Sector B- Tower A and B

By AGILE REAL ESTATE DEV PRIVATE LIMITED

RG-MH-31886 · RERA PR1332022500106 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA
  • Rs 1,125.00 crore secured on the land, in favour of HDFC Capital Affordable Real Estate Fund Three and HDFC Capital AIF Three Scheme Two

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2031Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
413 of 614Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 41 documents Report an error

Sector B- Tower A and B is a Residential / Group Housing project by AGILE REAL ESTATE DEV PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as PR1332022500106 on 23 Jun 2025. Possession is promised by 31 Dec 2031. 201 of the 614 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSector B- Tower A and B
  • TypeResidential / Group Housing
  • Location
    • Bayer Compound
    • Kolshet Road
    • Sector 5
    • Village Balkum
    • Thane
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PR1332022500106
  • ReraGenie IDRG-MH-31886

Builder

  • NameAGILE REAL ESTATE DEV PRIVATE LIMITED
  • Entity typeCompany
  • CINU70100MH2007PTC173950
  • GSTIN27AAGCA5301H1Z0
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsImtiaz Kanga, Hemant Dave
  • Other registrations2 more →
  • Declared earlier projects2 →

Key dates

this monthRegisteredJun 2025PromisedDec 2031

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jun 2025
  • Promised completion31 Dec 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed41 files

Current status

33%201 of 614 units booked
7.6%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 2ANA54513153318
Tower 2BNA51472960296

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

Tower 2A27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Tower 2B27%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNo0%
Energy managemcntNo0%
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed1293

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,293
Stilt / Ground130
Podiums / Upper Parking Floor616
Basement547
BuildingStilt / GroundPodiums / Upper Parking FloorBasementTotal
Tower 2A68319284671
Tower 2B62297263622

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area82,660 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofHDFC Capital Affordable Real Estate Fund Three and HDFC Capital AIF Three Scheme Two
Secured amountRs 1,125.00 crore
CERSAI search filedYes
Declared on11 Jun 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI273759.53
Proposed, not sanctioned76,982 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., 215, Free Press House, Free Press Marg, Nariman Point, Mumbai.400021
Estimated costRs 445.71 cr
Cost incurredRs 33.99 cr
Work done7.63%
BuildingWingEstimatedIncurred
Tower 2ANARs 165.71 crRs 11.29 cr
Tower 2BNARs 153.00 crRs 12.70 cr
-NARs 127.00 crRs 10.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEntech Consultant
EngineerAnil Joshi
EngineerGanesh Lad
Chartered AccountantC.R.Mohnot & Co
PartnerRole in project
AGILE REAL ESTATE DEV PRIVATE LIMITED-

Litigation declared4

CaseCourtStatus
1867/2022Bombay High CourtOngoing
RTS/C-I/T2/Jaminbab/1019/2017/2017Tehsildar, Thane Municipal CorporationOngoing
JA.BA.No.VA.SHI.1205/2017Tehsildar, Thane Municipal CorporationOngoing
13655/2018Bombay High CourtOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
SM12600147Bhakti AchrekarAGILE REAL ESTATE DEV PRIVATE LIMITED18/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 14 May 2025
  3. Building plan approvalNot on the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2031

Documents filed41

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Sector B AC.pdf20 Jul 2026
Withdrawal Update Form 2File: Sector B EC.pdf20 Jul 2026
Withdrawal Update Form 3File: Sector B Tower A B.pdf20 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A Sector B Tower AB.pdf22 Jun 2026
Withdrawal Update Form 1File: Sector B AB AC.pdf20 Apr 2026
Withdrawal Update Form 2File: Sector B AB EC.pdf20 Apr 2026
Withdrawal Update Form 3File: Sector B Tower AB.pdf20 Apr 2026
Withdrawal Update Form 1File: Sector B AC.pdf25 Feb 2026
Withdrawal Update Form 2File: Sector B EC.pdf25 Feb 2026
Withdrawal Update Form 3File: CA certificate RERA DEC 25 Estella TowerA and B Final.pdf25 Feb 2026
Withdrawal Update Form 1File: Sector B AC.pdf24 Nov 2025
Withdrawal Update Form 2File: Sector B EC.pdf24 Nov 2025
Withdrawal Update Form 3File: Sector B Sep-25.pdf24 Nov 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf19 Sep 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf19 Sep 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf19 Sep 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf24 Jul 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf24 Jul 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf24 Jul 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf23 Jul 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf23 Jul 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf23 Jul 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf22 Jul 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf22 Jul 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf22 Jul 2025
Withdrawal Update Form 1File: Sector B AC Agile.pdf22 Jul 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf22 Jul 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf22 Jul 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf22 Jul 2025
Withdrawal Update Form 2File: Sector B (Agile) EC.pdf22 Jul 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf22 Jul 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf22 Jul 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf22 Jul 2025
Withdrawal Update Form 3File: Sector B- TOWER Au0026B.pdf22 Jul 2025
Declaration and undertaking (Annexure A)File: Annexure A.pdf11 Jun 2025
Layout approvalFile: First Page.pdf14 May 2025
Layout approvalFile: Segment 001 of Upload.pdf14 May 2025
Layout approvalFile: Segment 002 of Upload.pdf14 May 2025
Layout approvalFile: Segment 003 of Upload.pdf14 May 2025
Layout approvalFile: Segment 004 of Upload.pdf14 May 2025
Layout approvalFile: Segment 005 of Upload.pdf14 May 2025

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
PrimeraP51700055574Village Balkum, Thane707Apr 2024OngoingDec 2029Not due yet

How this compares with Thane

33%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sector B- Tower A and B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Balkum, Thane7,600+ in Thane

2 kmSector B- Tower A and BCompleted 144Lapsed / revoked 56Other 104Dot size: filed unitsN

Filed coordinates, straight-line distance. 304 registered projects within 2 km.

Builder: AGILE REAL ESTATE DEV PRIVATE LIMITED

Agile Real Estate Dev Private Limited has 3 registrations on MahaRERA, including Primera and Sector B- Tower A and B. Its filings disclose 2 earlier MahaRERA projects, none completed yet. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sector B- Tower A and B is delayed beyond 31 Dec 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sector B- Tower A and B?

The registered promoter entity is AGILE REAL ESTATE DEV PRIVATE LIMITED, a company as per the filing. Its CIN U70100MH2007PTC173950 and GSTIN 27AAGCA5301H1Z0 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sector B- Tower A and B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Sector B- Tower A and B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Sector B- Tower A and B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sector B- Tower A and B?

The professionals named in the filing: Architect: Entech Consultant; Engineer: Anil Joshi; Engineer: Ganesh Lad; Chartered Accountant: C.R.Mohnot & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sector B- Tower A and B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sector B- Tower A and B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sector B- Tower A and B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.