Satvik Villa
By Mak Developers Through Damji Vasta Makwana
RG-MH-85384 · RERA P52100052821 · Last updated on MahaRERA portal: 12 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 6 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Satvik Villa is a Residential / Group Housing project by Mak Developers Through Damji Vasta Makwana in Pune, Maharashtra, registered with MahaRERA as P52100052821 on 5 Oct 2023. Possession was promised by 30 Apr 2026 and is now 6 months past that date. The completion date has moved by 12 months from the original filing. 9 of the 21 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameSatvik Villa
- TypeResidential / Group Housing
- Location
- Survey No.90
- Hissa No. 2/1B/9
- Baner
- Baner
- Haveli
- Pune
- 411045
- Pincode411045
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100052821
- ReraGenie IDRG-MH-85384
Builder
- NameMak Developers Through Damji Vasta Makwana
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on5 Oct 2023
- Promised completion30 Apr 2026
- Revised completionRevised to 30 Apr 2026 (originally 30 Apr 2025)
- Buildings1 building record
- Documents filed80 files
Current status
Figures as on 12 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Satvik Villa | NA | 8 | 7 | 21 | 0 | 21 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Satvik Villa: 64% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed53
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Satvik Villa | NA | Rs 2.25 cr | Rs 2.25 cr |
| - | NA | Rs 31.49 lakh | Rs 31.49 lakh |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Nilesh Saswade |
| Engineer | Rohinee Engineer |
| Engineer | Umesh Jadhav |
| Chartered Accountant | Chetan V Patel and Co. |
| Chartered Accountant | Pravin Pise |
| Chartered Accountant | Vaibhav S Bhise & Associates |
| Partner | Role in project |
|---|---|
| Mak Developers Through Damji Vasta Makwana | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter"The delay in the project’s timeline has been primarily due to unforeseen labor shortages and financial constraints. The shortage of skilled and unskilled labor, caused by challenges in recruitment and retention, has significantly slowed down the construction progress. Additionally, financial difficulties, including issues in securing adequate funding, rising material costs, and higher-than-expected interest rates on loans, have further impacted the project timeline. Despite these challenges, we are actively addressing the issues by streamlining operations, recruiting additional workers, and n
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Dec 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 6 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: Form 5-SATVIK VILLA (1).pdf | 12 May 2026 |
| Withdrawal Update Form 1File: Form 1 ss.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Form 1 ss.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: Form 2 s.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: Form 2 s.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 s.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 s.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: Form 1 ss.pdf | 6 May 2026 |
| Withdrawal Update Form 2File: Form 2 s.pdf | 6 May 2026 |
| Withdrawal Update Form 3File: Form 3 s.pdf | 6 May 2026 |
| Withdrawal Update Form 1File: Form 1 ss.pdf | 2 May 2026 |
| Withdrawal Update Form 2File: Form 2 s.pdf | 2 May 2026 |
| Withdrawal Update Form 3File: Form 3 s.pdf | 2 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 7 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 (2).pdf | 7 Feb 2026 |
| Withdrawal Update Form 3File: F3-SATVIK VILLA-Q3 (1).pdf | 7 Feb 2026 |
| Layout approvalFile: plan highlighted.pdf | 19 Dec 2025 |
| Form 2A (FY 2023-2024)File: 2A Satvik Villa 23-24.pdf | 1 Dec 2025 |
| Form 2A (FY 2024-2025)File: 2A Satvik Villa 24-25.pdf | 1 Dec 2025 |
| Form 2A (FY 2025-2026)File: 2A Satvik Villa 25-26.pdf | 1 Dec 2025 |
| Form 5 (FY 2024-2025)File: FORM-5 -RERA AUDIT (FY 24-25) (1).pdf | 26 Nov 2025 |
| Form 5 (FY 2023-2024)File: FORM-5 -RERA AUDIT (FY 23-24) (1).pdf | 26 Nov 2025 |
| Withdrawal Update Form 1File: form 1 (36).pdf | 22 Nov 2025 |
| Withdrawal Update Form 2File: form 2 (34).pdf | 22 Nov 2025 |
| Withdrawal Update Form 3File: form 3 (46).pdf | 22 Nov 2025 |
| Withdrawal Update Form 1File: form 1 (35).pdf | 16 Nov 2025 |
| Withdrawal Update Form 2 | 16 Nov 2025 |
| Withdrawal Update Form 3File: F3-SATVIK VILLA-JUNE-25.pdf | 16 Nov 2025 |
| Layout approvalFile: PMC - PLAN - 27-06-25 (2).pdf | 15 Nov 2025 |
| Form 1File: 1 (9).pdf | 5 Jun 2025 |
| Form 2File: 2 (1).pdf | 5 Jun 2025 |
| Form 3File: 3 (3).pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly Progress | 5 Jun 2025 |
| Form 1File: 1 (9).pdf | 5 Jun 2025 |
| Form 2File: 2 (1).pdf | 5 Jun 2025 |
| Form 3File: 3 (3).pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly Progress | 5 Jun 2025 |
| Form 1File: 1 (9).pdf | 5 Jun 2025 |
| Form 2File: 2 (1).pdf | 5 Jun 2025 |
| Form 3File: 3 (3).pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly Progress | 5 Jun 2025 |
| Form 1File: 1 (9).pdf | 5 Jun 2025 |
| Form 2File: 2 (1).pdf | 5 Jun 2025 |
| Form 3File: 3 (3).pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly Progress | 5 Jun 2025 |
| Form 1File: 1 (9).pdf | 5 Jun 2025 |
| Form 2File: 2 (1).pdf | 5 Jun 2025 |
| Form 3File: 3 (3).pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly Progress | 5 Jun 2025 |
| Form 1File: 1.pdf | 5 Jun 2025 |
| Form 2File: 2.pdf | 5 Jun 2025 |
| Form 3File: 3.pdf | 5 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: sold.pdf | 5 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: march 25 declaration .pdf | 5 Jun 2025 |
| Other - LegalFile: Sale Deed-1-25_compressed.pdf | 6 Sep 2023 |
| Other - LegalFile: Sale Deed-26-50_compressed.pdf | 6 Sep 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200276599118_For_Asset_Based_Search_05_08_2023_13_18_53_694 (1).pdf | 5 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate on Project 07 Sept 23.pdf | 5 Aug 2023 |
| Proforma of Allotment letterFile: GetUserDocumentFileContent (13) (1).pdf | 5 Aug 2023 |
| Proforma of Agreement for saleFile: GetUserDocumentFileContent.pdf | 5 Aug 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: GetUserDocumentFileContent11 (1).pdf | 5 Aug 2023 |
| Layout approvalFile: layout_compressed (2).pdf | 6 Jul 2023 |
| Building plan approvalFile: layout_compressed (2).pdf | 6 Jul 2023 |
| PAN CardFile: Damji V Makwana.pdf | 6 Jul 2023 |
| Copy of the legal title reportFile: Title Clearance Cert.pdf | 6 Jul 2023 |
| Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (1).pdf | 6 Jul 2023 |
| Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (1).pdf | 6 Jul 2023 |
| Copy of Layout Approval (in case of layout)File: layout_compressed (2).pdf | 6 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: layout_compressed (2).pdf | 6 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised cc.pdf | 6 Jul 2023 |
| Declaration about Commencement CertificateFile: Satvik Villa Declaration.pdf | 6 Jul 2023 |
| Declaration in FORM BFile: 1 Declaration in FORM B (1) (1).pdf | 6 Jul 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annuxure A.pdf | 6 Jul 2023 |
| Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (2) (1).pdf | 6 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (3) (1).pdf | 6 Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Satvik Villa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Baner13,700+ in Pune
Filed coordinates, straight-line distance. 294 registered projects within 2 km.
EARTH 1 BY VTP LUXE PHASE 1
MAHALUNGE REAL ESTATE DEVELOPERS PVT. LTD.
Godrej Meadows
Mahalunge Township Developers Private Limi
Godrej Green Vistas
Mahalunge Township Developers Private Limi
Godrej Hill Retreat
Mahalunge Township Developers Private Limi
Godrej Green Cove
Mahalunge Township Developers Private Limi
NYATI EMERALD I
NYATI BUILDERS PRIVATE LIMITED
Builder: Mak Developers Through Damji Vasta Makwana
Mak Developers Through Damji Vasta Makwana has 1 registration on MahaRERA, including Satvik Villa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Satvik Villa shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Satvik Villa is delayed beyond 30 Apr 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Satvik Villa?
The registered promoter entity is Mak Developers Through Damji Vasta Makwana, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Satvik Villa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Satvik Villa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Satvik Villa?
The professionals named in the filing: Architect: Nilesh Saswade; Engineer: Rohinee Engineer; Engineer: Umesh Jadhav; Chartered Accountant: Chetan V Patel and Co.; Chartered Accountant: Pravin Pise; Chartered Accountant: Vaibhav S Bhise & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Satvik Villa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.