Home / Browse projects / Pune, Maharashtra / Sarthak Aaradhana
Sarthak Aaradhana
RG-MH-51206 · RERA P52100050994 · Last updated on MahaRERA portal: 15 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sarthak Aaradhana is a Residential / Group Housing project by Sarthak Capital Housing in Pune, Maharashtra, registered with MahaRERA as P52100050994 on 19 May 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. 28 of the 28 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameSarthak Aaradhana
- TypeResidential / Group Housing
- Location
- Jeet Ground
- Loakmanya colony
- Kothrud
- Haveli
- Pune
- 411038
- Pincode411038
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100050994
- ReraGenie IDRG-MH-51206
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on19 May 2023
- Promised completion30 Jun 2026
- Revised completionNone
- Buildings1 building record
- Documents filed85 files
Current status
Figures as on 15 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sarthak Aaradhana | NA | 8 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Sarthak Aaradhana: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed32
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Aaradhana Apartment Condominium | Kothrud | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Sarthak Aaradhana | NA | Rs 10.43 cr | Rs 9.10 cr |
| - | NA | Rs 1.96 cr | Rs 1.14 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ashwini Pol |
| Engineer | Prashant Shrotri |
| Engineer | Merit Consultants |
| Chartered Accountant | Satish Aghav & Associates |
| Chartered Accountant | Kailash R Mundada and Co |
| Chartered Accountant | Aghav Wavhal & Associates |
| Partner | Role in project |
|---|---|
| Sarthak Capital Housing | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 4 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed85
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 85 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 3 Sarthak Aaradhana.......................pdf | 15 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A Sarthak Aaradhana.pdf | 15 Jul 2026 |
| Form 2A (FY 2026-2027)File: Form 3 Sarthak Aaradhana.....pdf | 15 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Sarthak Aaradhana.pdf | 11 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Sarthak Aaradhana .pdf | 11 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Sarthak Aaradhana .pdf | 11 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Architencts Certificate sarthak aaradhana.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate Sarthak Aaradnana.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 CA Certificate Sarthak Aaradhana.pdf | 21 Apr 2026 |
| Form 2A (FY 2024-2025)File: Form 2A Sarthak Aaradhana.pdf | 9 Feb 2026 |
| Form 5 (FY 2024-2025)File: Sarthak Aaradhana_Form 5_FY 2024-25.pdf | 26 Jan 2026 |
| Withdrawal Update Form 1File: From 1 Architects Certificate Sarthak Aaradhana.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Engineers Certificate Sarthak Aaradnana.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 C A Cartificate Sarthak Aaradhana.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 Oct 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Sarthak Aaradhana.pdf | 19 Oct 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 21 Jul 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 21 Jul 2025 |
| Withdrawal Update Form 3File: SA Form -3 Aaradhana.pdf | 21 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Sarhtak Aaradhana.pdf | 19 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Certificate Quality Assurance Sarthak Aaradhana.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM _3 Q 4 AAradhana.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: From 2 Engineers Certificate Aaradhana Site.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Unsold Inventory SA.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240717-FORM 1-ARCH-SARTHAK AARADHANA.pdf | 18 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Aaradhana 1st qtr.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aaradhana Form 2 1st qtr FY24-25.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory for RERA - Sarthak Aaradhana - 11-07-2024.pdf | 16 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Sarthak Aaradhana_Form 5_FY 23-24.pdf | 15 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Architects Certificate 02042024.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 SA-FORM 2-M24-17 04 2024.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 SARTHAK AARADHANA.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 240402182532_0001.pdf | 2 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate Final.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Form 2 Sarthak aaradhana.pdf | 19 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sarthak Aaradhana.pdf | 19 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Ac Declaration - Aaradhana (2).pdf | 22 Dec 2023 |
| Copy of the legal title reportFile: Supplementy Tital Report Sarthak aaradhana.pdf | 6 Nov 2023 |
| Layout approvalFile: 6 Revised Sanction Plan 1 of 2.pdf | 4 Nov 2023 |
| Building plan approvalFile: 7 Revised Sanction Plan 2 of 2.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: 3 Aaradhana Encumbrances Final.pdf | 4 Nov 2023 |
| Details of encumbrances concerned to LegalFile: 3 Aaradhana Encumbrances Final.pdf | 4 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: 6 Revised Sanction Plan 1 of 2.pdf | 4 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 Revised Sanction Plan 2 of 2.pdf | 4 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 5 Revised Commencement Certificate.pdf | 4 Nov 2023 |
| Declaration about Commencement CertificateFile: 5 Revised Format D declaration about CC.pdf | 4 Nov 2023 |
| CERSAI detailsFile: 8 Revised Cersai Declaration.pdf | 4 Nov 2023 |
| Proforma of Allotment letterFile: 4 Revised Final Allotment letter.pdf | 4 Nov 2023 |
| Proforma of Agreement for saleFile: 1 Revised Agreement For Sale.pdf | 4 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 (1).pdf | 19 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200283920647_For_Asset_Based_Search_18_10_2023_15_55_04_273.pdf | 19 Oct 2023 |
| CERSAI detailsFile: CERSAI_Search_Report_200283920647_For_Asset_Based_Search_18_10_2023_15_55_04_273.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: 231019181655_0001.pdf | 19 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Letter Legal 150523.pdf | 15 May 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Letter Legal 150523.pdf | 15 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of intrest on other real estate organizations Omkar Sir.pdf | 15 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other real estate org Vikram Sir.pdf | 15 May 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 12 May 2023 |
| Layout approvalFile: 5 - Sanction Plan 1.pdf | 8 May 2023 |
| Building plan approvalFile: 6 - Sanction Plan 1_.pdf | 8 May 2023 |
| Building plan approvalFile: 6A - Sanction Plan 2_.pdf | 8 May 2023 |
| PAN CardFile: 1 - Sarthak Capital Housing Pan Card.pdf | 8 May 2023 |
| Copy of the legal title reportFile: 2- Legal Report Format A 1mb.pdf | 8 May 2023 |
| Details of encumbrances concerned to FinanceFile: 3 - No Finance Encumbrance.pdf | 8 May 2023 |
| Details of encumbrances concerned to LegalFile: 3 - No Finance Encumbrance.pdf | 8 May 2023 |
| Copy of Layout Approval (in case of layout)File: 5 - Sanction Plan 1.pdf | 8 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 - Sanction Plan 1_.pdf | 8 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6A - Sanction Plan 2_.pdf | 8 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 11 - Commencement Certificate.pdf | 8 May 2023 |
| Declaration about Commencement CertificateFile: 12 - Declaration about CC.pdf | 8 May 2023 |
| Declaration in FORM BFile: 13A - Form B Promoter.pdf | 8 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 14 - Architects Certificate Form 1.pdf | 8 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 15 - Form 2.pdf | 8 May 2023 |
| CERSAI detailsFile: Declaration about cersai.pdf | 8 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Annexure D.pdf | 8 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 22A - Annexure A Vikram Sir.pdf | 8 May 2023 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SARTHAK BELVA | sr. no 32 hissa no 5A -2 Waghvasti Near Khadi Machine Chowk pisoli pune 411060 | 112 | Completed | Sep 2021 | Late, Mar 2022 |
| SARTHAK SHANTIBAN | Sr. No 43-59 Near Manaji Nagar Mitra Mandal Chowk Manaji Nagar Narhe Pune 411041 | 49 | Completed | Jul 2017 | Late, Dec 2017 |
| SARTHAK BEAULIEU | S.No.32 5A-2 Part Near Khadi Machine Chowk Pisoli Pune 411060 | 142 | Completed | Jun 2015 | Feb 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 85 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Sarthak Aaradhana on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Loakmanya colony13,700+ in Pune
Filed coordinates, straight-line distance. 287 registered projects within 2 km.
Pratik Nagar Palladio Kothrud Central
Vilas Javdekar Infinitee Developers Pvt. L
NEW FRIENDS
MAJESTIQUE DUROPOLIS PRIVATE LIMITED
SARVATRA CO-OP HSG SOCIETY LTD
Suryakant Kakade
Kshitij Residency
Yash Buildcon
MAYUK
MAYUR CORPORATION
Pune Baner Project-Tower 4 and 5
Goel Ganga Ventures India Private Limited
Builder: Sarthak Capital Housing
Sarthak Capital Housing has 2 registrations on MahaRERA, including Sarthak Aaradhana and Sarthak Sahayog. Its filings disclose 3 earlier MahaRERA projects: declares 1 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Sarthak Aaradhana shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sarthak Aaradhana is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sarthak Aaradhana?
The registered promoter entity is Sarthak Capital Housing, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sarthak Aaradhana?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Sarthak Aaradhana?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sarthak Aaradhana?
The professionals named in the filing: Architect: Ashwini Pol; Engineer: Prashant Shrotri; Engineer: Merit Consultants; Chartered Accountant: Satish Aghav & Associates; Chartered Accountant: Kailash R Mundada and Co; Chartered Accountant: Aghav Wavhal & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sarthak Aaradhana?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback