ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SEVENTH AVENUE

Registered No litigation declared Residential / Group Housing project

SEVENTH AVENUE

By PAWAR GROUP

RG-MH-07365 · RERA P51700055291 · Last updated on MahaRERA portal: 6 Feb 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
0 of 33Construction stages doneacross 3 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

SEVENTH AVENUE is a Residential / Group Housing project by PAWAR GROUP in Thane, Maharashtra, registered with MahaRERA as P51700055291 on 14 Mar 2024. Possession is promised by 31 Dec 2031.

At a glance

Project

  • NameSEVENTH AVENUE
  • TypeResidential / Group Housing
  • Location
    • Badlpaur
    • Sonivali
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • RERA no.P51700055291
  • ReraGenie IDRG-MH-07365

Builder

  • NamePAWAR GROUP
  • Entity typePartnership
  • PartnersDAYANAND GANESH PAWAR, GANESH BALARAM PAWAR, SANJAY BALARAM PAWAR, VIDYA GANESH PAWAR
  • Other registrations3 more →
  • Completed1 of 4
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2024PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings3 building records
  • Documents filed66 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA80000
BUILDING 2NA80000
BUILDING 3NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 6 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.

BUILDING NO 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING 30%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 6 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed328

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots328
Closed/Covered85
Open Space243
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 132243275
BUILDING 231031
BUILDING 322022

Land and ownership9

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,350 sq m
Land owned byThe promoter, with other names on the file
Named landowners9
LandownerVillageDistrict
PAWAR GROUPBadlapur (M Cl)Thane
NILAM RAMESH SONAVANEBadlapur (M Cl)Thane
SUSHAMA ANIL JADHAVBadlapur (M Cl)Thane
AVINASH RAMESH SONAWANEBadlapur (M Cl)Thane
SANDHYA JEEVAN GAIKWADBadlapur (M Cl)Thane
NIDHI NILESH SONAWANEBadlapur (M Cl)Thane
AMOL RAMESH SONAWANEBadlapur (M Cl)Thane
SAVITA RAMESH SONAVANEBadlapur (M Cl)Thane
PANDURANG MAHADU SONAWANEBadlapur (M Cl)Thane

Approvals and building plan

Permissible FSI10323.66
Proposed, not sanctioned10,324 sq m
Buildings approved7
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBADLAPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectISOTECT ENFGINEERING AND CONSULTANT
EngineerATUL KUDTARKAR AND ASSOCIATES PVT LTD
Chartered AccountantCA AMRRITA JAGNAANI
PartnerRole in project
PAWAR GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1.pdf6 Feb 2026
Form 2File: FORM 2.pdf6 Feb 2026
Form 3File: FORM 3.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf6 Feb 2026
Form 1File: FORM 1.pdf6 Feb 2026
Form 2File: FORM 2.pdf6 Feb 2026
Form 3File: FORM 3.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf6 Feb 2026
Form 1File: architech certificate MARCH 2024.pdf17 Sep 2025
Form 2File: Jan to March 2024.pdf17 Sep 2025
Form 3File: CA CERTIFICATE March 2024.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: MARCH 2024 SOLD UNSOLD.pdf17 Sep 2025
Form 1File: architech certificate April to june 2024.pdf16 Sep 2025
Form 2File: Engineer certificate april to June 2024.pdf16 Sep 2025
Form 3File: CA CERTIFICATE june 2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold JUNE 2024.pdf16 Sep 2025
Form 1File: architech certificateSept 2024.pdf16 Sep 2025
Form 2File: Engineer certificate July to sept 2024.pdf16 Sep 2025
Form 3File: CA CERTIFICATE Sept 2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold SEPT 2024.pdf16 Sep 2025
Form 1File: architech certificateDEC 2024.pdf16 Sep 2025
Form 2File: Engineer certificate oct to dec 2024.pdf16 Sep 2025
Form 3File: CA CERTIFICATE DEC 2024.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Dec 2024.pdf16 Sep 2025
Form 1File: architech certificateMARCH 2025.pdf16 Sep 2025
Form 2File: Engineer certificate jan to march 2025.pdf16 Sep 2025
Form 3File: CA CERTIFICATE MARCH 2025.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold March 2025.pdf16 Sep 2025
Form 1File: architech certificate June 2025.pdf16 Sep 2025
Form 2File: Engineer certificate april to june 2025.pdf16 Sep 2025
Form 3File: CA CERTIFICATE JUNE 2025.pdf16 Sep 2025
Disclosure of Sold and Booked InventoryFile: sold unsold JUNE.pdf16 Sep 2025
Details of encumbrances concerned to FinanceFile: LEGAL ENCUMBRANCE.pdf28 Feb 2025
Details of encumbrances concerned to LegalFile: LEGAL ENCUMBRANCE.pdf28 Feb 2025
Details of encumbrances concerned to FinanceFile: PDF Scanner 160424.pdf24 Jun 2024
Details of encumbrances concerned to LegalFile: PDF Scanner 160424.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA letter 1.pdf6 Mar 2024
Other - TechnicalFile: Annexure A pawar group.pdf6 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: pawar group annexure A.pdf28 Feb 2024
Proforma of Allotment letterFile: RERA DRAFT.pdf21 Feb 2024
Copy of the legal title reportFile: Legal Title Report.pdf7 Feb 2024
Copy of the legal title reportFile: Legal Format A.pdf7 Feb 2024
Deviation Report with respect to Allotment letterFile: Allotment letter (1).pdf7 Feb 2024
Details of encumbrances concerned to FinanceFile: legal encumbrance .pdf27 Jan 2024
Details of encumbrances concerned to LegalFile: legal encumbrance .pdf27 Jan 2024
Declaration about Commencement CertificateFile: declaration about commencement certificate 1.pdf27 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: declaration about seperate Bank account .pdf27 Jan 2024
Other - LegalFile: DEED.pdf27 Jan 2024
Layout approvalFile: 1 st plan.pdf9 Jan 2024
Building plan approvalFile: 1 st plan.pdf9 Jan 2024
Layout approvalFile: 3_compressed.pdf9 Jan 2024
Layout approvalFile: CC.pdf9 Jan 2024
PAN CardFile: Pan card.pdf9 Jan 2024
Details of encumbrances concerned to FinanceFile: declaration F.pdf9 Jan 2024
Details of encumbrances concerned to LegalFile: declaration F.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: CC.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: 1 st plan.pdf9 Jan 2024
Copy of Layout Approval (in case of layout)File: 3_compressed.pdf9 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 st plan.pdf9 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf9 Jan 2024
Declaration in FORM BFile: affidavit .pdf9 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CONSULTING ENGINEERS • STRUCTURAL DESIGNERS • PROJECT MANAGERS 2.pdf9 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200292973481_For_Asset_Based_Search_09_01_2024_13_02_40_873.pdf9 Jan 2024
CERSAI detailsFile: undertaking declaration .pdf9 Jan 2024
Proforma of Agreement for saleFile: Rera Draft.pdf9 Jan 2024
Deviation Report with respect to model copy of AgreementFile: declaration for sale and allotment letter.pdf9 Jan 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SEVENTH AVENUE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Sonivali7,600+ in Thane

Builder: PAWAR GROUP

PAWAR GROUP has 4 registrations on MahaRERA, including SHREE GANESH PARADISE and SHREE GANESH SYMPHONY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SEVENTH AVENUE is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SEVENTH AVENUE?

The registered promoter entity is PAWAR GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SEVENTH AVENUE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SEVENTH AVENUE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SEVENTH AVENUE?

The professionals named in the filing: Architect: ISOTECT ENFGINEERING AND CONSULTANT; Engineer: ATUL KUDTARKAR AND ASSOCIATES PVT LTD; Chartered Accountant: CA AMRRITA JAGNAANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEVENTH AVENUE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEVENTH AVENUE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEVENTH AVENUE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.