Home / Browse projects / Thane, Maharashtra / SEASON SAHARA BUILDING NO -6
SEASON SAHARA BUILDING NO -6
By SAMARTH SAI BUILDERS & DEVELOPERS
RG-MH-23197 · RERA P51700077929 · Last updated on MahaRERA portal: 22 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 8 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SEASON SAHARA BUILDING NO -6 is a Residential / Group Housing project by SAMARTH SAI BUILDERS & DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700077929 on 13 Nov 2024. Possession is promised by 31 Dec 2026. The completion date has moved by 8 months from the original filing. 3 of the 75 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSEASON SAHARA BUILDING NO -6
- TypeResidential / Group Housing
- Location
- ADIVALI DHOKALI
- KALYAN EAST
- Adivali
- Kalyan
- Thane
- 421306
- Pincode421306
- RERA no.P51700077929
- ReraGenie IDRG-MH-23197
Builder
- NameSAMARTH SAI BUILDERS & DEVELOPERS
- Entity typePartnership
- GSTIN27ACBFS0635A1ZO
- PartnersHITESH JAIRAM NIHALANI, DINESH RAMDAS MHATRE, PURAN NAMOMAL KUKREJA, RAJESH CHANDERLAL METHWANI
- Other registrations6 more →
- Completed3 of 7
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on13 Nov 2024
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Apr 2026)
- Buildings1 building record
- Documents filed66 files
Current status
Figures as on 22 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SEASON SAHARA BUILDING NO -6 | NA | 16 | 15 | 75 | 0 | 75 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 22 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 70%.
SEASON SAHARA BUILDING NO -6: 61% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 22 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| dutta arjun gawli | Thane (M Corp.) | Thane |
| SHEELA DUTTA GOWLI | Thane (M Corp.) | Thane |
| tukaram bhane | PISAVALI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SEASON SAHARA BUILDING NO -6 | NA | Rs 21.00 cr | Rs 14.70 cr |
| - | NA | Rs 1.00 cr | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DECON CONSULTANT |
| Engineer | ASN |
| Engineer | PRAVIN JAGTAP |
| Engineer | Associated structural engineers llp |
| Chartered Accountant | MUKESH GURANI |
| Chartered Accountant | pradeep bijlani |
| Partner | Role in project |
|---|---|
| SAMARTH SAI BUILDERS & DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe would like to respectfully bring to your attention that the project has encountered certain unforeseen technical challenges that have adversely impacted the originally proposed timelines for completion. We wish to place on record the following reasons for the delay Unforeseen Soil Conditions During the excavation and foundation phase, we encountered unexpected soil conditions that required extensive soil testing and revision of foundation designs resulting in delay in initial stages Delay in Statutory Clearances/Utility Approvals] Technical approval for [water connection/electric load sanct
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Jul 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 22 Jul 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 7 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed66
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE B6.pdf | 22 Jul 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE B6.pdf | 22 Jul 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE B6.pdf | 22 Jul 2026 |
| Withdrawal Update Form 1File: ARTHITECT CERTIFICATE B-6.pdf | 29 Apr 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE T-6.pdf | 29 Apr 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE B-6.pdf | 29 Apr 2026 |
| Withdrawal Update Form 1File: ARTHITECT CERTIFICATE B-6.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: ARTHITECT CERTIFICATE B-6.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE B- 6.pdf | 14 Feb 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE B- 6.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE B-6.pdf | 14 Feb 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE B-6.pdf | 14 Feb 2026 |
| Withdrawal Update Form 1File: ARTHITECT CERTIFICATE B-C.pdf | 31 Oct 2025 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE B- C.pdf | 31 Oct 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE B-C.pdf | 31 Oct 2025 |
| Form 5 (FY 2024-2025)File: SEASON SAHARA BUILD NO 6 FORM 5.pdf | 27 Sep 2025 |
| Form 2A (FY 2024-2025)File: season sahara build no 6 2 A.pdf | 26 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARTHITECT CERTIFICATE T-6.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE B-6.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE T-6.pdf | 19 Apr 2025 |
| Proforma of Agreement for saleFile: RERA DRAFT PISAVALI T-6.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARTHITECT CERTIFICATE T-6.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE T-6.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE T-6.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARTHITECT CERTIFICATE T-6.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE T-6.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE T-6.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: clarification on calculation of the land cost to MAHA RERA AUTHORITY .pdf | 6 Nov 2024 |
| Other - FinanceFile: DECLARATION OF BANK ACCOUNT B-6.pdf | 18 Oct 2024 |
| Copy of the legal title reportFile: 2 Copy of the legal title report.pdf | 14 Oct 2024 |
| Copy of the legal title reportFile: 3 Copy of the legal title report.pdf | 14 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC MAIL KDMC (3).pdf | 7 Oct 2024 |
| Other - TechnicalFile: CC MAIL KDMC (3).pdf | 7 Oct 2024 |
| Other - TechnicalFile: ANNEXURE A (4).pdf | 12 Aug 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report on Allotement.pdf | 7 Aug 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement for sale.pdf | 7 Aug 2024 |
| Layout approvalFile: PLAN 5.pdf | 23 Jul 2024 |
| Layout approvalFile: PLAN 2.pdf | 23 Jul 2024 |
| Layout approvalFile: PLAN 1 (2) (2).pdf | 23 Jul 2024 |
| PAN CardFile: company pan (1).pdf | 23 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 1 (2) (2).pdf | 23 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 2.pdf | 23 Jul 2024 |
| Copy of Layout Approval (in case of layout)File: PLAN 5.pdf | 23 Jul 2024 |
| Proforma of Allotment letterFile: allotment letter order 60.pdf | 23 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE BUILDING NO 6.pdf | 23 Jul 2024 |
| Other - LegalFile: GANESH BHANE KHAREDI KHAT_compressed (1)-1.pdf | 23 Jul 2024 |
| Other - LegalFile: GANESH BHANE KHAREDI KHAT_compressed (1)-2.pdf | 23 Jul 2024 |
| Proforma of Agreement for saleFile: RERA DRAFT PISAVALI 16-09-2024.pdf | 23 Jul 2024 |
| Building plan approvalFile: CC 1.pdf | 22 Jul 2024 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (8).pdf | 22 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE (3).pdf | 22 Jul 2024 |
| Declaration in FORM BFile: FORM B.pdf | 22 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FINAL.pdf | 22 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE FINAL.pdf | 22 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 1.pdf | 22 Jul 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: CC 1.pdf | 22 Jul 2024 |
| Declaration about Commencement CertificateFile: CC DECLARATION.pdf | 22 Jul 2024 |
| CERSAI detailsFile: CERSAI DECLARATION final).pdf | 22 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A (4).pdf | 22 Jul 2024 |
| Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE (3).pdf | 22 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (6).pdf | 22 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (2).pdf | 22 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 3 Disclosure of Interest in Other Real Estate Organizations.pdf | 22 Jul 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 4 Disclosure of Interest in Other Real Estate Organizations.pdf | 22 Jul 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: opening of rera designated bank accounts _ (1) (3).pdf | 22 Jul 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured (1).pdf | 22 Jul 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 66 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SEASON SAHARA BUILDING NO -6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KALYAN EAST7,600+ in Thane
Kohinoor Eden
KGI REALTY PRIVATE LIMITED
Olympia City Phase 1
Balaji Rattan Lifespaces
Krishna Trident
Sonawane Infrastructure Private Limited
Rai s Heaven
RAI RESIDENCY Private Limited
Metro Grande Tower C and D
West Pioneer Properties India Pvt Ltd
SEASON SAHARA BUILDING NO 4 AND 5
SAMARTH SAI BUILDERS & DEVELOPERS
See every Thane project, with the district possession charts
Builder: SAMARTH SAI BUILDERS & DEVELOPERS
SAMARTH SAI BUILDERS & DEVELOPERS has 7 registrations on MahaRERA, including SEASONS SAHARA and SEASONS SAHARA BUILDING NO 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SEASON SAHARA BUILDING NO -6 is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SEASON SAHARA BUILDING NO -6?
The registered promoter entity is SAMARTH SAI BUILDERS & DEVELOPERS, a partnership as per the filing. Its GSTIN 27ACBFS0635A1ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SEASON SAHARA BUILDING NO -6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SEASON SAHARA BUILDING NO -6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SEASON SAHARA BUILDING NO -6?
The professionals named in the filing: Architect: DECON CONSULTANT; Engineer: ASN; Engineer: PRAVIN JAGTAP; Engineer: Associated structural engineers llp; Chartered Accountant: MUKESH GURANI; Chartered Accountant: pradeep bijlani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SEASON SAHARA BUILDING NO -6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback