Home / Browse projects / Thane, Maharashtra / SD EMPIRE

Registration lapsed No litigation declared Others project

SD EMPIRE

By EMPIRE DEVELOPERS

RG-MH-30128 · RERA P51700029780 · Last updated on MahaRERA portal: 18 Feb 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
10 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 70%
20 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 39 documents Report an error

SD EMPIRE is a Others project by EMPIRE DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700029780 on 29 Jun 2021. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 27 of the 47 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameSD EMPIRE
  • TypeOthers
  • Location
    • PLOT NO. 78/1/3
    • VILLAGE KAUSA
    • MUMBRA
    • Thane (M Corp.)
    • Thane
    • 400612
  • Pincode400612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700029780
  • ReraGenie IDRG-MH-30128

Builder

  • NameEMPIRE DEVELOPERS
  • Entity typePartnership
  • PartnersUMAR SHAMSHAD USMANI, SALIM ABDUL MAJEED DHOLE
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects2 →

Key dates

16 months past promisethis monthRegisteredJun 2021PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jun 2021
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings2 building records
  • Documents filed39 files

Current status

57%27 of 47 units booked

Figures as on 18 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA15727633
BUILDING NO 2NA14714014

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 18 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 70%.

BUILDING NO 177%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.70%
BUILDING NO 273%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%

Progress on shared amenities15

As on 18 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed134

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots134
Closed/Covered26
Open Space108
BuildingClosed/CoveredOpen SpaceTotal
BUILDING NO 1147084
BUILDING NO 2123850

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,797 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI2985.3
Proposed, not sanctioned2,985 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 9 10, Gr Flr, Dost Apartment, Kausa Mumbra, Mumbai Pune Road, Thane, Maharashtra, 400612

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRIGHTANGLE ARCHITECT & INTERIOR DESIGNERS
EngineerSSCONS CONSULTING STRUCTURAL ENGINEERS
Chartered AccountantSHAIKH & ASSOCIATES
Chartered AccountantCHOUDHARI & ASSOCIATES
PartnerRole in project
EMPIRE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed39

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 1 Empire Developers 30-09-24.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form- 1 Empire Developers 31-12-24.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 - CA CERTIFICATE - SEP-2024.pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- CA CERTIFICATE - DEC-24.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Empire Developer 30-09-2024.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form- 2 Empire Developers 31-12-2024.pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-ARCHTECT CERTIFICATE -EMPIRE DEVELOPERS - 31032024.pdf28 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- ENGINEER CERTIFICATE - 31032024.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - 31032024.pdf28 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -ANNUAL REPORT - 31032024.pdf28 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SDEMPIRE -Form 1 - ARCHITECTS CERT -30092023_compressed.pdf10 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SDEMPIRE -Form 2 - ENGINEERS CERT -30092023.pdf10 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SDEMPIRE -Form 3 - CA CERTIFICATE - 30092023_compressed.pdf10 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: SDEMPIRE -Form 5 - ANNUAL REPORT - 2022-23.pdf10 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - 31122022 - RECT_compressed.pdf4 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - ENGINEEERS CERTIFICATE - 31122022_RECT.pdf4 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEEERS CERTIFICATE - 31122022.pdf23 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure sold inventory - 31122022.pdf23 Jan 2023
Proforma of Agreement for saleFile: Agreement to Sale.pdf23 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 EMPIRE DEVELOPERS - FY - 21-22.pdf21 Jan 2023
Declaration about Commencement CertificateFile: DECLARATION - FORMAT D - COOMENCEMENT CERTIFICATE.pdf22 Jun 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 - EMPIREDEVELOPERS - SDEMPIRE_compressed.pdf22 Jun 2021
Building plan approvalFile: Approved plan 1 of 2.pdf21 Jun 2021
Building plan approvalFile: Approved plan 2 of 2.pdf21 Jun 2021
Layout approvalFile: LAYOUT PLAN - SDEMPIRE.pdf21 Jun 2021
PAN CardFile: PAN CARD EMPIRE Developers.pdf21 Jun 2021
PAN CardFile: PAN - PARTNER - SALIM DHOLE.pdf21 Jun 2021
PAN CardFile: PAN - PARTNER - UMAR USMANI.pdf21 Jun 2021
Copy of the legal title reportFile: TITLE CERTIFICATE - ADV JAMSHED AZMI_compressed.pdf21 Jun 2021
Details of encumbrancesFile: FORM B DECLARATION -SD EMPPIRE.pdf21 Jun 2021
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN - SDEMPIRE.pdf21 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 1 of 2.pdf21 Jun 2021
Building Plan Approval / NA Order for plotted developmentFile: Approved plan 2 of 2.pdf21 Jun 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certifcate - SDEMPIRE_compressed.pdf21 Jun 2021
Declaration in FORM BFile: FORM B DECLARATION -SD EMPPIRE.pdf21 Jun 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - SDEMPIRE_compressed.pdf21 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Form 2 _ SD EMPIRE_compressed.pdf21 Jun 2021
Proforma of Allotment letterFile: Allotment Letter - SD EMPIRE.pdf21 Jun 2021
Proforma of Allotment letterFile: Empire Developers - Agreement for Sale.pdf21 Jun 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
DHOLE EMPIREDHOLE EMPIRE TALAOPALI ROAD NR SARANG HEIGHTS KAUSA MUMBRA 40061254CompletedAug 2019Jun 2018

How this compares with Thane

57%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SD EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MUMBRA7,600+ in Thane

2 kmSD EMPIRECompleted 30Lapsed / revoked 18Other 58Dot size: filed unitsN

Filed coordinates, straight-line distance. 106 registered projects within 2 km.

Builder: EMPIRE DEVELOPERS

Empire Developers has 6 registrations on MahaRERA, including Devakinagar and SD EMPIRE. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that SD EMPIRE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SD EMPIRE is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SD EMPIRE?

The registered promoter entity is EMPIRE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SD EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SD EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SD EMPIRE?

The professionals named in the filing: Architect: RIGHTANGLE ARCHITECT & INTERIOR DESIGNERS; Engineer: SSCONS CONSULTING STRUCTURAL ENGINEERS; Chartered Accountant: SHAIKH & ASSOCIATES; Chartered Accountant: CHOUDHARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SD EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SD EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SD EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.