ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / SENTOSA PRIDE WING A

Registration lapsed No litigation declared Residential / Group Housing project

SENTOSA PRIDE WING A

By SHREE KRISHNA ASSOCIATES

RG-MH-81441 · RERA P52100050231 · Last updated on MahaRERA portal: 23 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
8 of 11Construction stages donefurthest along: Installation of Lifts, 90%
6 of 91Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 122 documents Report an error

SENTOSA PRIDE WING A is a Residential / Group Housing project by SHREE KRISHNA ASSOCIATES in Pune, Maharashtra, registered with MahaRERA as P52100050231 on 27 Mar 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 85 of the 91 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameSENTOSA PRIDE WING A
  • TypeResidential / Group Housing
  • Location
    • PUNAWALE
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050231
  • ReraGenie IDRG-MH-81441

Builder

  • NameSHREE KRISHNA ASSOCIATES
  • Entity typeOthers
  • Named personsVISHAL JAWAHAR SABHANDASANI, LACHHMAN GOPICHAND MORYANI, DILIP GURMUKHDAS MORYANI, LATA GURMUKHDAS MORYANI, MAHESH NARANINDAS BULCHANDANI, BULCHANDANI HARUMAL NARAINDAS, HARILAL LAKHMICHAND HINDUJA HUF
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked

Key dates

4 months past promisethis monthRegisteredMar 2023PromisedJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Mar 2023
  • Promised completion30 Jun 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed122 files

Current status

93%85 of 91 units booked
71.7%Work done, per cost certificate

Figures as on 23 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SENTOSA PRIDE WING ANA171582991

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.

SENTOSA PRIDE WING A: 81% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 23 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed284

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots284
Closed/Covered47
Open Space237

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,071 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI12848.06
Proposed, not sanctioned9,082 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPIMPLE SAUDAGAR
Estimated costRs 43.00 cr
Cost incurredRs 30.82 cr
Work done71.67%
BuildingWingEstimatedIncurred
SENTOSA PRIDE WING ANARs 42.00 crRs 29.82 cr
-NARs 1.00 crRs 1.00 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDREAM SPACE ARCHITECTS
EngineerRAHUL SAWANT
EngineerHITLAR MISHRA
Chartered AccountantPGMJ AND ASSOCIATES
Chartered AccountantNITISH VAIDYA & ASSOCIATES
PartnerRole in project
SHREE KRISHNA ASSOCIATES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed122

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 122 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf23 May 2026
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf23 May 2026
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf23 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf23 May 2026
Withdrawal Update Form 1File: Form 1 Q4 FY 25-26.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Q4 FY 25-26.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Q4 FY 25-26.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 Q3 FY 25-26.pdf19 Jan 2026
Withdrawal Update Form 2File: Form 2 Q3 FY 25-26.pdf19 Jan 2026
Withdrawal Update Form 3File: Form 3 Q3 FY 25-26.pdf19 Jan 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25 SKA.pdf20 Nov 2025
Withdrawal Update Form 1File: Form 1 Q2 FY 2025-26.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2 Q2 FY 2025-26.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3 Q2 FY 2025-26.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1 SKA.pdf12 Oct 2025
Withdrawal Update Form 2File: Form 2 SKA.pdf12 Oct 2025
Withdrawal Update Form 3File: Form 3 Final Withdrwal.pdf12 Oct 2025
Form 1File: Pride Form 1.pdf19 Jul 2025
Form 2File: Form 2.pdf19 Jul 2025
Form 3File: Form 3 Final.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Circular Q4.pdf19 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pride Form 1.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Circular Q4.pdf20 Apr 2025
Layout approvalFile: Sanction plan.pdf19 Feb 2025
Building plan approvalFile: Building Plan 2.pdf19 Feb 2025
Building plan approvalFile: Building Plan 3.pdf19 Feb 2025
Building plan approvalFile: Building Plan 4.pdf19 Feb 2025
Building plan approvalFile: Building Plan 5.pdf19 Feb 2025
Building plan approvalFile: Building Plan 6.pdf19 Feb 2025
Copy of Layout Approval (in case of layout)File: Sanction plan.pdf19 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 2.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 3.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 4.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 5.pdf19 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Building Plan 6.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 24-25.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf19 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-Sentosa Pride Wing A.pdf19 Jan 2025
Disclosure of sold/ booked inventoryFile: Pride A Wing-Sold Circular 29.pdf19 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKA - Form no 1 Q2.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKA-A FORM 2 - Q2 2024.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: SKA - A - Sold - Unsold Q2-2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final Architect.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pride -A Form No 2 - Q1 2024.pdf23 Jul 2024
Disclosure of sold/ booked inventoryFile: Pride -A Sold - Unsold - Q1 2024.pdf23 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final Signed copy_compressed.pdf23 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SKA- A win- Form 2A - 2023-24-Q4.pdf6 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SKA-A Form 1 -2023-24-Q4.pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SKA - A - Form 2 (Q4 FY 23-24).pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: SKA- A Sold Circular 29 - Q4 23-24.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q4 23-24).pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q4 22-23).pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q1 23-24).pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q2 23-24).pdf20 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 (Q3 23-24).pdf20 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (Q4 FY 22-23).pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Ska-A Q1.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Ska-A Q2.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Ska-A Q3.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final SKA- Form 2 - Q4 2022-23.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final SKA- Form 2 - Q1 2023-24.pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final Form 2 (Q2 - FY - 23-24 ).pdf12 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Final form 2 - Q3 2023-24.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Final SKA-2A - Quality -2022-23.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: sold circular 29 - Q4 22-23 A.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: sold circular 29 - Q1 23-24 A.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: sold circular 29 - Q2 23-24 A.pdf12 Mar 2024
Disclosure of sold/ booked inventoryFile: sold circular 29 - Q3 23-24 A.pdf12 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PS.pdf31 Dec 2023
Disclosure of sold/ booked inventoryFile: SKA-A SOLD - Q1.pdf20 Nov 2023
Disclosure of sold/ booked inventoryFile: SKA-A SOLD - Q2 .pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 final COMPRESS.pdf20 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 COMPRESS.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Ska-A Q1.pdf17 Nov 2023

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SENTOSA PRIDE WING A on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNAWALE13,700+ in Pune

2 kmSENTOSA PRIDE WING ACompleted 65Lapsed / revoked 34Other 128Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: SHREE KRISHNA ASSOCIATES

SHREE KRISHNA ASSOCIATES has 4 registrations on MahaRERA, including SENTOSA PRIDE WING C and SENTOSA PRIDE WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that SENTOSA PRIDE WING A shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SENTOSA PRIDE WING A is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SENTOSA PRIDE WING A?

The registered promoter entity is SHREE KRISHNA ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SENTOSA PRIDE WING A?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SENTOSA PRIDE WING A?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SENTOSA PRIDE WING A?

The professionals named in the filing: Architect: DREAM SPACE ARCHITECTS; Engineer: RAHUL SAWANT; Engineer: HITLAR MISHRA; Chartered Accountant: PGMJ AND ASSOCIATES; Chartered Accountant: NITISH VAIDYA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SENTOSA PRIDE WING A?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SENTOSA PRIDE WING A. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SENTOSA PRIDE WING A to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.