Red flags

  • Litigation declared, 2 cases
  • Rs 400.00 crore secured on the land, in favour of ICICI Bank Limited

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 5 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Excavation, 96%
60 of 233Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

Sector 5 - Wing C is a Residential / Group Housing project by Agile Real Estate Pvt. Ltd. in Thane, Maharashtra, registered with MahaRERA as P51700020196 on 29 Mar 2019. Possession is promised by 30 Dec 2027. 173 of the 233 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSector 5 - Wing C
  • TypeResidential / Group Housing
  • Location
    • Kolshet Road
    • Village Balkum
    • Thane
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700020196
  • ReraGenie IDRG-MH-02925

Builder

  • NameAgile Real Estate Pvt. Ltd.
  • Entity typeCompany
  • CINU70102MH2008PTC177239
  • GSTIN27AAGCA7403G1ZV
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorImtiaz Kanga
  • Other registrations18 more →
  • Completed13 of 19
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2019PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Mar 2019
  • Promised completion30 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

74%173 of 233 units booked
43.8%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA51492330233

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 96%.

Wing C: 51% average across the applicable activities

ActivityProgress
Excavation96%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure62%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed681

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots681
Closed/Covered681

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area1,375 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI Bank Limited
Secured amountRs 400.00 crore
CERSAI search filedYes
Declared on3 Dec 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI23353.35
Proposed, not sanctioned22,942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTrade World, B Wing, Kamla Mills Compound, Senapati Bapat Marg, Lower Parel, Mumbai 400 013
Estimated costRs 166.79 cr
Cost incurredRs 73.03 cr
Work done43.78%
BuildingWingEstimatedIncurred
Wing CNARs 114.00 crRs 54.36 cr
-NARs 52.79 crRs 18.67 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJethe & Associates
EngineerZankar Borse
Chartered AccountantC.R Mohnot & Co.
Chartered AccountantSinghi & Co.
PartnerRole in project
Agile Real Estate Pvt. Ltd.-

Litigation declared2

CaseCourtStatus
Revenue/C-1/T-2/ Land/Kavi-1019/17/2016TehsildarPending
TMC/TDD/3135/2017Executive Engineer City Development Dept TMC ThanePending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Mar 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Mar 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Mar 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Sector 5 Wing C.pdf22 Jun 2026
Withdrawal Update Form 1File: Sector 5 Wing C AC.pdf7 Nov 2025
Withdrawal Update Form 2File: Sector 5 Wing C EC.pdf7 Nov 2025
Withdrawal Update Form 3File: EXpansia C.pdf7 Nov 2025
Form 5 (FY 2024-2025)File: Sector 5- Wing C.pdf24 Sep 2025
Withdrawal Update Form 1File: Sector 5 Wing C.pdf18 Sep 2025
Withdrawal Update Form 2File: Sector 5-Wing C.pdf18 Sep 2025
Withdrawal Update Form 3File: SECTOR 5 Wing C.pdf18 Sep 2025
Form 2A (FY 2024-2025)File: Sector 5 C.pdf12 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5 Wing C.pdf20 Apr 2025
Certificates of CA (Form 3)File: EXPANSIA c.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 5 Wing C EC.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5 C.pdf20 Jan 2025
Certificates of CA (Form 3)File: Sector 5 Wing C.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Wing C.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sector 5 C.pdf21 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5 C.pdf20 Oct 2024
Certificates of CA (Form 3)File: Sector 5 Wing C_241018_122032.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 5 C.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5-Wing C.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: wing C.pdf20 Jul 2024
Certificates of CA (Form 3)File: Expansia C.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sector 5 Wing C.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5-Wing C.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 5 - Wing C Sign.pdf20 Apr 2024
Certificates of CA (Form 3)File: Sector 5 Wing C.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5 wing C.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 5 Wing C.pdf20 Jan 2024
Certificates of CA (Form 3)File: Sector 5 Wing C.PDF19 Jan 2024
Certificates of CA (Form 3)File: Sector 5 Wing C.PDF20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Expansia Tower C.pdf30 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5 Wing C.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 5 Wing C.pdf25 Jul 2023
Certificates of CA (Form 3)File: Sector 5 Wing C.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Sector 5 C.pdf23 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sector 5 C.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 5 Wing C.pdf23 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 5 Wing C.pdf23 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 1 Annual Audit Report of Statutory CA (Form 5) (3).pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Expansia Tower C_Agile.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sector 5 C.pdf21 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Sector 5 Wing Cpdf.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Tower C Sector 5.pdf5 Oct 2021
Declaration about Commencement CertificateFile: sector 5- c.pdf4 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Wing C.pdf20 Jul 2021
Form 2AFile: Sector 5 Wing C-Mar2021.pdf7 May 2021
Form 2AFile: Sector 5 Wing C-Dec2020 signed.pdf10 Feb 2021
Form 2AFile: Sector 5 Wing C-Sept2020.pdf29 Oct 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Expansia C.pdf9 Oct 2020
Form 2AFile: Sector 5 Wing C-March 2020.pdf14 Sep 2020
Form 2AFile: Sector 5 Wing C-June 2020.pdf14 Sep 2020
Form 2AFile: Sector 5 Wing C.pdf16 Jan 2020
Proforma of Allotment letterFile: AFS Sector5 Wing C.pdf4 Nov 2019
Form 2AFile: Sector 5 Wing C.pdf16 Oct 2019
Annual Audit Report of Statutory CA (Form 5)File: Sector 5 C.pdf30 Sep 2019
Form 2AFile: Sector 5 Wing C.pdf6 Aug 2019
Form 2AFile: Sector 5 Wing C(1).pdf29 Jun 2019
Copy of the legal title reportFile: Addendum-2019.pdf6 Apr 2019
Details of encumbrancesFile: Encumbrance Certificate.pdf6 Apr 2019
Building plan approvalFile: IOD.pdf27 Mar 2019
Layout approvalFile: Layout-1.pdf27 Mar 2019
Copy of the legal title reportFile: TC Final.pdf27 Mar 2019
Copy of the legal title reportFile: TC 1.pdf27 Mar 2019
Details of encumbrancesFile: Encumbrance Certificate.pdf27 Mar 2019
Details of encumbrancesFile: Wing C.pdf27 Mar 2019
Copy of Layout Approval (in case of layout)File: Layout-1.pdf27 Mar 2019
Building Plan Approval (IOD)File: IOD.pdf27 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf27 Mar 2019
Declaration in FORM BFile: Wing C.pdf27 Mar 2019
Certificates of CA (Form 3)File: Wing C.pdf27 Mar 2019
Proforma of Allotment letterFile: Wing C.pdf27 Mar 2019
OtherFile: Wing C.pdf27 Mar 2019

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Sunrise EBalkum Thane 400607100CompletedDec 2022Jan 2020
Sunrise DBalkum Thane 4006071,022CompletedDec 2022Jan 2020
Sunrise CBalkum Thane 400607126CompletedDec 2022Jan 2020
Sunrise BBalkum Thane 400607169CompletedDec 2022Jan 2020
Sunrise ABalkum Thane 400607126CompletedDec 2022Jan 2020

How this compares with Thane

74%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sector 5 - Wing C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Village Balkum, Thane7,600+ in Thane

2 kmSector 5 - Wing CCompleted 148Lapsed / revoked 55Other 95Dot size: filed unitsN

Filed coordinates, straight-line distance. 298 registered projects within 2 km.

Builder: Agile Real Estate Pvt. Ltd.

Agile Real Estate Pvt. Ltd. has 19 registrations on MahaRERA, including Sunrise A and Sunrise C. Its filings disclose 5 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Litigation is declared on 14 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sector 5 - Wing C is delayed beyond 30 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sector 5 - Wing C?

The registered promoter entity is Agile Real Estate Pvt. Ltd., a company as per the filing. Its CIN U70102MH2008PTC177239 and GSTIN 27AAGCA7403G1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sector 5 - Wing C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sector 5 - Wing C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sector 5 - Wing C?

The professionals named in the filing: Architect: Jethe & Associates; Engineer: Zankar Borse; Chartered Accountant: C.R Mohnot & Co.; Chartered Accountant: Singhi & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sector 5 - Wing C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sector 5 - Wing C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sector 5 - Wing C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.