Home / Browse projects / Nagpur, Maharashtra / VARAD ENCLAVE

Registered No litigation declared Residential / Group Housing project

VARAD ENCLAVE

By VARAD CONSTRUCTIONS

RG-MH-31715 · RERA P50500080050 · Last updated on MahaRERA portal: 29 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Nov 2029Possession promisedno revision filed
4 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 78%
75 of 84Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 52 documents Report an error

VARAD ENCLAVE is a Residential / Group Housing project by VARAD CONSTRUCTIONS in Nagpur, Maharashtra, registered with MahaRERA as P50500080050 on 21 Apr 2025. Possession is promised by 25 Nov 2029. 9 of the 84 units on this registration are recorded sold or booked, and 4 of 22 construction stages are filed complete.

At a glance

Project

  • NameVARAD ENCLAVE
  • TypeResidential / Group Housing
  • Location
    • PLOT NO 06 & 07
    • KHASRA NO 32/2
    • MOUZA HAJARIPAHAD
    • SARDA LAYOUT
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440007
  • Pincode440007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500080050
  • ReraGenie IDRG-MH-31715

Builder

  • NameVARAD CONSTRUCTIONS
  • Entity typePartnership

Key dates

this monthRegisteredApr 2025PromisedNov 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2025
  • Promised completion25 Nov 2029
  • Revised completionNone
  • Buildings2 building records
  • Documents filed52 files

Current status

11%9 of 84 units booked
10.6%Work done, per cost certificate

Figures as on 29 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA7748048
WING BNA7736036

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 29 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 78%.

WING A39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor78%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B39%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor78%
Slabs of Super Structure78%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises68%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 29 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed168

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots168
Closed/Covered124
Open Space44
BuildingClosed/CoveredOpen SpaceTotal
WING A732396
WING B512172

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,536 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025

Approvals and building plan

Sanctioning authorityNAGPUR IMPROVEMENT TRUST
Permissible FSI7295.79
Proposed, not sanctioned7,296 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Akarshan Busiplex, 26, Central Bazaar Road, Ramdaspeth, Nagpur Maharashtra.440010
Estimated costRs 30.00 cr
Cost incurredRs 3.18 cr
Work done10.6%
BuildingWingEstimatedIncurred
WING ANARs 17.14 crRs 1.82 cr
WING BNARs 12.86 crRs 1.36 cr

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYOGENDRA YADAV
EngineerMOHINI WANKHEDE
Chartered AccountantRANJEET MISHRA & COMPANY
PartnerRole in project
VARAD CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Apr 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 25 Nov 2029

Documents filed52

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate March 2026 Varad Enclave.pdf29 Apr 2026
Withdrawal Update Form 2File: Enginee Certificate March 2026 Varad Enclave.pdf29 Apr 2026
Withdrawal Update Form 3File: C A Certificate Varad Enclave March 2026.pdf29 Apr 2026
Withdrawal Update Form 1File: Architec Sep 2025.pdf24 Jan 2026
Withdrawal Update Form 1File: Architect Certificate Dec 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate September 2025.pdf24 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate December 2025.pdf24 Jan 2026
Withdrawal Update Form 3File: CA Certificate September 2025.pdf24 Jan 2026
Withdrawal Update Form 3File: CA Certificate For December 2025.pdf24 Jan 2026
Withdrawal Update Form 1File: Architect certificate updated.pdf11 Aug 2025
Withdrawal Update Form 1File: Architect certificate updated.pdf11 Aug 2025
Withdrawal Update Form 2File: Engineer certificate updated.pdf11 Aug 2025
Withdrawal Update Form 2File: Engineer certificate updated.pdf11 Aug 2025
Withdrawal Update Form 3File: CA Certificate udated_compressed.pdf11 Aug 2025
Withdrawal Update Form 3File: CA Certificate udated_compressed.pdf11 Aug 2025
Copy of the legal title reportFile: Title search report updated_compressed.pdf14 Apr 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B _compressed.pdf14 Apr 2025
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Certificate.pdf4 Apr 2025
Declaration about Commencement CertificateFile: Declaration about commencement certificte.pdf4 Apr 2025
CERSAI detailsFile: CRESAI report.pdf4 Apr 2025
Details of encumbrances concerned to LegalFile: Financial Encumbrance Certificate.pdf4 Apr 2025
Other - TechnicalFile: Annexure A.pdf4 Apr 2025
Other - TechnicalFile: Screenshot of Mail.pdf4 Apr 2025
Proforma of Allotment letterFile: Format of Allotment Letter.pdf20 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf20 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Mar 2025
Other - LegalFile: Sale Deed Plot No 06.pdf20 Mar 2025
Other - LegalFile: Sale Deed Plot No 07.pdf20 Mar 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A RERA designated Bank Account.pdf20 Mar 2025
Deviation Report with respect to Allotment letterFile: No Deviation with allotment letter.pdf20 Mar 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation Report for Agreement to Sale .pdf20 Mar 2025
Proforma of Agreement for saleFile: Format of Agreement to Sale.pdf20 Mar 2025
Layout approvalFile: Building Permit.pdf17 Mar 2025
Building plan approvalFile: SCAN Map 1.pdf17 Mar 2025
Building plan approvalFile: SCAN Map 2.pdf17 Mar 2025
Building plan approvalFile: SCAN Map 3.pdf17 Mar 2025
PAN CardFile: Firm PAN.pdf17 Mar 2025
Details of encumbrances concerned to FinanceFile: About Legal Encumbrances.pdf17 Mar 2025
Copy of Layout Approval (in case of layout)File: Building Permit.pdf17 Mar 2025
Declaration in FORM BFile: Affadavit in Form B.pdf17 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginrers certificate.pdf17 Mar 2025
Commencement Certificates / NA Order for plotted developmentFile: Building Permit.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: SCAN Map 1.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: SCAN Map 2.pdf17 Mar 2025
Building Plan Approval / NA Order for plotted developmentFile: SCAN Map 3.pdf17 Mar 2025
Details of encumbrances concerned to LegalFile: About Legal Encumbrances.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Ankit Sir.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Atul sir.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Deepak Sir.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Satish Sir.pdf17 Mar 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Shradha Madam.pdf17 Mar 2025
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure of Secured and unsecured loans.pdf17 Mar 2025

How this compares with Nagpur

11%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep VARAD ENCLAVE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SARDA LAYOUT2,800+ in Nagpur

2 kmVARAD ENCLAVECompleted 12Lapsed / revoked 5Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: VARAD CONSTRUCTIONS

VARAD CONSTRUCTIONS has 1 registration on MahaRERA, including VARAD ENCLAVE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if VARAD ENCLAVE is delayed beyond 25 Nov 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of VARAD ENCLAVE?

The registered promoter entity is VARAD CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in VARAD ENCLAVE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for VARAD ENCLAVE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at VARAD ENCLAVE?

The professionals named in the filing: Architect: YOGENDRA YADAV; Engineer: MOHINI WANKHEDE; Chartered Accountant: RANJEET MISHRA & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in VARAD ENCLAVE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About VARAD ENCLAVE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save VARAD ENCLAVE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.