ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Serein Phase 1

Completed No litigation declared Residential / Group Housing project

Serein Phase 1

By ARDENT PROPERTIES PRIVATE LIMITED

RG-MH-09367 · RERA P51700000295 · Last updated on MahaRERA portal: 30 Sep 2023

Source: official MahaRERA filing

Red flags

  • 19 complaints at MahaRERA
  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
19Complaints at MahaRERAon this registration
Jump to the 136 documents Report an error

Serein Phase 1 is a Residential / Group Housing project by ARDENT PROPERTIES PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700000295 on 13 Jul 2017. The registration is recorded completed; possession was promised by 31 Mar 2023. The completion date has moved by 6 months from the original filing. 19 complaints are on record with the regulator.

At a glance

Project

  • NameSerein Phase 1
  • TypeResidential / Group Housing
  • Location
    • Pokharan Rd Number 2
    • Siddhachal Housing Society
    • Pawar Nagar
    • Thane West
    • Thane (M Corp.)
    • Thane
    • 400610
  • Pincode400610
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700000295
  • ReraGenie IDRG-MH-09367

Builder

  • NameARDENT PROPERTIES PRIVATE LIMITED
  • Entity typeCompany
  • CINU45200MH2007PTC262414
  • GSTIN27AAGCA2024H1Z2
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsHarleen Singh Oberoi, Reshma Kapil Chheda, KirtiKumar Bandekar
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJul 2017First promiseSep 2022Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on13 Jul 2017
  • Promised completion31 Mar 2023
  • Revised completionRevised to 31 Mar 2023 (originally 30 Sep 2022)
  • Buildings3 building records
  • Documents filed136 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower1NA300000
Tower 2NA350000
Tower4NA350000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Tower1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Tower4100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9
BuildingClosed/CoveredTotal
Tower133
Tower 233
Tower433

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area24,318 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI44572.91
Proposed, not sanctioned43,288 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNariman Point Mumbai

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEdifice Consultant Private Limited
EngineerManoj Sharma Universal Consultants & Valuers LLP
Chartered AccountantJVB & Co
Chartered AccountantOmprakash Kedia & Co
PartnerRole in project
ARDENT PROPERTIES PRIVATE LIMITED-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700012584Sep 2022 → Mar 2023

Reason as filed by the promoterNon-issue of Occupation certificate due to confusion created at Thane Municipal Corporation out of order dated 03.06.22 passed by Hon'ble Supreme court in I.A No. 1003 of 2003 in WP (Civil) No.202 of 1995.

Complaints filed with MahaRERA19

Case no.ComplainantRespondentFiled
CC006000000056945Karan ChellaniARDENT PROPERTIES PVT LTD22/01/2020
CC006000000193454Pallav & Rimi MukerjeeArdent Properties Private Limited23/07/2020
CC006000000193594Ardent Properties Pvt. Ltd1. Mr. Vaibhav Jaywant and 2. Mrs. Shubhangi Jaywant21/09/2020
CC006000000231206Sanjeevani S KadamArdent Properties Pvt. Ltd.17/05/2022
CC006000000194973CHANDRAMOHAN NATARAJANARDENT PROPERTIES PRIVATE LIMITED06/01/2021
CC006000000195064Mrs. Mala & Mr. Haresh PurswaniM/s. Ardent Properties Private Limited23/01/2021
CC006000000195717pooja panjabiArdent properties pvt ltd23/01/2021
CC006000000195719pooja panjabiArdent properties pvt ltd23/01/2021
CC006000000196110Omprakash Harishankar ShahiArdent Properties Pvt. Ltd22/02/2021
CC006000000197162Pratik MhatreArdent Properties Private Limited11/06/2021
CC006000000302996Pratik MhatreArdent Properties Private Limited13/11/2022
CC006000000220940Venkatraja Udayvara RaoArdent Properties Pvt Ltd23/04/2022
CC006000000209436Ardent Properties Pvt LtdKaran Chellani17/12/2021
CC006000000292761Manoharan Unni PanickerArdent Properties Private Limited21/09/2022
CC006000000303704Ali Razi And 11 OrsArdent Properties Pvt Ltd16/12/2022
CC006000000333830Madhukar Motiram PatilARDENT PROPERTIES PVT LTD05/01/2023
CC006000000374823Girish Prakash RohraArdent Properties Private Limited17/03/2023
CC006000000397556Manoj Assudomal KotwaniArdent Properties Limited26/09/2023
CC12500159NEEL ATMARAM BHATIAARDENT PROPERTIES PRIVATE LIMITED17/01/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Nov 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Oct 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jun 2023

Documents filed136

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 136 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Ardent RERA Certificate_1_11zon.pdf30 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: Serein-RERA_Architect completion certificate_Form 4.pdf3 Jul 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Serein Phase 1 OC.pdf22 Jun 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architech certificate of completion.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q3 2022-23.pdf2 Apr 2023
Form 2AFile: Q3 Form3 CA Cert Dec-2021-22 Serein.pdf2 Apr 2023
Form 2AFile: Form 2A QA Cert Serein Q3 2021-22.pdf2 Apr 2023
Form 2AFile: Form 2A QA Cert Serein Q4 2021-22.pdf2 Apr 2023
Form 2AFile: Quality certificate-Q1-FY 22-23.pdf2 Apr 2023
Form 2AFile: Quality certificate-Q2-FY 22-23.pdf2 Apr 2023
Certificates of CA (Form 3)File: Q3 Form3 CA Cert Dec 2022-23 Serein.pdf2 Apr 2023
Proforma of Agreement for saleFile: AFS.pdf17 Feb 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Serein CHS LTD 6-2-23.pdf10 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Serein-RERA_Architect completion certificate.pdf12 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A QA Cert Serein Q4 2021-22.pdf1 Dec 2022
Certificates of CA (Form 3)File: Q2 Form3 CA Cert Sept-2022-23 Serein.pdf1 Dec 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q2 2022-23.pdf27 Oct 2022
Form 2AFile: Quality certificate-Q2-FY 22-23.pdf9 Oct 2022
Disclosure of sold/ booked inventoryFile: Format D Serein units sold Q2 2022-23.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Format D Serein units sold Q2 2022-23.pdf7 Oct 2022
Disclosure of sold/ booked inventoryFile: Format D Serein units sold Q2 2022-23.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5-Serein Phase I FY 21-22 sept 22.pdf6 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Arch Cert -Q2-FY 22-23 Serein.pdf30 Sep 2022
Certificates of CA (Form 3)File: Q1 Form3 CA Cert June-2022-23 Serein.pdf6 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q1 2022-23.pdf5 Sep 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q4 2021-22.pdf18 Jul 2022
Certificates of CA (Form 3)File: Q4 Form3 CA Cert March-2022 Serein.pdf18 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Arch Cert -Q1-FY 22-23.pdf8 Jul 2022
Form 2AFile: Quality certificate-Q1-FY 22-23.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: sold unsold.pdf8 Jul 2022
Certificates of CA (Form 3)File: Q3 Form3 CA Cert Dec-2021-22 Serein.pdf11 Apr 2022
Certificates of CA (Form 3)File: Q3 Form3 CA Cert Dec-2021-22 Serein.pdf11 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cert Serein Q4 2021-22.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q3 2021-22.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Q4 Sold Unsold units Serein.pdf5 Apr 2022
Form 2AFile: Form 2A QA Cert Serein Q2 2021-22.pdf4 Mar 2022
Form 2AFile: Form 2A QA Cert Serein Q3 2021-22.pdf4 Mar 2022
Disclosure of sold/ booked inventoryFile: Q3 Serein Ph-1 Sold Unsold Inventory.pdf22 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cert Serein Q3 2021-22.pdf15 Jan 2022
Form 2AFile: Form 2A QA Cert Serein Q3 2021-22.pdf15 Jan 2022
Proforma of Allotment letterFile: Draft Agreement for Sale E.pdf15 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q2 2021-22.pdf1 Nov 2021
Disclosure of sold/ booked inventoryFile: Q2 Serein Ph1 - Disclosure of Sold booked inventory.pdf1 Nov 2021
Certificates of CA (Form 3)File: Q2 Form3 CA Cert Sept-2021-22 Serein.pdf27 Oct 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cert Serein Q2 2021-22.pdf1 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Ardent Form 5 Mar-21 signed.pdf1 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold Booked Inventory Serein Q1 2021-22.pdf30 Jul 2021
Certificates of CA (Form 3)File: Q1 Form3 CA Cert June-2021-22 Serein.pdf30 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engg Cert Serein Q1 2021-22.pdf19 Jul 2021
Declaration about Commencement CertificateFile: Format D Serein Ph1 CC Declaration 13Mar19.pdf15 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Arch cert Serein Q1 2021-22.pdf15 Jul 2021
Form 2AFile: Form 2A QA Cert Serein Q1 2021-22.pdf15 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Serein Q4 2020-21.pdf15 Jul 2021
Form 2AFile: Form 2A Serein Q1 2020-21.pdf1 Jul 2021
Form 2AFile: Form 2A Serein Q2 2020-21.pdf1 Jul 2021
Form 2AFile: Form 2A Serein Q3 2020-21.pdf1 Jul 2021
Form 2AFile: Form 2A Serein Q4 2020-21.pdf1 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q4 Form 2 Engg Cert _Serein.pdf3 Jun 2021
Certificates of CA (Form 3)File: Q4 FORM 3 March 2021 Serein.pdf2 Jun 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q1 Form 2 Engg Cert _Serein_compressed.pdf20 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q2 Form 2 Engg Cert _Serein_compressed.pdf20 May 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Q3 Form 2 Engg Cert _Serein_compressed.pdf20 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Serein Arch Q4 April 2021.pdf27 Apr 2021
Certificates of CA (Form 3)File: Serein Q1 FORM 3 June-20.pdf4 Mar 2021
Certificates of CA (Form 3)File: Serein Q2 FORM 3 Sep-20.pdf4 Mar 2021
Certificates of CA (Form 3)File: Serein Q3 FORM 3 Dec-20.pdf4 Mar 2021
Certificates of CA (Form 5)File: Ardent RERA_FORM 5 FY-19-20.pdf26 Feb 2021
Certificates of CA (Form 3)File: Q4 Form 3 CA Cert Ardent 2019-20.pdf14 Feb 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Serein Arch Q3 14-01-2021.pdf26 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Serein Arch Q2 17-11-2020.pdf18 Nov 2020
Building plan approvalFile: 04 Serein Approved Layout 13-12-2019.pdf15 Nov 2020
Building plan approvalFile: 04 Serein Approved Layout 13-12-2019.pdf15 Nov 2020
Building Plan Approval (IOD)File: 04 Serein Approved Layout 13-12-2019.pdf15 Nov 2020
Building Plan Approval (IOD)File: 04 Serein Approved Layout 13-12-2019.pdf15 Nov 2020
Details of Restarting of Construction work post lockdownFile: Essential const work 6522020.pdf13 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Letter to MahaRERA for annual audit CA certificate.pdf21 Oct 2020
OtherFile: Letter to MahaRERA for annual audit CA certificate.pdf21 Oct 2020
Building plan approvalFile: SANCTION 13-12-2029.pdf20 Oct 2020
Building Plan Approval (IOD)File: SANCTION 13-12-2029.pdf20 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Amended CC with T3 13122019.pdf20 Oct 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one moved by 6 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Serein Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Siddhachal Housing Society, Pawar Nagar, Thane West,7,600+ in Thane

2 kmSerein Phase 1Completed 112Lapsed / revoked 56Other 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 279 registered projects within 2 km.

Builder: ARDENT PROPERTIES PRIVATE LIMITED

ARDENT PROPERTIES PRIVATE LIMITED has 2 registrations on MahaRERA, including Serein Phase 1 and Serein Phase II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Serein Phase 1 is delayed beyond 31 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Serein Phase 1?

The registered promoter entity is ARDENT PROPERTIES PRIVATE LIMITED, a company as per the filing. Its CIN U45200MH2007PTC262414 and GSTIN 27AAGCA2024H1Z2 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Serein Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Serein Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Serein Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Serein Phase 1?

The professionals named in the filing: Architect: Edifice Consultant Private Limited; Engineer: Manoj Sharma Universal Consultants & Valuers LLP; Chartered Accountant: JVB & Co; Chartered Accountant: Omprakash Kedia & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Serein Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Serein Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Serein Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.