ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Sector 2A - Wing D

Registered No litigation declared Residential / Group Housing project

Sector 2A - Wing D

By Eversmile Properties Private Limited

RG-MH-63472 · RERA P51700047329 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 200.00 crore secured on the land, in favour of Tata Capital Housing Finance Limited

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2028Possession promisedno revision filed
6 of 11Construction stages donefurthest along: Internal walls, 95%
1 of 203Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Sector 2A - Wing D is a Residential / Group Housing project by Eversmile Properties Private Limited in Thane, Maharashtra, registered with MahaRERA as P51700047329 on 19 Oct 2022. Possession is promised by 30 Jun 2028. 202 of the 203 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameSector 2A - Wing D
  • TypeResidential / Group Housing
  • Location
    • Bhaktivedanta Swami Marg
    • Shrushti Chowk
    • Mira Road
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • RERA no.P51700047329
  • ReraGenie IDRG-MH-63472

Builder

  • NameEversmile Properties Private Limited
  • Entity typeCompany
  • CINU70100MH1979PTC021291
  • GSTIN27AAACE1576C2ZY
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • DirectorsNarendra Kumar Lodha, Devesh DHANANJAY BHATT, SHRAVAN KUMAR BALI
  • Other registrations8 more →
  • Completed2 of 9

Key dates

this monthRegisteredOct 2022PromisedJun 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on19 Oct 2022
  • Promised completion30 Jun 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed87 files

Current status

100%202 of 203 units booked
81.6%Work done, per cost certificate

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing - DNA403518716203

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

Wing - D: 75% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks52%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.50%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.31%

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes97%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes67%
Storm Water DrainsYes92%
Landscaping & Tree PlantingYes15%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes28%
Water conservation /Rain water harvestingYes52%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes96%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed231

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots231
Closed/Covered231

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area912 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofTata Capital Housing Finance Limited
Secured amountRs 200.00 crore
CERSAI search filedYes
Declared on1 Aug 2025
LandownerVillageDistrict
S.S Navalkar & S. Pradha (thru their Attorney)Mira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira Bhayandar Municipal Corporation
Permissible FSI22605.52
Proposed, not sanctioned21,554 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Jehangir Building MG Road Fort Mumbai 400023
Estimated costRs 102.51 cr
Cost incurredRs 83.63 cr
Work done81.58%
BuildingWingEstimatedIncurred
Wing - DNARs 75.82 crRs 64.01 cr
-NARs 26.69 crRs 19.62 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJethe & Associates
EngineerSachin Moghe
EngineerVijendra Vartak
Chartered AccountantC.R Mohnot & Co.
Chartered AccountantN.A. Shah Associates LLP
PartnerRole in project
Eversmile Properties Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2028

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Sector 2A Wing D.pdf22 Jun 2026
Withdrawal Update Form 1File: Sector 2A D AC.pdf16 Apr 2026
Withdrawal Update Form 2File: Sector 2A D EC.pdf16 Apr 2026
Withdrawal Update Form 3File: Sector 2A Wing D.pdf16 Apr 2026
Withdrawal Update Form 1File: Sector 2A Wing D AC.pdf16 Jan 2026
Withdrawal Update Form 2File: Sector 2A Wing D EC.pdf16 Jan 2026
Withdrawal Update Form 3File: CA Certificate Srishti Sector 2A Wing D.pdf16 Jan 2026
Withdrawal Update Form 1File: Sector 2A D AC.pdf16 Oct 2025
Withdrawal Update Form 2File: Sector 2A D EC.pdf16 Oct 2025
Withdrawal Update Form 3File: Sector 2A wing D.pdf16 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 Sector 2A Wing D March 25.pdf29 Sep 2025
Disclosure of Sold and Booked InventoryFile: 2A Wing D.pdf20 Jul 2025
Form 1File: Sector 2A Wing D.pdf20 Jul 2025
Form 2File: 2A-WING D.pdf20 Jul 2025
Form 3File: Srishti Sector 2A Wing D.pdf20 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Sector 2A D.pdf30 Jun 2025
Disclosure of sold/ booked inventoryFile: Sector 2A D.pdf2 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A Wing D.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A Wing D.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A D AC.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sector 2A Wing D.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A D EC.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sector 2A D.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sector 2A D.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A Wing D.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A D.pdf20 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sector 2A D.pdf11 Oct 2024
Disclosure of sold/ booked inventoryFile: Sector 2A Wing D.pdf6 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A Wing D.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A Wing D.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Sector 2A Wing D.pdf14 Jun 2024
Disclosure of sold/ booked inventoryFile: Sector 2A Wing D.pdf9 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A-Wing D.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A-Wing D.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: WIng D.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sector 2A Wing D.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A Wing D.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A Wing D.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf19 Jan 2024
Details of encumbrances concerned to FinanceFile: Sector 2A Wing D.pdf24 Nov 2023
Details of encumbrances concerned to LegalFile: Sector 2A Wing D.pdf24 Nov 2023
CERSAI detailsFile: CERSAI_Acknowledgemnt_Report_200283795470.pdf24 Nov 2023
Disclosure of sold/ booked inventoryFile: Sector 2A Wing D.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A Wing D.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A Wing D.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Sector 2A Wing D.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Sector 2A Wing D.pdf13 Sep 2023
Disclosure of sold/ booked inventoryFile: Sector 2A Wing D.pdf6 Sep 2023
Layout approvalFile: 1_upload.pdf21 Aug 2023
Copy of Layout Approval (in case of layout)File: 1_upload.pdf21 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: AmendedPlans_CC_14082023.pdf21 Aug 2023
Declaration about Commencement CertificateFile: Sector 2A Wing D 1.pdf21 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A-D.pdf25 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A-D.pdf25 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf25 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sector 2A D.pdf23 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sector 2A WD.pdf27 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sector 2A WD.pdf27 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Srishti Sector 2A Wing D Dec22.pdf27 Feb 2023
Proforma of Allotment letterFile: Srishti Sector 2A- Wing D - AFS - Upload.pdf17 Oct 2022
Deviation Report with respect to model copy of AgreementFile: Srishti AFS Deviation Report Final (1).pdf17 Oct 2022
Deviation Report with respect to Allotment letterFile: LOI Deviation.pdf13 Oct 2022
Other - TechnicalFile: Declaration Sno.pdf13 Oct 2022
Copy of the legal title reportFile: Addendum comp.pdf10 Oct 2022
Details of encumbrances concerned to LegalFile: EC Legal.pdf10 Oct 2022
Copy of the legal title reportFile: MAHARERA Repor Latest.pdf8 Oct 2022
Layout approvalFile: Layout Srishti.pdf27 Sep 2022
Layout approvalFile: Proposed Layout.pdf27 Sep 2022
Building plan approvalFile: Building Layout approved.pdf27 Sep 2022
Building plan approvalFile: WING D - 1ST FLOOR TYPICAL FLOOR final.pdf27 Sep 2022
Copy of Layout Approval (in case of layout)File: Layout Srishti.pdf27 Sep 2022
Copy of Layout Approval (in case of layout)File: Proposed Layout.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: Building Layout approved.pdf27 Sep 2022
Building Plan Approval / NA Order for plotted developmentFile: WING D - 1ST FLOOR TYPICAL FLOOR final.pdf27 Sep 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Srishti Sector 2A Wing D.pdf27 Sep 2022
Proforma of Allotment letterFile: loi.pdf27 Sep 2022

How this compares with Thane

100%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sector 2A - Wing D on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shrushti Chowk, Mira Road7,600+ in Thane

Builder: Eversmile Properties Private Limited

Eversmile Properties Private Limited has 9 registrations on MahaRERA, including Sector 2A - Wing A and Sector 2A - Wing B. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Sector 2A - Wing D is delayed beyond 30 Jun 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sector 2A - Wing D?

The registered promoter entity is Eversmile Properties Private Limited, a company as per the filing. Its CIN U70100MH1979PTC021291 and GSTIN 27AAACE1576C2ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sector 2A - Wing D?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sector 2A - Wing D?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sector 2A - Wing D?

The professionals named in the filing: Architect: Jethe & Associates; Engineer: Sachin Moghe; Engineer: Vijendra Vartak; Chartered Accountant: C.R Mohnot & Co.; Chartered Accountant: N.A. Shah Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sector 2A - Wing D?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sector 2A - Wing D. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sector 2A - Wing D to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.