Home / Browse projects / Satara, Maharashtra / SARSVATI RESIDENCY

Registered No litigation declared Residential / Group Housing project

SARSVATI RESIDENCY

By NISHANT SHIVAJI MANE

RG-MH-26594 · RERA P52700015869 · Last updated on MahaRERA portal: 24 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 78 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedmoved 78 months from the original
11 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 90%
20 of 29Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

SARSVATI RESIDENCY is a Residential / Group Housing project by NISHANT SHIVAJI MANE in Satara, Maharashtra, registered with MahaRERA as P52700015869 on 28 Mar 2018. Possession is promised by 31 Mar 2027. The completion date has moved by 78 months from the original filing. 9 of the 29 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameSARSVATI RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • SANGAM NAGAR KHED
    • GOKARN NAGAR OPP SHREERAM FLOUR MILL
    • Khed (CT)
    • Satara
    • 415003
  • Pincode415003
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700015869
  • ReraGenie IDRG-MH-26594

Builder

  • NameNISHANT SHIVAJI MANE
  • Entity typeIndividual

Key dates

this monthRegisteredMar 2018First promiseSep 2020Revised toMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Mar 2018
  • Promised completion31 Mar 2027
  • Revised completionRevised to 31 Mar 2027 (originally 30 Sep 2020)
  • Buildings2 building records
  • Documents filed60 files

Current status

31%9 of 29 units booked

Figures as on 24 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA6529029
B WINGNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

A WING59%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B WING75%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes60%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes100%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
COMPOUND WALLYes100%
ENTRANCE GATEYes100%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area929 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityDistrict Magistrate
Permissible FSI1292.21
Proposed, not sanctioned1,292 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSATARA BRANCH, MAHARASHTRA - 415001

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVIKAS GHADGE & ASSOCIATES
EngineerSHREERAM ARVIND KULKARNI
EngineerPraful Jagdale
Chartered AccountantAgrawal Iyer and Associates LLP
Chartered AccountantDhiren Hargovindbhai Prajapati
PartnerRole in project
NISHANT SHIVAJI MANE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700008474Sep 2020 → Sep 2021

Reason as filed by the promoterDELAY DUE TO COVID-19 AS WORK WAS SHUTDOWN DUE TO LOCKDOWN AN UNAVAILIBILITY OF WORKERS

EXT52700019272Sep 2020 → Dec 2025

Reason as filed by the promoterDUE TO CONTINUE LOCKDOWN IN SATARA WHICH IS MY SITE ADDRESS ALL WORK HAS BEEN STOPPED DUE TO UNAVAILABITY OF WORKERS.FROM JANUARY 2021

EA07052620869Sep 2020 → Mar 2027

Reason as filed by the promoterDue to death of the original promoter in 02-February-2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Mar 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Mar 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Mar 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Mar 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form1 300925.pdf24 Apr 2026
Form 2File: Form-2 Engineers Certificate 30-09-2025.pdf24 Apr 2026
Form 3File: Form 3-30092025.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: 300925 Disclosure of Sold or Booked Inventory.pdf24 Apr 2026
Form 1File: Form1 311225.pdf24 Apr 2026
Form 2File: Form-2 Engineers Certificate 31-12-2025.pdf24 Apr 2026
Form 3File: Form 3-31122025.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: 311225 Disclosure of Sold or Booked Inventory.pdf24 Apr 2026
Form 2A (FY 2025-2026)File: Form2A 2526.pdf24 Apr 2026
Form 5 (FY 2024-2025)File: FORM 5 31032025.pdf17 Apr 2026
Form 2A (FY 2024-2025)File: Form-2A-March 25.pdf20 Mar 2026
Form 2A (FY 2023-2024)File: Form-2A-March 24.pdf20 Mar 2026
Form 1File: Form-1 Architect Certificate.pdf12 Mar 2026
Form 2File: Form-2 Engineer Certificate.pdf12 Mar 2026
Form 3File: Form 3_30062025.pdf12 Mar 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold or Booked Inventory.pdf12 Mar 2026
Form 5 (FY 2023-2024)File: FORM 5 31032024.pdf12 Mar 2026
Form 5 (FY 2022-2023)File: FORM 5 31032023.pdf12 Mar 2026
Form 5 (FY 2021-2022)File: FORM 5 31032022.pdf12 Mar 2026
Form 5 (FY 2020-2021)File: FORM 5 31032021.pdf12 Mar 2026
Form 5 (FY 2019-2020)File: FORM 5 31032020 .pdf12 Mar 2026
Form 5 (FY 2018-2019)File: FORM 5 31032019.pdf12 Mar 2026
Form 5 (FY 2017-2018)File: Form 5 31032018.PDF12 Mar 2026
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE.PDF11 Mar 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE.PDF11 Mar 2024
Declaration about Commencement CertificateFile: DEC CC.PDF11 Mar 2024
Declaration in FORM BFile: FORM B.PDF11 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH.PDF11 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.PDF11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A 19-20.PDF11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A 20-21.PDF11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A 21-22.PDF11 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A 22-23.PDF11 Mar 2024
CERSAI detailsFile: CERSAI.PDF11 Mar 2024
Disclosure of sold/ booked inventoryFile: SOLD.PDF11 Mar 2024
Certificates of CA (Form 3)File: CA.PDF11 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: INTEREST.PDF11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 18-19.PDF11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 2A 19-20.PDF11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.PDF11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.PDF11 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-23.PDF11 Mar 2024
Proforma of Allotment letterFile: ALLOTMENT LETTRE.PDF11 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK.PDF11 Mar 2024
Deviation Report with respect to Allotment letterFile: DEV ALLOTMENT.PDF11 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEV AGREEMENT.PDF11 Mar 2024
Certificates of CA (Form 5)File: Form 5 (FY 2017-18).PDF26 Dec 2018
Building plan approvalFile: Building Plan Approval.pdf21 Mar 2018
Layout approvalFile: Layout Approval.pdf21 Mar 2018
Copy of Layout Approval (in case of layout)File: Layout Approval.pdf21 Mar 2018
Building Plan Approval (IOD)File: Building Plan Approval.pdf21 Mar 2018
Certificates of CA (Form 3)File: CA Cerrtificate Form 3.pdf21 Mar 2018
PAN CardFile: 2 PAN CARD - NISHANT MANE.pdf20 Mar 2018
Copy of the legal title reportFile: Legal Title report.pdf20 Mar 2018
Details of encumbrancesFile: 5 Details of Ebcumbrances.pdf20 Mar 2018
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certitifcate.pdf20 Mar 2018
Declaration in FORM BFile: 1 Form B Affidavit Cum Declaration.pdf20 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Architech Certificate Form 1.pdf20 Mar 2018
Proforma of Allotment letterFile: 12 Draft Allotment Letter Sale Deed.pdf20 Mar 2018
Status of Formation of Legal EntityFile: 3 GST Certificate.pdf20 Mar 2018

How this compares with Satara

31%of this project is bookeddistrict median 15%
16%of Satara projects moved their completion datethis one moved by 78 months
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SARSVATI RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GOKARN NAGAR OPP SHREERAM FLOUR MILL1,100+ in Satara

2 kmSARSVATI RESIDENCYCompleted 9Lapsed / revoked 5Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 38 registered projects within 2 km.

Builder: NISHANT SHIVAJI MANE

NISHANT SHIVAJI MANE has 1 registration on MahaRERA, including SARSVATI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if SARSVATI RESIDENCY is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARSVATI RESIDENCY?

The registered promoter entity is NISHANT SHIVAJI MANE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARSVATI RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARSVATI RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARSVATI RESIDENCY?

The professionals named in the filing: Architect: VIKAS GHADGE & ASSOCIATES; Engineer: SHREERAM ARVIND KULKARNI; Engineer: Praful Jagdale; Chartered Accountant: Agrawal Iyer and Associates LLP; Chartered Accountant: Dhiren Hargovindbhai Prajapati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARSVATI RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARSVATI RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARSVATI RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.