ReraGenieLog inGet a buyer report

Home / Browse projects / Nagpur, Maharashtra / SDPL Aashray Hazaripahad III

Registered No litigation declared Residential / Group Housing project

SDPL Aashray Hazaripahad III

By SANDEEP DWELLERS PVT. LTD.

RG-MH-04071 · RERA P50500034184 · Last updated on MahaRERA portal: 10 Aug 2026

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Jul 2027Possession promisedmoved 4 months from the original
5 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 75%
116 of 132Units unsoldnot recorded sold or booked
1Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

SDPL Aashray Hazaripahad III is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500034184 on 25 Mar 2022. Possession is promised by 31 Jul 2027. The completion date has moved by 4 months from the original filing. 16 of the 132 units on this registration are recorded sold or booked, and 5 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.

At a glance

Project

  • NameSDPL Aashray Hazaripahad III
  • TypeResidential / Group Housing
  • Location
    • Dabha Ring road
    • Hazaripahad
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440007
  • Pincode440007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500034184
  • ReraGenie IDRG-MH-04071

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredMar 2022First promiseMar 2027Revised toJul 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Mar 2022
  • Promised completion31 Jul 2027
  • Revised completionRevised to 31 Jul 2027 (originally 31 Mar 2027)
  • Buildings2 building records
  • Documents filed86 files

Current status

12%16 of 132 units booked
30.4%Work done, per cost certificate

Figures as on 10 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing 6NA88561066
Wing 5NA88561066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 10 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 75%.

Wing 618%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing 538%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises38%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 10 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes25%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed44

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots44
Closed/Covered10
Open Space34
BuildingClosed/CoveredOpen SpaceTotal
Wing 651722
Wing 551722

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,478 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Jul 2025
LandownerVillageDistrict
Kunal AgarwalNagpur (M Corp.)Nagpur
Pravesh AgarwalNagpur (M Corp.)Nagpur

Approvals and building plan

Sanctioning authorityNagpur Improvement Trust
Permissible FSI3705.72
Proposed, not sanctioned3,706 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShankar nagar nagpur
Estimated costRs 12.93 cr
Cost incurredRs 3.94 cr
Work done30.45%
BuildingWingEstimatedIncurred
Wing 6NARs 5.88 crRs 88.13 lakh
Wing 5NARs 5.88 crRs 2.88 cr
-NARs 1.18 crRs 17.63 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Agarwala
EngineerPrasanna Kulkarni
Chartered AccountantParesh Tank
Chartered AccountantBC BHARTIA
Chartered AccountantAkshay Yawalkar
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P50500034184/WarMar 2027 → Jul 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12604545Kavita Nishchal DaharwalSANDEEP DWELLERS PVT. LTD.20/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Mar 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Mar 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Jul 2027

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: SAH III - Supervisor - Form 2A.pdf10 Aug 2026
Form 5 (FY 2024-2025)File: SAH-III- Form 5-2026.pdf6 Aug 2026
Form 5 (FY 2025-2026)File: SAH-III- Form 5-2026.pdf28 Jul 2026
Withdrawal Update Form 1File: SAH III - Architect - June 26.pdf21 Jul 2026
Withdrawal Update Form 2File: SAH III - Engineer - June 26.pdf21 Jul 2026
Withdrawal Update Form 3File: Hazaripahad 3 - CA - June 26.pdf21 Jul 2026
Withdrawal Update Form 1File: SAH III - Architect Form 1 - Mar 26.pdf18 Apr 2026
Withdrawal Update Form 2File: SAH III - Engineer Form 2 - Mar 26.pdf18 Apr 2026
Withdrawal Update Form 3File: SAH III - CA Form 3 - Mar 26.pdf18 Apr 2026
Withdrawal Update Form 1File: Aashray Hazaripahad III - Architect - Dec 25.pdf15 Jan 2026
Withdrawal Update Form 2File: Aashray Hazaripahad III - Engineer - Dec 25.pdf15 Jan 2026
Withdrawal Update Form 3File: Aashray Hazaripahad III - CA - Dec 25-compressed.pdf15 Jan 2026
Withdrawal Update Form 1File: ARC SDPL AASHRAY HAZARIPAHAD III-Oct25.pdf17 Oct 2025
Withdrawal Update Form 2File: ENG SDPL AASHRAY HAZARIPAHAD III-Oct25.pdf17 Oct 2025
Withdrawal Update Form 3File: CA SDPL AASHRAY HAZARIPAHAD III-Oct25.pdf17 Oct 2025
Form 2A (FY 2021-2022)File: SAH III - Form 2A.pdf23 Sep 2025
Form 2A (FY 2022-2023)File: SAH III - Form 2A.pdf23 Sep 2025
Form 2A (FY 2023-2024)File: SAH III - Form 2A.pdf23 Sep 2025
Form 2A (FY 2024-2025)File: SAH III - Form 2A.pdf23 Sep 2025
Withdrawal Update Form 1File: Aashray Hazaripahad 3-Architect-Jun25.pdf25 Jul 2025
Withdrawal Update Form 2File: Aashray Hazaripahad 3-Engineer-Jun25.pdf25 Jul 2025
Withdrawal Update Form 3File: Aashray Hazaripahad 3-CA-Jun25.pdf25 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aashray Hazaripahad 3- Architect - Mar 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aashray Hazaripahad 3 - CA - Mar 25-compressed.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aashray Hazaripahad 3- Engineer - Mar 25.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Aashray Hazaripahad 3- CA - Dec 24.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Aashray Hazaripahad 3- Architect - Dec 24.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aashray Hazaripahad 3- Engineer - Dec 24.pdf11 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SDPL Aashray Hazaripahjad 3-compressed.pdf18 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SDPL Aashray Hazaripahjad 3-compressed.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3_compressed.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aasharay Hazaripahad 3.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad 3.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aashray Hazaripahad III - Supervisor - 2024.pdf14 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3_compressed.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad 3 - Architect - 30Jun24.pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad 3 - Engineer - 30Jun24.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: AASHRAY HAZARIPAHAD-III - CA Certificate - 31Mar24.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: HAZARIPAHAD-III_Annexure - 31Mar24.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashary Hazaripahad 3.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad 3.pdf10 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - SDPL Aashray Hazaripahad 3- Dec23.pdf13 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aashray Hazaripahad 3- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - SDPL Aashray Hazaripahad -3- Dec23.pdf13 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3_compressed.pdf14 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- Aashray Hazaripahad 3- 30Sep23.pdf12 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aashray Hazaripahad 3- Sep 23.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDPL Aashray Hazaripahad 3.pdf26 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect- SDPL Aashray Hazaripahad 3- 30Jun23.pdf13 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer - SDPL Aashray Hazaripahad 3- 30Jun23.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3.pdf13 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Aashray Hazaripahad III - Supervisor - 31 March 23.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3_compressed.pdf10 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad-3_compressed.pdf6 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad-3_compressed.pdf6 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3_compressed.pdf10 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad 3_compressed.pdf5 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sdpl Aasray Hazaripaahad 3.pdf5 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hazaripahad 3_compressed.pdf8 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: SDPL Aashray Hazaripahad III_compressed.pdf8 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDPL Aashray Hazaripahad III_compressed.pdf7 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDPL Aashray Hazaripahad 3_compressed.pdf7 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SDPL Aashray Hazaripahad III_compressed.pdf27 Sep 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Hajaripahad III_compressed.pdf18 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SAH3_compressed.pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hajaripahad-3_compressed (1).pdf18 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDPL Aashray Hajaripahad-3_compressed (1).pdf11 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Hajaripahad III_compressed.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate SAH3_compressed.pdf7 Jul 2022
Layout approvalFile: Hazaripahad plot 1.pdf17 Mar 2022
Layout approvalFile: Hazaripahad plot 2.pdf17 Mar 2022
Building plan approvalFile: Plot 1 - Sanction Map.pdf17 Mar 2022
Building plan approvalFile: Plot 2 - Sanction Map .pdf17 Mar 2022
Copy of the legal title reportFile: SAH-plot no 1 and 2.pdf17 Mar 2022
Details of encumbrancesFile: Encumbrances - SAH III - 1 and 2.pdf17 Mar 2022
Copy of Layout Approval (in case of layout)File: Hazaripahad plot 1.pdf17 Mar 2022
Copy of Layout Approval (in case of layout)File: Hazaripahad plot 2.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Plot 1 - Sanction Map.pdf17 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Plot 2 - Sanction Map .pdf17 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: Plot 1 - Building Permit.pdf17 Mar 2022

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

12%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one moved by 4 months
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SDPL Aashray Hazaripahad III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hazaripahad2,800+ in Nagpur

2 kmSDPL Aashray HazaripahadCompleted 12Lapsed / revoked 5Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SDPL Aashray Hazaripahad III is delayed beyond 31 Jul 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SDPL Aashray Hazaripahad III?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SDPL Aashray Hazaripahad III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against SDPL Aashray Hazaripahad III?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for SDPL Aashray Hazaripahad III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SDPL Aashray Hazaripahad III?

The professionals named in the filing: Architect: Rahul Agarwala; Engineer: Prasanna Kulkarni; Chartered Accountant: Paresh Tank; Chartered Accountant: BC BHARTIA; Chartered Accountant: Akshay Yawalkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SDPL Aashray Hazaripahad III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SDPL Aashray Hazaripahad III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SDPL Aashray Hazaripahad III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.