Home / Browse projects / Mumbai Suburban, Maharashtra / SERENO-B, Omkar International District
SERENO-B, Omkar International District
RG-MH-41467 · RERA P51800017695 · Last updated on MahaRERA portal: 19 Jul 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 19 months past the filed date
- 13 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SERENO-B, Omkar International District is a Residential / Group Housing project by Omkar Ventures Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800017695 on 4 Sep 2018. Possession was promised by 30 Mar 2025 and is now 19 months past that date. The completion date has moved by 12 months from the original filing. 13 complaints are on record with the regulator.
At a glance
Project
- NameSERENO-B, Omkar International District
- TypeResidential / Group Housing
- Location
- Off Western Express Highway
- Western Suburbs
- Andheri
- Mumbai Suburban
- 400060
- Pincode400060
- RERA no.P51800017695
- ReraGenie IDRG-MH-41467
Builder
- NameOmkar Ventures Pvt. Ltd.
- Entity typeCompany
- CINU70102MH2013PTC239568
- CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- DirectorKIRIT MEHTA
- Other registrations4 more →
- No longer live3 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on4 Sep 2018
- Promised completion30 Mar 2025
- Revised completionRevised to 30 Mar 2025 (originally 30 Mar 2024)
- Buildings3 building records
- Documents filed170 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SERENO-B3 | NA | 27 | 0 | 0 | 0 | 0 |
| SERENO-B4 | NA | 27 | 0 | 0 | 0 | 0 |
| SERENO-B5 | NA | 27 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 19 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Excavation, at 0%.
SERENO-B30%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SERENO-B40%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
SERENO-B50%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 19 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed319
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SERENO-B3 | 105 | 105 |
| SERENO-B4 | 107 | 107 |
| SERENO-B5 | 107 | 107 |
Land and ownership4
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| OMKAR REALTORS ANDHERI PROJECTS PVT LTD. | Bhosari | Mumbai City |
| VIMAL ASSOCIATES | Bhosari | Mumbai City |
| GOLDEN AGE INFRASTRUCTURE | Bhosari | Mumbai City |
| NIRMAN REALTORS PRIVATE LIMITED | Bhosari | Mumbai City |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANAND V DHOKAY |
| Engineer | PRASAD SHETTY |
| Chartered Accountant | N SOMAANI & CO |
| Chartered Accountant | G Y & CO |
| Chartered Accountant | NEELESH JAIN & ASSOCIATES |
| Chartered Accountant | CHETAN S TAK & COMPANY |
| Chartered Accountant | SSMG & ASSOCIATES LLP |
| Partner | Role in project |
|---|---|
| Omkar Ventures Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe reasons for seeking extension which were beyond the control of Promoter are briefly set out hereunder: 1. Discontinuation of Subvention Scheme 2. Economic downturn and Demonetization: 3. Promoters Account became NPA: 4. Force majeure (COVID 19 Pandemic):
Litigation declared28
| Case | Court | Status |
|---|---|---|
| 352/2013 | HIGH COURT | Matter adjourned as per High Court CIMS There is no adverse order |
| 1109/2017 | CITY CIVIL COURT DINDOSHI | Matter adjourned as per City Civil Court Dindoshi Cause List There is no adverse order |
| 2557/2017 | CITY CIVIL COURT DINDOSHI | Matter adjourned as per City Civil Court Dindoshi Cause List There is no adverse order |
| 339/2017 | CITY CIVIL COURT DINDOSHI | Matter adjourned as per City Civil Court Dindoshi Cause List There is no adverse order |
| 200605/2018 | CITY CIVIL COURT DINDOSHI | Matter adjourned as per City Civil Court Dindoshi Cause List There is no adverse order |
| 262/2016 | Small Causes Court | Matter adjourned as per Small Causes Court Dindoshi Cause List There is no adverse order |
| AT0060000000010365/2018 | Maharashtra Real Estate Regulatory Authority | Matter adjourned as per Rera Cause List There is no adverse order |
| 79/2017 | APEX GRIEVANCE REDRESSAL COMMITTEE | Matter adjourned as per AGRC Cause List There is no adverse order |
| 414/2017 | High court of Bombay | For Hearing |
| 38/2015 | High court of Bombay | For Hearing |
| 1221/2018 | High court of Bombay | For Hearing |
| 120/2017 | High court of Bombay | For Hearing |
| 2096/2018 | City Civil court Dindoshi | For Hearing |
| 2097/2018 | City Civil court Dindoshi | For Hearing |
| 2098/2018 | City Civil court Dindoshi | For Hearing |
| 2099/2018 | City Civil court Dindoshi | For Hearing |
| 2117/2018 | City Civil court Dindoshi | For Hearing |
| 1919/2018 | City Civil court Dindoshi | For Hearing |
| 1918/2018 | City Civil court Dindoshi | For Hearing |
| 2828/2018 | Bhoiwada Dadar Mumbai | For hearing |
| 2829/2018 | Bhoiwada Dadar Mumbai | For hearing |
| 2827/2018 | Bhoiwada Dadar Mumbai | For hearing |
| 2956/2018 | Bhoiwada Dadar Mumbai | For hearing |
| 2957/2018 | Bhoiwada Dadar Mumbai | For hearing |
| 3225/2018 | Bhoiwada Dadar Mumbai | For hearing |
| 0700034/2019 | Bhoiwada Dadar Mumbai | For hearing |
| 251/SS/2019 | Bhoiwada Dadar Mumbai | For hearing |
| 3521/2019 | National Company Law Tribunal Mumbai Bench Mumbai | For hearing |
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000197926 | Smita Agarwal | Omkar Ventures Private Limited | 09/08/2021 |
| CC006000000194860 | MR. VIJAY PHALKE | M/s Omkar Ventures Pvt. Ltd. | 17/12/2020 |
| CC006000000198100 | Deepak Vishnu Motwani | Omkar Ventures Private Limited | 25/08/2021 |
| CC006000000375305 | Mr.Anthony Quadras And Mrs.Albina Quadras | Omkar Ventures Private Limited | 19/04/2023 |
| CC006000000397118 | MANISH PURUSHOTTAM CHIRAWAWALA | Omkar Ventures Pvt Ltd | 18/08/2023 |
| CC006000000397636 | ARUN MARUTI SHELAR | OMKAR VENTURES PRIVATE LIMITED | 06/10/2023 |
| CC006000000397717 | VIMAL VIRJI GAJRA | M/S OMKAR VENTURES PVT. LTD. | 04/10/2023 |
| CC006000000429231 | Sunita Amit Govilkar | Manomay Ventures Private Ltd | 14/02/2024 |
| CC006000000480094 | Saba Kazi | M/s Omkar Ventures Pvt.Ltd | 16/04/2024 |
| CC006000000570831 | Smita Sunderlal Agarwal | Manomay Ventures Private Limited | 25/06/2024 |
| CC006000000580933 | Anil Dinkar Bhoge | M/s. Omkar Ventures Pvt Ltd | 27/06/2024 |
| CC12500451 | Bhushan Bhiwa Thakur | Omkar Ventures Pvt. Ltd. | 11/02/2025 |
| CC12503000 | Yogesh Agarwal | Aspect Buildcon LLP | 25/08/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 23 Dec 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 May 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed170
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 170 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Declaration about Commencement CertificateFile: Declaration for CC (Sereno B)Format D Dated 19072024.pdf | 19 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: March 19B.pdf | 18 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: March 20B.pdf | 18 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: March 21 b.pdf | 18 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: March 23 b.pdf | 18 Jul 2024 |
| Certificates of CA (Form 3)File: Form-3(2018-19)- Sereno-B.pdf | 17 Jul 2024 |
| Certificates of CA (Form 3)File: Form-3(2019-20)- Sereno-B_compressed (1).pdf | 17 Jul 2024 |
| Certificates of CA (Form 3)File: Form-3(2019-20)- Sereno-B(q4)_compressed (1).pdf | 17 Jul 2024 |
| Certificates of CA (Form 3)File: Form-3(2021-22)- Sereno-B_compressed (1).pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5)File: Form-5(2018-19) Sereno-B.pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5)File: Form-5(2019-20) Sereno-B.pdf | 17 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5)File: Form-5(2020-21) Sereno-B.pdf | 17 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- Annexure -1(Q1)30062024(Sereno-B).pdf | 15 Jul 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2- Sereno-B-(Q1)-30062024.pdf | 15 Jul 2024 |
| Certificates of CA (Form 3)File: Sereno_B.pdf | 12 Jul 2024 |
| Layout approvalFile: Sale building no highlited.pdf | 11 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: Sale building no highlited.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sereno - B Architect certificate 2018-19.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sereno - B Architect certificate 2019-20.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sereno - B Architect certificate 2020-21.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sereno - B Architect certificate 2021-22.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sereno - B Architect certificate 2022-23.pdf | 11 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sereno - B Architect certificate 2023-24.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- Sereno B (Wing N).pdf | 5 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- Sereno B (Wing O).pdf | 5 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- Sereno B (Wing P).pdf | 5 Jul 2024 |
| Building plan approvalFile: Sale building no highlited.pdf | 3 Jun 2024 |
| Building plan approvalFile: Wng O-min.pdf | 3 Jun 2024 |
| Building plan approvalFile: Wing P-min (1).pdf | 3 Jun 2024 |
| Building plan approvalFile: Wing N-min.pdf | 3 Jun 2024 |
| Building Plan Approval (IOD)File: Sale building no highlited.pdf | 3 Jun 2024 |
| Building Plan Approval (IOD)File: Wng O-min.pdf | 3 Jun 2024 |
| Building Plan Approval (IOD)File: Wing P-min (1).pdf | 3 Jun 2024 |
| Building Plan Approval (IOD)File: Wing N-min.pdf | 3 Jun 2024 |
| Certificates of CA (Form 3)File: Phase V -2018-19 -Q-II.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Phase V -2019-20 -Q-II.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Phase V -2020-21 -Q-II.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Phase V -2020-21 -Q-III.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Phase V -2020-21 -Q-IV.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Phase V -2020-21 -Q-I_compressed.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Phase V-2021-22 - Q-IIIcompressed.pdf | 30 May 2024 |
| Certificates of CA (Form 3)File: Q4202223.pdf | 30 May 2024 |
| Proforma of Agreement for saleFile: afs.pdf | 24 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Majaswadi further (CC) Sale Bldg no- 1 dt- 10-06-2022.pdf | 23 May 2024 |
| Declaration in FORM BFile: Form B- Notarised Scan.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 4 Form 2A (1).pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 5 Form 2A (1).pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 6 Form 2A.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 7 Form 2A.pdf | 23 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- SERENO-B-(Wing-N).pdf | 23 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- SERENO-B(Wing-O).pdf | 23 May 2024 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY- SERENO-B(Wing-P).pdf | 23 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: fORM 5 mARCH 20.pdf | 23 May 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: fORM 5 mARCH 22.pdf | 23 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Srereno-B31032024.pdf | 22 May 2024 |
| Declaration about Commencement CertificateFile: Format D ( declaration About Commencement Certificate).pdf | 21 May 2024 |
| CERSAI detailsFile: Cersai Declaration.pdf | 21 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest.pdf | 21 May 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Kirit.pdf | 21 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Seperate Bank Ac disclosure.pdf | 21 May 2024 |
| Certificates of CA (Form 3)File: Sereno-B- Form-3 March -2024.pdf | 20 May 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032019.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062018.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122018.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062019.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092019.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032021.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062021.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092021.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032022.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062022.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092022.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31032023.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122022.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30062023.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 30092023.pdf | 23 Apr 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 31122023.pdf | 23 Apr 2024 |
| Form 2AFile: 31032019.pdf | 23 Apr 2024 |
| Form 2AFile: 31032020.pdf | 23 Apr 2024 |
| Form 2AFile: 31032021.pdf | 23 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 170 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep SERENO-B, Omkar International District on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Western Suburbs6,700+ in Mumbai Suburban
RATAN HERITAGE
NEXUS BUILDERS & DEVELOPERS
JP Parkway
Srushti Raj Developers LLP
Gyan Gold Crest
Gyan S. P. Developers LLP
PREM BUILDERS
PREM BUILDERS
Edenrose
Hillview Venture
AIM Garden
AIM Developers
See every Mumbai Suburban project, with the district possession charts
Builder: Omkar Ventures Pvt. Ltd.
Omkar Ventures Pvt. Ltd. has 5 registrations on MahaRERA, including Lawns And Beyond - Phase 2, Omkar International District and Lawns And Beyond - Phase 3, Omkar International District. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that SERENO-B, Omkar International District shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if SERENO-B, Omkar International District is delayed beyond 30 Mar 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SERENO-B, Omkar International District?
The registered promoter entity is Omkar Ventures Pvt. Ltd., a company as per the filing. Its CIN U70102MH2013PTC239568 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SERENO-B, Omkar International District?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against SERENO-B, Omkar International District?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for SERENO-B, Omkar International District?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SERENO-B, Omkar International District?
The professionals named in the filing: Architect: ANAND V DHOKAY; Engineer: PRASAD SHETTY; Chartered Accountant: N SOMAANI & CO; Chartered Accountant: G Y & CO; Chartered Accountant: NEELESH JAIN & ASSOCIATES; Chartered Accountant: CHETAN S TAK & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SERENO-B, Omkar International District?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback