Home / Browse projects / Nagpur, Maharashtra / SDPL Aashray Hazaripahad

Completed No litigation declared Residential / Group Housing project

SDPL Aashray Hazaripahad

By SANDEEP DWELLERS PVT. LTD.

RG-MH-02699 · RERA P50500026715 · Last updated on MahaRERA portal: 15 Oct 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Apr 2026Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
1Complaints at MahaRERAon this registration
Jump to the 85 documents Report an error

SDPL Aashray Hazaripahad is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500026715 on 21 Oct 2020. The registration is recorded completed; possession was promised by 30 Apr 2026. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSDPL Aashray Hazaripahad
  • TypeResidential / Group Housing
  • Location
    • Dabha Ring Road
    • Hazaripahad
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440007
  • Pincode440007
  • RERA no.P50500026715
  • ReraGenie IDRG-MH-02699

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredOct 2020PromisedApr 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on21 Oct 2020
  • Promised completion30 Apr 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed85 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 1NA80000
Wing 2NA80000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

Wing 1100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing 2100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities18

As on 15 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Security CCTV CameraYes100%
LiftYes100%
Generator Back upYes100%

Parking filed26

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots26
Closed/Covered26
BuildingClosed/CoveredTotal
Wing 11313
Wing 21313

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,434 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Gaurav AgrawalNagpur (M Corp.)Nagpur
Pravesh AgrawalNagpur (M Corp.)Nagpur

Approvals and building plan

Permissible FSI3772.97
Proposed, not sanctioned2,458 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGupta House, Civil Lines, Nagpur

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Agarwala
EngineerPrasanna Kulkarni
Chartered AccountantParesh Tank
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12603026SANDEEP DWELLERS PVT. LTD.Rohit Gaud22/05/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Oct 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Oct 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 15 Oct 2024

Documents filed85

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: SAH Form 4_merged_compressed.pdf15 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SAH Form 4_merged_compressed_removed.pdf15 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aashray Hazaripahad - Supervisor - 2024.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad_compressed.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad - Architect - 30Jun24.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad - Engineer - 30Jun24.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AASHRAY HAZARIPAHAD-I - CA Certificate - 31Mar24.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HAZARIPAHAD-I_Annexure - 31Mar24.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - SDPL Aashray Hazaripahad- Dec23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aashray Hazaripahad- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - SDPL AASHRAY HAZARIPAHAD- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad_compressed.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- Aashray Hazaripahad - 30Sep23.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aashray Hazaripahad - Sep 23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Aashray Hazaripahad.pdf26 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad _compressed.pdf13 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- SDPL Aashray Hazaripahad- 30Jun23.pdf7 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aashray Hazaripahad- 30Jun23.pdf7 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aashray Hazaripahad - Supervisor - 31 March 23.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashay Hazaripahad_compressed.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad_compressed.pdf6 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad_compressed.pdf6 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad_compressed.pdf10 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad_compressed.pdf5 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sdpl Aashray Hazaripahad.pdf5 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad_compressed.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SDPL Aashray Hazaripahad_compressed.pdf8 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad_compressed.pdf7 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad_compressed.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL Aashray Hazaripahad_compressed.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architectv certificate-Hazaripahad_compressed.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Hazaripahad_compressed.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aashray Hazaripahad_compressed.pdf7 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Ashray HajaripahadCertificate.pdf11 Apr 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Hazaripahad_compressed.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate -Hazaripahad_compressed.pdf7 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Supervisor Certificate - Hazaripahad_compressed.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: Inventory - Hazaripahad_compressed.pdf7 Apr 2022
Building plan approvalFile: SAH revised sanction_compressed.pdf20 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: SAH revised sanction_compressed.pdf20 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: DOC.pdf20 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: HAZARIPAHAD_compressed.pdf6 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Hazaripahad _compressed.pdf6 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engi Godhani_compressed.pdf6 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad_compressed.pdf6 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Godhani_compressed.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Aashray Hazaripahad.pdf7 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Aashray Hazaripahad.pdf7 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Supervisor - Aashray Hazaripahad.pdf7 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold unsold - Aashray Hazaipahad.pdf7 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL AASHRAY HAZARIPAHAD.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL HAZARIPAHAD.pdf30 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Hazaripahad - Jun 21.pdf20 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Hazaripahad - Jun 21.pdf20 Jul 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - Hazaripahad - Jun 21.pdf20 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - Hazaripahad - Jun 21_compressed.pdf20 Jul 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SDPL Aasrhray Hazaripahad -Supervisor .pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: Adobe Scan 20-Jul-2021 (1)_compressed.pdf20 Jul 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Hazaripahad_compressed.pdf20 Jul 2021
Disclosure of sold/ booked inventoryFile: Form 3A - Sold unsold - Hazaripahad - Mar 21.pdf27 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA HAZARIPAHAD_compressed.pdf12 Apr 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert-SDPL Aashray Hazaripahad.pdf8 Apr 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL OM -Engineer Certificate -min.pdf8 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SDPL Aasrhray Hazaripahad -Supervisor .pdf8 Apr 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: aashray hazaripahad.pdf14 Jan 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: aashray hazaripahad- architect- dec 20-compressed.pdf11 Jan 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aashray Hazarpahad -engineers-dec-20-compressed.pdf11 Jan 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: aashray hazaripahad - supervisor- dec 20.pdf11 Jan 2021
Layout approvalFile: Adobe Scan 16-Oct-2020 (3)_compressed.pdf16 Oct 2020
Building plan approvalFile: Building plan - 5.pdf16 Oct 2020
Building plan approvalFile: Building plan - 6.pdf16 Oct 2020
PAN CardFile: PAN Card- SDPL.pdf16 Oct 2020
Copy of the legal title reportFile: Title Certificate - Aashray Hazaripahad_compressed.pdf16 Oct 2020
Details of encumbrancesFile: Encumbrances - Undertaking- Hazaripahad.pdf16 Oct 2020
Copy of Layout Approval (in case of layout)File: Adobe Scan 16-Oct-2020 (3)_compressed.pdf16 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Building plan - 5.pdf16 Oct 2020
Building Plan Approval / NA Order for plotted developmentFile: Building plan - 6.pdf16 Oct 2020
Commencement Certificates / NA Order for plotted developmentFile: Adobe Scan 16-Oct-2020_compressed (1).pdf16 Oct 2020

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SDPL Aashray Hazaripahad on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hazaripahad2,800+ in Nagpur

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SDPL Aashray Hazaripahad is delayed beyond 30 Apr 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SDPL Aashray Hazaripahad?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SDPL Aashray Hazaripahad?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SDPL Aashray Hazaripahad?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SDPL Aashray Hazaripahad?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SDPL Aashray Hazaripahad?

The professionals named in the filing: Architect: Rahul Agarwala; Engineer: Prasanna Kulkarni; Chartered Accountant: Paresh Tank. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SDPL Aashray Hazaripahad?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SDPL Aashray Hazaripahad. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SDPL Aashray Hazaripahad to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.