypeCommercial
  • Location
    • STATION ROAD
    • KOHOJ KHUNTAWALI
    • Ambarnath (R)
    • Ambarnath
    • Thane
    • 421501
  • Pincode421501
  • RERA no.P51700056487
  • ReraGenie IDRG-MH-18166

Builder

  • NameKPG BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersGYANDHAR PREMSHANKAR MISHRA, PRAMODKUMAR RAMPATI CHAUBEY, NARENDRA MURLIDHAR KALE, BALAJI PRALHAD KINIKAR
  • Declared earlier projects13 →

Key dates

this monthRegisteredJun 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on5 Jun 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHAILAJA GPS BUSINESS CENTERNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

SHAILAJA GPS BUSINESS CENTER: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered8
Open Space38

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area538 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
SHOBHA P SHETTY AND JYOTI S KULKARNIAmbarnath (R)Thane

Approvals and building plan

Permissible FSI1616.86
Proposed, not sanctioned1,617 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANVELKAR PLAZA, STATION ROAD, AMBERNATH EAST, THANE, MAHARASHTRA PIN 421501

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMAHESH JAGTAP AND ASSOCIATES
EngineerKSK CONSORTIUM
Chartered AccountantCA AJITHA THAMPAN
Chartered AccountantDevendra Jain
PartnerRole in project
KPG BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: KPG builders and developers 4.pdf20 Apr 2026
Form 2File: KPG builders and developers.pdf20 Apr 2026
Form 3File: KPG.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: Shailaja Gps business centre.pdf20 Apr 2026
Form 1File: Form 1_Shailaja.pdf19 Jan 2026
Form 2File: Form 2_Shailaja gps.pdf19 Jan 2026
Form 3File: Form 3 _Shailaja.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: disclosure shailaja Gps business centre.pdf19 Jan 2026
Form 1File: shailaja gps business center form 1.pdf19 Oct 2025
Form 2File: shailaja gps business center from 2.pdf19 Oct 2025
Form 3File: shailaja gps business center form 3.pdf19 Oct 2025
Disclosure of Sold and Booked InventoryFile: disclosure shailaja gps business center.pdf19 Oct 2025
Form 2A (FY 2024-2025)File: Shailaja 2A.pdf25 Sep 2025
Form 5 (FY 2024-2025)File: form 5 shailaja gps business center.pdf25 Sep 2025
Form 1File: shailaja gps business center form 1.pdf19 Jul 2025
Form 2File: shailaja gps business center form 2.pdf19 Jul 2025
Form 3File: form 3 shailaja GPS business center.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: shailaja gps business disclosure.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shailaja GPS business center form 1.pdf9 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shailaja GPS business center3.pdf9 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shailaja gps business center form 2.pdf9 May 2025
Disclosure of sold/ booked inventoryFile: shailaja GPS business center disclosure.pdf9 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 _ shailaja gps business center.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 _ shailaja gps business center.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 _ shailaja gps business center.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: disclosure _ shailaja gps business center.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure 1shailaja gps business center.pdf23 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shailaja gps business center_ form 3.pdf23 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shailaja.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold books inventory shailaja gps business center30-09-2024.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shailaja gps business centar form 1.pdf13 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Shailaja GPS Business Center form 2.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of shailaja gps business centar.pdf13 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: shailaja gps business centar form 3_compressed.pdf13 Aug 2024
Other - TechnicalFile: kpg annexure A (1).pdf31 May 2024
Other - TechnicalFile: Declaration.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final form 3.pdf13 May 2024
Proforma of Agreement for saleFile: As per RERA_Format_Agreement for sale_upload.pdf13 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate bank ac.pdf13 May 2024
Other - LegalFile: Property Card Plot no 22.pdf13 May 2024
Other - LegalFile: kpg partnership deed_compressed.pdf13 May 2024
Details of encumbrances concerned to FinanceFile: ilovepdf_merged (2).pdf30 Apr 2024
Details of encumbrances concerned to LegalFile: ilovepdf_merged (2).pdf30 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Dev.pdf30 Apr 2024
CERSAI detailsFile: CERSAI_Search_Report_200304469208_For_Asset_Based.pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure pkc.pdf25 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure gdm.pdf25 Apr 2024
Proforma of Allotment letterFile: Format_Provisional Allotment.pdf25 Apr 2024
Deviation Report with respect to Allotment letterFile: deviation.pdf25 Apr 2024
Copy of the legal title reportFile: TITTLE DEED_compressed.pdf20 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure N kale.pdf20 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Balaji kinikar.pdf20 Apr 2024
Layout approvalFile: PLOT NO 22 MUNICIPAL PLAN (1).pdf17 Apr 2024
Building plan approvalFile: PLOT NO 22 MUNICIPAL PLAN (1).pdf17 Apr 2024
PAN CardFile: KPG PAN CARD.pdf17 Apr 2024
Copy of Layout Approval (in case of layout)File: PLOT NO 22 MUNICIPAL PLAN (1).pdf17 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: PLOT NO 22 MUNICIPAL PLAN (1).pdf17 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: Shailaja KPG commencement certificate.pdf17 Apr 2024
Declaration about Commencement CertificateFile: Format -D(2).pdf17 Apr 2024
Declaration in FORM BFile: Builder From B.pdf17 Apr 2024

Promoter's earlier projects13

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

13 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
KAILASH PARVAT CHS LTDCTS No 4384-4385 Plot No 5 & 6 situated at Village Ambernath Bhidewadi Kansai Section Ambernath East95CompletedDec 2024Mar 2024
SHIV SAI KRUPA CHS LTDCTS No 8719 Survey No33 Hissa No 5 Part B Cabin Road Ambernath East Dist Thane Maharashtra 42150145CompletedJun 2024Mar 2023
SHIV SAI ARNAVplot no 272 cts no 4342 three tyre chowk ambernath East 42150135CompletedJun 2024Mar 2023
ASHIRWAD RESIDENCY CHS LTDplot no 393 cts no 4657 Ambernath East 42150124CompletedDec 2023Jan 2023
SHREE SAI PANACHESURVEY NO 142 HISSA NO 5 CHIKHLOLI K B ROAD AMBERNATH WEST THANE DIST29CompletedJun 2020May 2019
ANITA C H S LTDPLOT NO 7 C T S NO 9000 NELYOG NAGAR B CABIN ROAD AMBERNATH EAST THANE DIST MAHARASHTRA37CompletedMay 2020May 2019
HERAMB KRUPA C H S LTDC T S NO 4397 BHIDEWADI KANSAI SECTION VILLAGE AMBERNATH THANE DIST MAHARASHTRA34CompletedFeb 2020May 2019
NILOY C H SC T S NO 4378 SURVEY NO 82 PART VILLAGE KANSI AMBERNATH EAST THANE DIST MAHARASHTRA 421 50178CompletedDec 2019Sep 2018
BRITTO HOUSEPLOT NO 5 SURVEY NO 166 CTS NO 2269-2274 KHOJ KHUNTAVLI KHOJGAON AMBERNATH WEST THANE DIST MAHARASHTRA26CompletedDec 2018Jan 2018
SHREE SAI LEELASURVEY NO 86 HISSA NO 3 BARKUPADA AMBERNATH EAST THANE DIST12CompletedJun 2018Jan 2018
KANAK C H S LTDNEELYOG NAGAR B CABIN ROAD VADAVLI AMBERNATH EAST THANE DIST1CompletedJul 2016Jul 2016
BHUSARE CHS LTDKHOJ KUNTAVLI AMBARNATH WEST THANE DIST26CompletedJun 2015Mar 2015
SAI KRUPA ARCADEKHOJ KUNTAVLI AMBERNATH WEST THANE DIST31CompletedJun 2015Apr 2015

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SHAILAJA GPS BUSINESS CENTER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOHOJ KHUNTAWALI7,600+ in Thane

Builder: KPG BUILDERS AND DEVELOPERS

KPG BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including SHAILAJA GPS BUSINESS CENTER. Its filings disclose 13 earlier MahaRERA projects: declares 13 of 13 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SHAILAJA GPS BUSINESS CENTER is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHAILAJA GPS BUSINESS CENTER?

The registered promoter entity is KPG BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHAILAJA GPS BUSINESS CENTER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHAILAJA GPS BUSINESS CENTER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHAILAJA GPS BUSINESS CENTER?

The professionals named in the filing: Architect: MAHESH JAGTAP AND ASSOCIATES; Engineer: KSK CONSORTIUM; Chartered Accountant: CA AJITHA THAMPAN; Chartered Accountant: Devendra Jain. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHAILAJA GPS BUSINESS CENTER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHAILAJA GPS BUSINESS CENTER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHAILAJA GPS BUSINESS CENTER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.