ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SDPL Paradise II

Completed No litigation declared Residential / Group Housing project

SDPL Paradise II

By SANDEEP DWELLERS PVT. LTD.

RG-MH-01551 · RERA P50500006021 · Last updated on MahaRERA portal: 28 Mar 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 26 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 144 documents Report an error

SDPL Paradise II is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500006021 on 14 Aug 2017. The registration is recorded completed; possession was promised by 30 Dec 2023.

At a glance

Project

  • NameSDPL Paradise II
  • TypeResidential / Group Housing
  • Location
    • Dabha
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500006021
  • ReraGenie IDRG-MH-01551

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2017PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2017
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings1 building record
  • Documents filed144 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C WINGNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Mar 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

C WING: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 28 Mar 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Generator Back upYes100%
LiftYes100%
Security CCTV CameraYes100%

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered12
Open Space16

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,154 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2165.84
Proposed, not sanctioned2,166 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShriram Tower, Ground Floor, S V Patel Marg, Near NIT Building, Sadar, Nagpur

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnand Sarda
ArchitectRahul Agarwala
EngineerAman Kumar Singh
EngineerAshish Shiwarkar
Chartered AccountantBC BHARTIA
Chartered AccountantPARESH JAIRAM TANK & CO
Chartered AccountantBalkrishna Bhartia
Chartered AccountantParesh Tank
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 19 Mar 2024

Documents filed144

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 144 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Adobe Scan 28-Mar-2024.pdf28 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Paradise Wing C OC.pdf19 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - SDPL Paradise 2- Wing C- Dec23.pdf13 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - SDPL Paradise 2- Wing C- Dec23.pdf13 Jan 2024
Certificates of CA (Form 3)File: Engineer - SDPL Paradise 2- Wing C- Dec23.pdf13 Jan 2024
Certificates of CA (Form 3)File: CA - Paradise C - Dec23.pdf13 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Application - Paradise II.pdf29 Dec 2023
Certificates of CA (Form 3)File: SDPL Paradise 2 Wing -C_compressed.pdf14 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect- paradise 2- 30Sep23.pdf12 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - SDPL Paradise 2 Wing C- Sep 23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Paradise 2.pdf29 Sep 2023
Certificates of CA (Form 3)File: Paradise 2-C_compressed.pdf13 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect- SDPL Paradise 2- 30Jun23.pdf7 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - SP 2 - Cwing- 30Jun23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Paradise II - Supervisor - 31 March 23.pdf19 Jun 2023
Certificates of CA (Form 3)File: SDPL Paradise II C_compressed.pdf10 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Paradise 2- Wing C_compressed.pdf6 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Paradise 2- Wing C_compressed.pdf6 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - 2020 - Paradise II.pdf14 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: sdpl-paradise ll.pdf12 Jan 2023
Certificates of CA (Form 3)File: SDPL Paradise 2-C_compressed.pdf10 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SDPL Paradise 2_compressed.pdf5 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Paradise 2 Wing C.pdf5 Jan 2023
Certificates of CA (Form 3)File: SDPL Paradise2 wing C_compressed.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SDPL Paradise II_compressed.pdf8 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paradise -II_compressed.pdf7 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Paradise 2- wing C_compressed.pdf7 Oct 2022
Certificates of CA (Form 5)File: SDPL Paradise II_compressed.pdf27 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate -Paradise Wing C_compressed.pdf7 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Paradise -2_compressed.pdf7 Jul 2022
Certificates of CA (Form 3)File: Paradise 2_compressed.pdf7 Jul 2022
Certificates of CA (Form 3)File: SDPL paradise 2-c Cerificate.pdf11 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate SP2- C Wing_compressed.pdf7 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate SP-2 WING -C_compressed.pdf7 Apr 2022
Form 2AFile: Supervisor Certificate- Paradise_compressed.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inventory Paradise 2.pdf7 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paradise C_compressed.pdf6 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engi Para C_compressed.pdf6 Jan 2022
Certificates of CA (Form 3)File: SDPL Paradise c_compressed.pdf6 Jan 2022
Certificates of CA (Form 3)File: 20211101(2)_compressed.pdf8 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Paradise C.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Paradise C.pdf7 Oct 2021
Form 2AFile: Supervisor - Paradise II.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold unsold - Paradise II.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL PARADISE -II.pdf30 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Paradise II - Jun 21_compressed.pdf20 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Paradise II - Jun 21.pdf20 Jul 2021
Form 2AFile: SDPL PARADISE -SUPERVISOR .pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: Sold unsold - Paradise II - July 21.pdf20 Jul 2021
Certificates of CA (Form 3)File: SDPL Paradise II_compressed.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: Form 3A - Sold unsold - Paradise II - Mar 21.pdf26 May 2021
Certificates of CA (Form 3)File: Rear SDPL Paradise II.pdf12 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - paradise c - 31 mar 21.pdf8 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SDPL Paradise - C Wing.pdf8 Apr 2021
Form 2AFile: SDPL PARADISE -SUPERVISOR .pdf8 Apr 2021
Certificates of CA (Form 3)File: SDPL - PARADISE -II-min.pdf14 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: paradise c wing - architect - dec 20.pdf9 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: paradise 2- c wing - engineers.pdf9 Jan 2021
Form 2AFile: paradise c wing - supervisor- dec 20.pdf9 Jan 2021
Certificates of CA (Form 3)File: Paradise - CA Certificate - 30 Sept.pdf8 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: paradise - Architect- 30 Sept.pdf7 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Paradise - Engineer - 30 Sept.pdf7 Oct 2020
Form 2AFile: Pradise - Supervisor -30 Sept.pdf3 Oct 2020
Details of Restarting of Construction work post lockdownFile: SDPL Paradise-2.pdf18 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Paradise - 31 Dec 19.pdf6 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Paradise - 31 Dec 19.pdf6 Jan 2020
Form 2AFile: SDPL Paradise.pdf6 Jan 2020
Certificates of CA (Form 3)File: SDPL Paradise ll_compressed.pdf6 Jan 2020
Form 2AFile: paradise - supervisor.pdf7 Oct 2019
Certificates of CA (Form 3)File: RERA SDPL PARADISE II-min.pdf7 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: paradise architect 30 sep 19.pdf5 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: paradise engineers 30 sep 19.pdf5 Oct 2019
Certificates of CA (Form 5)File: sdpl-paradise ll.pdf28 Sep 2019
Details of encumbrancesFile: Paradise - encumbrances.pdf10 Jul 2019
Certificates of CA (Form 3)File: SDPL-PRRADISE II.pdf10 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Paradise II - Architect - 30 Jun 19.pdf6 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Paradise II - Engineer - 30 Jun 19.pdf6 Jul 2019
Form 2AFile: Paradise supervisor's certificate.pdf6 Jul 2019
OtherFile: Paradise II - GST old new rates - Declaration - May 19.pdf16 May 2019
OtherFile: Paradise II - GST old new rates - Declaration - May 19.pdf8 May 2019

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SDPL Paradise II on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dabha2,800+ in Nagpur

2 kmSDPL Paradise IICompleted 4Lapsed / revoked 6Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SDPL Paradise II is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SDPL Paradise II?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SDPL Paradise II?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SDPL Paradise II?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SDPL Paradise II?

The professionals named in the filing: Architect: Anand Sarda; Architect: Rahul Agarwala; Engineer: Aman Kumar Singh; Engineer: Ashish Shiwarkar; Chartered Accountant: BC BHARTIA; Chartered Accountant: PARESH JAIRAM TANK & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SDPL Paradise II?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SDPL Paradise II. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SDPL Paradise II to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.