Registered No litigation declared Plotted project

Satvam Hills B7

By SYMPHONY LANDMARKS LLP

RG-MH-98880 · RERA P52100053964 · Last updated on MahaRERA portal: 20 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 23 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 23 months from the original
1 of 7Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

Satvam Hills B7 is a Plotted project by SYMPHONY LANDMARKS LLP in Pune, Maharashtra, registered with MahaRERA as P52100053964 on 18 Dec 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 23 months from the original filing. 6 of the 7 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSatvam Hills B7
  • TypePlotted
  • Location
    • Paud Kolad Road
    • Paud
    • Jamgaon
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100053964
  • ReraGenie IDRG-MH-98880

Builder

  • NameSYMPHONY LANDMARKS LLP
  • Entity typeOthers
  • Named personsPARIMAL MADHUKAR PATIL, MANOJ BANSILAL BHATEWARA, AMOL VIJAY PIMPALKHARE, SACHIN GOVIND APTE
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023First promiseJan 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Jan 2025)
  • BuildingsNot stated in filing
  • Documents filed105 files

Current status

86%6 of 7 units booked
138.1%Work done, per cost certificate

Figures as on 20 Aug 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 20 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,013 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 May 2026
LandownerVillageDistrict
Symphony Landmarks LLPPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority (PMRDA)
Permissible FSI2013.41

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNavi Peth Pune 411030
Estimated costRs 1.30 cr
Cost incurredRs 1.79 cr
Work done138.05%
BuildingWingEstimatedIncurred
-NARs 1.30 crRs 1.79 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilip Kale
EngineerJitendra Borate
Chartered AccountantAmbar Naik
Chartered Accountantpriyesh jain
Chartered Accountantnilesh raut
PartnerRole in project
SYMPHONY LANDMARKS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28072621894Jan 2025 → Dec 2026

Reason as filed by the promoterWe are applying for Post Facto Extension (i.e., extension after receiving Completion Certificate) for our Project Completion Date with MahaRERA Authority, to extend proposed date of Completion for the Project from 31-01-2025 to Revised Completion Date of 31-12-2026. We have received OC on 24-02-2026 but we need to update a few details as per the completion plan, hence this declaration.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Feb 2025

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Arc cert_Satvam Hills B7_30June24.pdf20 Aug 2026
Withdrawal Update Form 1File: Arc cert_Satvam Hills B7_30June24.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30092025.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062026.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31122025.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 31032026.pdf20 Aug 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062026.pdf20 Aug 2026
Withdrawal Update Form 2File: Engg Cert_Satvam Hills B7_30June24.pdf20 Aug 2026
Withdrawal Update Form 2File: Engg Cert_Satvam Hills B7_30June24.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30092025.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062026.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062026.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 31032026.pdf20 Aug 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062026.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30092025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30092025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31122025.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 31032026.pdf20 Aug 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062026.pdf20 Aug 2026
Form 2A (FY 2025-2026)File: Form-2A 25-26.pdf20 Aug 2026
Form 2A (FY 2023-2024)File: Form-2A 2023-24.pdf28 Jul 2026
Form 2A (FY 2024-2025)File: Form-2A 2024-25.pdf28 Jul 2026
Form 1File: Form-1 Architect Certificate 31012025.pdf27 Jul 2026
Form 2File: Form-2 Engineer Certificate 31012025.pdf27 Jul 2026
Form 3File: Form-3 CA Certificate 31012025.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31012025.pdf27 Jul 2026
Form 1File: Form-1 Architect Certificate 30092024.pdf27 Jul 2026
Form 2File: Form-2 Engineer Certificate 30092024.pdf27 Jul 2026
Form 3File: Form-3 CA Certificate 30092024.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30092024.pdf27 Jul 2026
Form 1File: Form-1 Architect Certificate 30062024.pdf27 Jul 2026
Form 2File: Form-2 Engineer Certificate 30062024.pdf27 Jul 2026
Form 3File: Form-3 CA Certificate 30062024.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062024.pdf27 Jul 2026
Form 1File: Form-1 Architect Certificate 31032024.pdf27 Jul 2026
Form 2File: Form-2 Engineer Certificate 31032024.pdf27 Jul 2026
Form 3File: Form-3 CA Certificate 31032024.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31032024.pdf27 Jul 2026
Form 1File: Form-1 Architect Certificate 31122023.pdf27 Jul 2026
Form 2File: Form-2 Engineer Certificate 31122023 .pdf27 Jul 2026
Form 3File: Form-3 CA Certificate 31122023.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122023.pdf27 Jul 2026
Form 1File: Form-1 Architect Certificate 31122024.pdf27 Jul 2026
Form 2File: Form-2 Engineer Certificate 31122024.pdf27 Jul 2026
Form 3File: Form-3 CA Certificate 31122024.pdf27 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122024.pdf27 Jul 2026
Form 5 (FY 2024-2025)File: Form-5 2024-25.pdf27 Jul 2026
Form 5 (FY 2023-2024)File: Form-5 2023-24.pdf27 Jul 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Satvam Hills B7_Arc Completion Cert_11 feb25.pdf22 Feb 2025
Layout approvalFile: 2] GAT NO - 316 ABC - FINAL PLAN.pdf23 Dec 2024
Copy of Layout Approval (in case of layout)File: 2] GAT NO - 316 ABC - FINAL PLAN.pdf23 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Satvam Hills B7_Architect form 4.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1] GAT NO - 316 ABC - FINAL C C.pdf23 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_Satvam Hills B7_30Sept24.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_SATVAM HILLS B7_30Sept24.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_SATVAM HILLS B7_30Sept24.pdf21 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert_Satvam Hills B7_30Sept24.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills B7_30 Sept24.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills B7_30 Sept24.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc cert_Satvam Hills B7_30June24.pdf20 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert_Satvam Hills B7_30June24.pdf20 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert_Satvam Hill B7_30June24.pdf20 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Satvam Hills B7_Annual Report_2023-24.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills B7_31 Dec 23.pdf26 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills B7_31st March 24.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert_Satvam Hills B7_31Dec_23.pdf26 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert_Satvam Hills B7_31_March_24.pdf26 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_Satvam Hills B7_31dec23.pdf24 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15_3CA cert_Satvam Hills B7_31March24.pdf24 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: GAT NO - 316 ABC RENEWAL C C.pdf4 Dec 2023
Declaration about Commencement CertificateFile: FormatD_SatvamHills B7_Declaration about CC.pdf4 Dec 2023
CERSAI detailsFile: 03_Satvam Hills B7_CERSAI Search4Decemebr23.pdf4 Dec 2023

How this compares with Pune

86%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 23 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Satvam Hills B7 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Paud13,700+ in Pune

2 kmSatvam Hills B7Lapsed / revoked 2Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: SYMPHONY LANDMARKS LLP

SYMPHONY LANDMARKS LLP has 2 registrations on MahaRERA, including Satvam Hills B7 and Satvam Hills C4. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Satvam Hills B7 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Satvam Hills B7?

The registered promoter entity is SYMPHONY LANDMARKS LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Satvam Hills B7?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Satvam Hills B7?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Satvam Hills B7?

The professionals named in the filing: Architect: Dilip Kale; Engineer: Jitendra Borate; Chartered Accountant: Ambar Naik; Chartered Accountant: priyesh jain; Chartered Accountant: nilesh raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Satvam Hills B7?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Satvam Hills B7. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Satvam Hills B7 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.