ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SERENE MISTY

Registered No litigation declared Others project

SERENE MISTY

By VIDYASHREE DEVELOPERS UNIT-1 LLP

RG-MH-23578 · RERA P52100078890 · Last updated on MahaRERA portal: 24 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 11Construction stages donefurthest along: Slabs of Super Structure, 18%
22 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

SERENE MISTY is a Others project by VIDYASHREE DEVELOPERS UNIT-1 LLP in Pune, Maharashtra, registered with MahaRERA as P52100078890 on 20 Jan 2025. Possession is promised by 31 Dec 2028. 3 of the 25 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.

At a glance

Project

  • NameSERENE MISTY
  • TypeOthers
  • Location
    • -
    • WADGAON KH
    • Wadgaon Bk
    • Haveli
    • Pune
    • 411041
  • Pincode411041
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100078890
  • ReraGenie IDRG-MH-23578

Builder

  • NameVIDYASHREE DEVELOPERS UNIT-1 LLP
  • Entity typePartnership
  • PartnersADMULWAR PROPERTIES LLP THROUGH ITS DESIGNATED PARTNER ATIT SHRIKANT ADMULWAR, Sumit Sidram Shinde, SUJAL SIDRAM SHINDE, DEVIDAS DNYANOBA KADAM
  • Other registrations1 more →

Key dates

this monthRegisteredJan 2025PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Jan 2025
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

12%3 of 25 units booked
58.0%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SERENE MISTYNA7622325

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 18%.

SERENE MISTY: 20% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure18%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed66

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots66
Closed/Covered30
Open Space36

Land and ownership5

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,500 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
Encumbrance on the landDeclared none
Declared on25 Jun 2025
LandownerVillageDistrict
MR SHREETEJ SUDHIR DARODEPune (M Corp.)Pune
MR SHREERAJ SUDHIR DARODEPune (M Corp.)Pune
SHREE BABAN GANU KHMUBHARKARDhayari (Part)Pune
SHREETEJ SUDHIR DARODEPune (M Corp.)Pune
SHREERAJ SUDHIR DARODEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI5848.47
Proposed, not sanctioned2,648 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDESTINATION CENTER,UPPER GROUND FLR, MAGARPATTA CITY, HADAPSAR, PUNE, MAHARASHTRA - 411028
Estimated costRs 5.75 cr
Cost incurredRs 3.33 cr
Work done57.97%
BuildingWingEstimatedIncurred
SERENE MISTYNARs 4.93 crRs 2.81 cr
-NARs 82.16 lakhRs 51.82 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectATIT SHRIKANT ADMULWAR
EngineerSHREYAS THAKUR
EngineerRUPESH PAWAR
EngineerSAMBHAJI GORE
Chartered AccountantRITESH SHARAD SHAH
Chartered AccountantYOGESH D MALI
PartnerRole in project
VIDYASHREE DEVELOPERS UNIT-1 LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf24 Jun 2026
Withdrawal Update Form 2File: FROM 02 SERENE MISTY.pdf24 Jun 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf24 Jun 2026
Withdrawal Update Form 1File: from 01 Vidyashree unit 01 LLP.pdf26 Feb 2026
Withdrawal Update Form 2File: FROM 02 SERENE MISTY.pdf26 Feb 2026
Withdrawal Update Form 3File: Form 3 VDI -1 SERENE MISTY.pdf26 Feb 2026
Withdrawal Update Form 1File: Form 1 Vidyashree Developers unit 1 llp jun 25.pdf2 Dec 2025
Withdrawal Update Form 1File: form -01 serene misty sep-2025.pdf2 Dec 2025
Withdrawal Update Form 2File: vdl eng-30-06-2025.pdf2 Dec 2025
Withdrawal Update Form 2File: FORM - 02.pdf2 Dec 2025
Withdrawal Update Form 3File: Vidyashree Unit-1(30-06-25)_0001.pdf2 Dec 2025
Withdrawal Update Form 3File: form - 03 CA certificate.pdf2 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf26 Jun 2025
Form 1File: V D 1 RERA form 1 Architect Certificate.pdf25 Jun 2025
Form 2File: V D 1 RERA form 2 Engineer Certificate.pdf25 Jun 2025
Form 3File: V D 1 RERA form 3 CA Certificate.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf25 Jun 2025
Details of encumbrances concerned to FinanceFile: Encumbrance Certificat-1.pdf16 Apr 2025
Details of encumbrances concerned to FinanceFile: Mortgage deed Vidyashree Developers unit 1LLP Index 2-3.pdf16 Apr 2025
CERSAI detailsFile: Cersai Declaration.pdf16 Apr 2025
Details of encumbrances concerned to LegalFile: Encumbrance Certificat-1.pdf16 Apr 2025
Details of encumbrances concerned to LegalFile: Mortgage deed Vidyashree Developers unit 1LLP Index 2-3.pdf16 Apr 2025
Other - LegalFile: वडगांव खुर्द_25_2अ_1_Satbara.pdf2 Jan 2025
Other - LegalFile: वडगांव खुर्द_25_2ब_Satbara.pdf2 Jan 2025
Other - LegalFile: Declaration BABAN KUMBHARKAR.pdf30 Dec 2024
Other - FinanceFile: Declaration BABAN KUMBHARKAR.pdf30 Dec 2024
Other - FinanceFile: Declaration SHREETEJ DARODE.pdf24 Dec 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf13 Dec 2024
Deviation Report with respect to Allotment letterFile: ALLOTMENT Deviation Report_0001.pdf13 Dec 2024
Deviation Report with respect to model copy of AgreementFile: AFS Deviation Reports Model_0001.pdf13 Dec 2024
Proforma of Agreement for saleFile: AFS FINAL.pdf13 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: disclosure for secured with date.pdf13 Dec 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Certificate_0001.pdf12 Dec 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance Certificate_0001.pdf12 Dec 2024
Other - LegalFile: VD UNIT 1 LLP DEED_11zon.pdf6 Dec 2024
Other - LegalFile: Admulwar Properties LLP DEED.pdf6 Dec 2024
Copy of the legal title reportFile: Search Report Final.pdf5 Dec 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE (1) (1) (1).pdf5 Dec 2024
Declaration in FORM BFile: FORM B-output.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SM (1) (1).pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE - SERENE MISTY_0001.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG CERTIFICATE SM-output (1) (1).pdf5 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: cc verification-cropped.pdf5 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A - BANK LETTER.pdf5 Dec 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE (1) (1) (1).pdf5 Dec 2024
Other - FinanceFile: LANDWONER DECLARATION-output.pdf5 Dec 2024
Other - TechnicalFile: ANNEXURE A DECLATION CUM UNDERTAKING-output.pdf5 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 1 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B) (5 Dec 2024
Building plan approvalFile: Plan 03_11zon.pdf16 Nov 2024
Building plan approvalFile: Plan 02_11zon.pdf16 Nov 2024
Layout approvalFile: Layout HIGHLIGHTED_11zon.pdf16 Nov 2024
Layout approvalFile: Layout_11zon.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Layout_11zon.pdf16 Nov 2024
Copy of Layout Approval (in case of layout)File: Layout HIGHLIGHTED_11zon.pdf16 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC_0001 (1).pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 02_11zon.pdf16 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 03_11zon.pdf16 Nov 2024
Declaration about Commencement CertificateFile: CC DECLARATION (1).pdf16 Nov 2024
CERSAI detailsFile: CERSAI DECLARATION WITH ADRESS.pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest SM (2) (1).pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest SM final (2).pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest SM final (3).pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest SM final (4).pdf16 Nov 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest SM final.pdf16 Nov 2024
PAN CardFile: PAN CARD VIDYASHREE DEVELOPERS.pdf10 Oct 2024

How this compares with Pune

12%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SERENE MISTY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WADGAON KH13,700+ in Pune

2 kmSERENE MISTYCompleted 55Lapsed / revoked 32Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 164 registered projects within 2 km.

Builder: VIDYASHREE DEVELOPERS UNIT-1 LLP

VIDYASHREE DEVELOPERS UNIT-1 LLP has 2 registrations on MahaRERA, including SERENE MISTY and SHRINIWAS Serene County Wing J & K. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SERENE MISTY is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SERENE MISTY?

The registered promoter entity is VIDYASHREE DEVELOPERS UNIT-1 LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SERENE MISTY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SERENE MISTY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SERENE MISTY?

The professionals named in the filing: Architect: ATIT SHRIKANT ADMULWAR; Engineer: SHREYAS THAKUR; Engineer: RUPESH PAWAR; Engineer: SAMBHAJI GORE; Chartered Accountant: RITESH SHARAD SHAH; Chartered Accountant: YOGESH D MALI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SERENE MISTY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SERENE MISTY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SERENE MISTY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.