Home / Browse projects / Pune, Maharashtra / Satvam Hills A4

Registration lapsed No litigation declared Plotted project

Satvam Hills A4

By SYNERGY PROPERTIES

RG-MH-90757 · RERA P52100052106 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 16 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2025Possession promised16 months past this date
0 of 7Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Satvam Hills A4 is a Plotted project by SYNERGY PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100052106 on 24 Jul 2023. Possession was promised by 30 Jun 2025 and is now 16 months past that date. 7 of the 7 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSatvam Hills A4
  • TypePlotted
  • Location
    • Paud Male Road
    • Paud road
    • Jamgaon
    • Mulshi
    • Pune
    • 412108
  • Pincode412108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100052106
  • ReraGenie IDRG-MH-90757

Builder

  • NameSYNERGY PROPERTIES
  • Entity typePartnership
  • PartnersMADHUKAR SHANKAR PATIL, RAHUL MADHUKAR PATIL
  • Other registrations10 more →
  • Completed2 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects8 →

Key dates

16 months past promisethis monthRegisteredJul 2023PromisedJun 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on24 Jul 2023
  • Promised completion30 Jun 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed95 files

Current status

100%7 of 7 units booked
111.1%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,434 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on23 Jun 2026
LandownerVillageDistrict
Synergy PropertiesPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority (PMRDA)
Permissible FSI3948.53
Proposed, not sanctioned3,949 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 1,IVORY TOWER PLOT NO 6 7 PRABHAT ROAD ERADAWANE PUNE MAHARASHTRA,PUNE,411004
Estimated costRs 86.20 lakh
Cost incurredRs 95.76 lakh
Work done111.09%
BuildingWingEstimatedIncurred
-NARs 86.20 lakhRs 95.76 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDilip G Kale & Associates
EngineerJitendra Borate
Chartered AccountantAmbar Naik & Associates
Chartered Accountantpriyesh jain
Chartered AccountantNilesh Raut
PartnerRole in project
SYNERGY PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Mar 2025

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form-1 Architect Certificate 20082023.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 20082023.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 30092023.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30092023.pdf13 Jul 2026
Form 1File: Form-1 Architect Certificate 20102023.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 20102023.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 31122023.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122023.pdf13 Jul 2026
Form 1File: Form-1 Architect Certificate 31032024.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 14052024.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 31032024.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31032024.pdf13 Jul 2026
Form 1File: Form-1 Architect Certificate 30062024.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 14052024.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 30062024.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30062024.pdf13 Jul 2026
Form 1File: Form-1 Architect Certificate 30092024.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 08082024.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 30092024.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 30092024.pdf13 Jul 2026
Form 1File: Form-1 Architect Certificate 31122024.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 31122024.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 31122024.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31122024.pdf13 Jul 2026
Form 1File: Form-1 Architect Certificate 30032025.pdf13 Jul 2026
Form 2File: Form-2 Engineer Certificate 31032025.pdf13 Jul 2026
Form 3File: Form-3 CA Certificate 31032025.pdf13 Jul 2026
Disclosure of Sold and Booked InventoryFile: Inventory Certificate 31032025.pdf13 Jul 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf13 Jul 2026
Withdrawal Update Form 1File: Form-1 Architect Certificate 30062025.pdf13 Jul 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf13 Jul 2026
Withdrawal Update Form 2File: Form-2 Engineer Certificate 30062025.pdf13 Jul 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf13 Jul 2026
Withdrawal Update Form 3File: Form-3 CA Certificate 30062025.pdf13 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A 31032024.pdf13 Jul 2026
Form 2A (FY 2024-2025)File: Form 2A 31032025.pdf13 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A 31032026.pdf13 Jul 2026
Form 5 (FY 2024-2025)File: Form-5 RERA Audit 24-25.pdf13 Jul 2026
Form 5 (FY 2025-2026)File: Form-5 RERA Audit 25-26.pdf13 Jul 2026
Other - TechnicalFile: Letter to RERA_317_318_compressed.pdf23 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Satvam Hills A4_Arc Completion Cert_11feb25.pdf8 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: Satvam Hills A4_Arc certificate_Form 4.pdf8 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Satvam Hills A4_Arc certificate_Form 4.pdf25 Dec 2024
Layout approvalFile: 2] GAT NO - 317 - FINAL PLAN.pdf23 Dec 2024
Copy of Layout Approval (in case of layout)File: 2] GAT NO - 317 - FINAL PLAN.pdf23 Dec 2024
Architect’s Certificate on Completion of Project (Form 4)File: Satvam Hills A4_Architect form 4.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Satvam Hills A4_Arc occupancy certificate.pdf23 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1] GAT NO - 317 FINAL C C.pdf23 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills A4_30June24.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills A4_30 Sept 24.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert_Satvam Hills A4_30June24.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 007_4 Eng Cert_Satvam Hills A4_30 Sept 2024.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert_Satvam Hills A4_30June24.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_SATVAM HILLS A4_30Sept24.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills A4_30June24.pdf20 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert_Satvam Hills A4_30 Sept 24.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA cert_Satvam Hills A4_30June24.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA_SATVAM HILLS A4_30Sept24.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert_Satvam Hills A4_30June24.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 007_4 Eng Cert_Satvam Hills A4_30 Sept 2024.pdf20 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SatvamHills A4_Annual Report_2023-24.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 011_4Arc Cert_Satvam Hills A4_March24.pdf18 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 007_3Eng_Cert_Satvam Hills A4_31March24.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 006_5CA cert_Satvam Hills A4_31st March 24.pdf18 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate_SatvamHills A4_31dec23.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc_Cert_Satvam Hills A4_30sept23.pdf7 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 007_2Eng_Cert_Satvam Hills A4_30Sept23.pdf27 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3rd_CA_Satvam Hills A4.pdf23 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc_Cert_Satvam Hills A4.pdf16 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 007_1Eng_cert_Satvam Hills A4.pdf16 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 006_2_CA_Cert_Satvam Hills A4.pdf9 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 006_2CA_ Cert_ Satvam Hills A4.pdf31 Aug 2023
Declaration about Commencement CertificateFile: 003_declaration about CC_Satvam Hills A4.pdf23 Jun 2023
Deviation Report with respect to model copy of AgreementFile: 005_Daviation to ATS_Satvam Hills A4.pdf23 Jun 2023
Copy of the legal title reportFile: 012_Title Search Report_Satvam Hills A4.pdf31 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: MSP_disclosure of interest.pdf26 May 2023
Details of encumbrances concerned to FinanceFile: Self declaration encumbrances _Gat 317.pdf24 May 2023
Details of encumbrances concerned to LegalFile: Self declaration encumbrances _Gat 317.pdf24 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: PMP_disclosure of interest.pdf24 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RMP_disclosure of interest.pdf24 May 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
NYATI EQUATORIAL PHASE IINEAR CRYSTAL HONDA SHOWROOM OFF BANGALORE MUMBAI HIGHWAY BAVDHAN PUNE 411021308CompletedMar 2017Mar 2017
NYATI EQUATORIAL PHASE INEAR CRYSTAL HONDA SHOWROOM OFF BANGALORE MUMBAI HIGHWAY BAVDHAN PUNE 411021258CompletedMar 2017Mar 2017
NYATI ESPLANADENEAR CRYSTAL HONDA SHOWROOM OFF BANGALORE MUMBAI HIGHWAY BAVDHAN PUNE 411021253CompletedDec 2012Dec 2012

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Satvam Hills A4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Paud road13,700+ in Pune

2 kmSatvam Hills A4Lapsed / revoked 2Other 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: SYNERGY PROPERTIES

Synergy Properties has 11 registrations on MahaRERA, including BOUGAIN VILLA - CLUSTER 3 and CASUARINA - CLUSTER C AND D. Its filings disclose 8 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that Satvam Hills A4 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Satvam Hills A4 is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Satvam Hills A4?

The registered promoter entity is SYNERGY PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Satvam Hills A4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Satvam Hills A4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Satvam Hills A4?

The professionals named in the filing: Architect: Dilip G Kale & Associates; Engineer: Jitendra Borate; Chartered Accountant: Ambar Naik & Associates; Chartered Accountant: priyesh jain; Chartered Accountant: Nilesh Raut. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Satvam Hills A4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Satvam Hills A4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Satvam Hills A4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.