Home / Browse projects / Nagpur, Maharashtra / SDPL Aashray Dabha

Completed No litigation declared Residential / Group Housing project

SDPL Aashray Dabha

By SANDEEP DWELLERS PVT. LTD.

RG-MH-00278 · RERA P50500014329 · Last updated on MahaRERA portal: 20 Jan 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 26 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Sep 2019Possession promisedregistration recorded completed
69 of 77Construction stages doneacross 7 buildings; furthest along: Installation of Lifts, 50%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SDPL Aashray Dabha is a Residential / Group Housing project by SANDEEP DWELLERS PVT. LTD. in Nagpur, Maharashtra, registered with MahaRERA as P50500014329 on 23 Nov 2017. The registration is recorded completed; possession was promised by 30 Sep 2019.

At a glance

Project

  • NameSDPL Aashray Dabha
  • TypeResidential / Group Housing
  • Location
    • Dabha
    • Nagpur (M Corp.)
    • Nagpur (Urban)
    • Nagpur
    • 440023
  • Pincode440023
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500014329
  • ReraGenie IDRG-MH-00278

Builder

  • NameSANDEEP DWELLERS PVT. LTD.
  • Entity typeCompany
  • CINU45200MH1990PTC058101
  • GSTIN27AACCS0133P1Z9
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • Managing DirectorASHOK SUBHASKUMAR AGARWALA
  • Other registrations26 more →
  • Completed13 of 27
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredNov 2017PromisedSep 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Nov 2017
  • Promised completion30 Sep 2019
  • Revised completionNone
  • Buildings7 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and MHADANA60000
Wing BNA60000
Wing CNA60000
Wing DNA60000
Wing ENA60000
Wing FNA60000
Wing M - MHADANA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 20 Jan 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

69 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Installation of Lifts, at 50%.

Wing A and MHADA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing C86%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
Wing D91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing E91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing F91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing M - MHADA91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 20 Jan 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Generator Back upYes100%
LiftYes100%
Security CCTV CameraYes100%
Society OfficeYes100%

Parking filed90

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots90
Closed/Covered90
BuildingClosed/CoveredTotal
Wing A and MHADA1515
Wing B1616
Wing C1414
Wing D1212
Wing E1111
Wing F1212
Wing M - MHADA1010

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,944 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI10416.87
Proposed, not sanctioned10,417 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishnu Vaibhav, 222, Palm Road, Civil Lines, Nagpur - 440001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Agarwala
EngineerPrasanna Kulkarni
Chartered AccountantParesh Tank
Chartered AccountantBalkrishna Bhartia
PartnerRole in project
SANDEEP DWELLERS PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Nov 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Nov 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Nov 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 9 Sep 2019

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: Completion - Aashray Dabha.pdf20 Jan 2023
Form 2AFile: Dabha - Supervisor - 25 Sept 19.pdf30 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aashray Dabha - Architect - 25 sept 19 - MIN.pdf28 Sep 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Aashray Dabha - engineer - 27 Sept 19 -MIN.pdf28 Sep 2019
Certificates of CA (Form 3)File: Aashray Dabha - CA - 27 Sept 19.pdf28 Sep 2019
Certificates of CA (Form 5)File: SDPL-Aashray Dabha.pdf28 Sep 2019
Status of Formation of Legal Entity (Society/Co Op etc.)File: Aashray Dabha - legal entity and conveyance.pdf28 Sep 2019
Status of ConveyanceFile: Aashray Dabha - legal entity and conveyance.pdf28 Sep 2019
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Aashray Dabha - Occupancy Certicate.pdf9 Sep 2019
Architect’s Certificate on Completion of Project (Form 4)File: Aashray Dabha - Architect Completion Certificate - Form 4-min.pdf9 Sep 2019
Certificates of CA (Form 3)File: SDPL AASHRAY DHABA_compressed.pdf10 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aashray - Architect - 30 June 19_compressed.pdf6 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: aashray - Engineer - 30 jun 19.pdf6 Jul 2019
Form 2AFile: Aashray - Architect - 30 June 19_compressed.pdf6 Jul 2019
OtherFile: Aashray dabha - OC Application.pdf27 May 2019
OtherFile: Release of flats - NIT.pdf17 May 2019
OtherFile: Aashray Dabha - GST old new rates - Declaration - May 19.pdf16 May 2019
OtherFile: Aashray Dabha - GST old new rates - Declaration - May 19.pdf8 May 2019
OtherFile: Aashray Dabha - Sanction maps displayed declaration.pdf19 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AASHRAY - ENGINEER - 31 MAR 19.pdf9 Apr 2019
Certificates of CA (Form 3)File: AASHRAY - ENGINEER - 31 MAR 19.pdf9 Apr 2019
Certificates of CA (Form 3)File: SDPL AASHRAY DABHA_0001-min_compressed.pdf8 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Aashray Dabha 31 mar 19.pdf5 Apr 2019
Form 2AFile: Supervisor - Aashray Dabha - 31 Mar 19.pdf5 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Aashray Dabha - 31 Dec 18.pdf12 Jan 2019
Form 2AFile: Supervisor - Aashray Dabha - 31 Dec 18.pdf12 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Dabha - 31 Dec 18.pdf9 Jan 2019
Certificates of CA (Form 3)File: CA Certificate - Aashray Dabha - 31 Dec 18.pdf9 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Aashray Dabha - 30 Sept 18.pdf3 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer - Aashray Dabha - 30 Sept 18.pdf3 Oct 2018
Certificates of CA (Form 3)File: CA - Aashray Dabha - 30 Sept 18.pdf3 Oct 2018
Certificates of CA (Form 5)File: Aashray Dabha - Statutory Auditor - Form 5 - 31 Mar 18.pdf29 Sep 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dabha - engineer.pdf28 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect - Aashray Dabha 31 mar 2018.pdf9 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dabha - Engineer- 31 mar 17.pdf9 Apr 2018
Certificates of CA (Form 3)File: Dabha CA - min.pdf9 Apr 2018
Details of encumbrancesFile: Encumbrances - underatking.pdf5 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SAA - Architect - Form 1 - 31 Dec 17.pdf5 Jan 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: SAA - Architect - Form 1 - 31 Dec 17.pdf5 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SAA - Engineer - Form 2 - 31 Dec 17.pdf5 Jan 2018
Certificates of CA (Form 3)File: SAA - CA - Form 3 - 31 Dec 17.pdf5 Jan 2018
Commencement Certificates / NA Order for plotted developmentFile: Building plan agreement.pdf10 Nov 2017
Layout approvalFile: Layout sanction.pdf9 Nov 2017
Building plan approvalFile: 1.pdf9 Nov 2017
Building plan approvalFile: 2.pdf9 Nov 2017
Building plan approvalFile: 3.pdf9 Nov 2017
Building plan approvalFile: 4.pdf9 Nov 2017
Building plan approvalFile: 5.pdf9 Nov 2017
Building plan approvalFile: 6.pdf9 Nov 2017
Building plan approvalFile: 7.pdf9 Nov 2017
Building plan approvalFile: 8.pdf9 Nov 2017
Details of encumbrancesFile: Encumbrances - Undertaking.pdf9 Nov 2017
Copy of Layout Approval (in case of layout)File: Layout sanction.pdf9 Nov 2017
Building Plan Approval (IOD)File: 1.pdf9 Nov 2017
Building Plan Approval (IOD)File: 2.pdf9 Nov 2017
Building Plan Approval (IOD)File: 3.pdf9 Nov 2017
Building Plan Approval (IOD)File: 4.pdf9 Nov 2017
Building Plan Approval (IOD)File: 5.pdf9 Nov 2017
Building Plan Approval (IOD)File: 6.pdf9 Nov 2017
Building Plan Approval (IOD)File: 7.pdf9 Nov 2017
Building Plan Approval (IOD)File: 8.pdf9 Nov 2017
Declaration in FORM BFile: Form B - Declaration - Aashray, Dabha.pdf9 Nov 2017
Certificates of CA (Form 3)File: Aashray Dabha - CA - Form 3.pdf9 Nov 2017
Proforma of Allotment letterFile: agreement to sell.pdf9 Nov 2017
Proforma of Allotment letterFile: Allotment letter.pdf9 Nov 2017
Copy of the legal title reportFile: Title Search Report.pdf25 Jul 2017
PAN CardFile: PAN Card- SDPL.pdf16 Jun 2017

Promoter's earlier projects5

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SDPL ClassicPlot no 35 Kh. No. 302 Chinchbhuvan Wardha Road Near Khapri Nagpur 44002543CompletedJun 2017Apr 2017
SDPL Greens Wing B and D and Convenience ShoppingKh No. 13-15 Opp. Star Motors Kamptee Road Nagpur 440026131CompletedMay 2017Nov 2016
SDPL Paradise Wing A and BBehind Water Tank Dabha Nagpur 44002372CompletedSep 2016Late, Oct 2016
Shree Swaminarayan EnclaveNext to Sadashiv Nagar Near Swaminarayan Temple Wathoda Nagpur 44000898CompletedDec 2014Late, Feb 2015
NILGIRIOpp. Transport Plaza Automotive Chowk Kamptee Road Nagpur 44002655CompletedSep 2014Late, Dec 2014

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SDPL Aashray Dabha on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dabha2,800+ in Nagpur

2 kmSDPL Aashray DabhaCompleted 4Lapsed / revoked 6Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 27 registered projects within 2 km.

Builder: SANDEEP DWELLERS PVT. LTD.

SANDEEP DWELLERS PVT. LTD. has 27 registrations on MahaRERA, including SDPL Aashray Dabha and SDPL Paradise II. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if SDPL Aashray Dabha is delayed beyond 30 Sep 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SDPL Aashray Dabha?

The registered promoter entity is SANDEEP DWELLERS PVT. LTD., a company as per the filing. Its CIN U45200MH1990PTC058101 and GSTIN 27AACCS0133P1Z9 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SDPL Aashray Dabha?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SDPL Aashray Dabha?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SDPL Aashray Dabha?

The professionals named in the filing: Architect: Rahul Agarwala; Engineer: Prasanna Kulkarni; Chartered Accountant: Paresh Tank; Chartered Accountant: Balkrishna Bhartia. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SDPL Aashray Dabha?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SDPL Aashray Dabha. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SDPL Aashray Dabha to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.