Home / Browse projects / Pune, Maharashtra / Sarita Niketan

Registered No litigation declared Residential / Group Housing project

Sarita Niketan

By Manjari Housing Projects LLP

RG-MH-31589 · RERA P52100079924 · Last updated on MahaRERA portal: 26 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 64%
476 of 476Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

Sarita Niketan is a Residential / Group Housing project by Manjari Housing Projects LLP in Pune, Maharashtra, registered with MahaRERA as P52100079924 on 1 Apr 2025. Possession is promised by 15 Dec 2028. The completion date has moved by 12 months from the original filing. 0 of the 476 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSarita Niketan
  • TypeResidential / Group Housing
  • Location
    • Off 30 meters RP road (Kharadi-Wagholi-Manjari road)
    • Manjari-Khurd
    • MANJARI KH
    • Haveli
    • Pune
    • 412307
  • Pincode412307
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079924
  • ReraGenie IDRG-MH-31589

Builder

  • NameManjari Housing Projects LLP
  • Entity typeOthers
  • Other registrations8 more →
  • Completed1 of 9
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects7 →

Key dates

this monthRegisteredApr 2025First promiseDec 2027Revised toDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Apr 2025
  • Promised completion15 Dec 2028
  • Revised completionRevised to 15 Dec 2028 (originally 31 Dec 2027)
  • Buildings1 building record
  • Documents filed80 files

Current status

0%0 of 476 units booked
30.3%Work done, per cost certificate

Figures as on 26 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Social Housing Building - Sarita NiketanNA25224760476

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 64%.

Social Housing Building - Sarita Niketan: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure64%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises17%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1790

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1,790
Closed/Covered1,129
Open Space661

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,202 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPune Metropolitan Region Development Authority
Permissible FSI24375.16
Proposed, not sanctioned24,375 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Shop No. 7,8,9 & 10, Empire Square, City Survey No. 4746, Next to Auto Cluster, Off Pune Mumbai Highway, Chinchwad, Pune, Maharashtra - 411019
Estimated costRs 98.94 cr
Cost incurredRs 29.97 cr
Work done30.29%
BuildingWingEstimatedIncurred
Social Housing Building - Sarita NiketanNARs 96.93 crRs 29.97 cr
-NARs 2.01 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK Architects
ArchitectANA Consortium Pvt Ltd
EngineerSTS Consultants
EngineerMangesh Avinash Lawand
EngineerSiddheshwar Hipparge
Chartered AccountantMD Deshpande & Co
Chartered AccountantP Gandhi & Co
PartnerRole in project
Manjari Housing Projects LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA10012619392Dec 2027 → Dec 2028

Reason as filed by the promoterThe project consist of 1 sanctioned building with 25 sanctioned floors. The project is presently in its execution stage of completion. We are currently engaged in completing RCC works. The delay in completing the RCC works has been caused by various factors. These factors had a cascading effect on the commencement of the finishing activities of lower floors. d. The situation remained difficult despite our best efforts to address these problems, such as our attempt to retain labour on-site. Now that the RCC activities have started to be executed in a timely fashion we are optimistic that we wou

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Aug 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Aug 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 15 Dec 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate Sarita Niketan R9 (23-07-2026).pdf26 Jul 2026
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf26 Jul 2026
Withdrawal Update Form 3File: EWS.pdf26 Jul 2026
Withdrawal Update Form 1File: Sarita Niketan.pdf23 Apr 2026
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf23 Apr 2026
Withdrawal Update Form 3File: Sarita Niketan.pdf23 Apr 2026
Form 2A (FY 2025-2026)File: EWS- Quality Assurance Certificate - Q4 - March 2026.pdf23 Apr 2026
Withdrawal Update Form 1File: Form 1_EWS.pdf20 Jan 2026
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf20 Jan 2026
Withdrawal Update Form 3File: EWS.pdf20 Jan 2026
Withdrawal Update Form 1File: EWS - Sarita Niketan.pdf17 Oct 2025
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf17 Oct 2025
Withdrawal Update Form 3File: MDD_Sarita Niketan_RERA_September_2025_Signed.pdf17 Oct 2025
Withdrawal Update Form 1File: EWS.pdf7 Oct 2025
Withdrawal Update Form 1File: EWS.pdf7 Oct 2025
Withdrawal Update Form 1File: EWS.pdf7 Oct 2025
Withdrawal Update Form 1File: EWS.pdf7 Oct 2025
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf7 Oct 2025
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf7 Oct 2025
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf7 Oct 2025
Withdrawal Update Form 2File: EWS Sarita Niketan.pdf7 Oct 2025
Withdrawal Update Form 3File: EWS.pdf7 Oct 2025
Withdrawal Update Form 3File: EWS.pdf7 Oct 2025
Withdrawal Update Form 3File: EWS.pdf7 Oct 2025
Withdrawal Update Form 3File: EWS.pdf7 Oct 2025
Commencement Certificates / NA Order for plotted developmentFile: Updated Annexure F.pdf28 Mar 2025
Declaration about Commencement CertificateFile: Draft Format D.pdf28 Mar 2025
Other - FinanceFile: EWS survey number marked on PLU.pdf28 Mar 2025
Other - FinanceFile: Naredco Certificate 1.pdf9 Jan 2025
Other - FinanceFile: Response to MahaRERA_Desk 1.pdf9 Jan 2025
Proforma of Allotment letterFile: Draft Allotment Letter_29112024.pdf16 Dec 2024
Other - LegalFile: Draft Application Form_13122024.pdf16 Dec 2024
Other - LegalFile: Draft Application Form_13122024.pdf16 Dec 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment-EWS Manjari.pdf16 Dec 2024
Other - TechnicalFile: Annexure A_Declaration cum Understanding_16122024.pdf16 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviaton AFS-EWS Manjari-pages-1.pdf16 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviaton AFS-EWS Manjari-pages-2.pdf16 Dec 2024
Proforma of Agreement for saleFile: Draft AFS_13122024-with common area annexures.pdf16 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Abhishek Sahaya.pdf16 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Subhasish Pattanaik.pdf16 Dec 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance Draft_Charu.pdf13 Dec 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Draft_Charu.pdf13 Dec 2024
Declaration in FORM BFile: Form B_Declaration_Charu.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 241203 - RERA Certificatedvfv (1)gh.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: EWS signed certificate new 9 Dec 24.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SARITA NIKETAN EWS 06-12R1.pdf13 Dec 2024
CERSAI detailsFile: Merged CERSAI.pdf13 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A Bank Account Draft_Charu.pdf13 Dec 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrance Draft_Charu.pdf13 Dec 2024
Details of encumbrances concerned to LegalFile: Legal Encumbrance Draft_Charu.pdf13 Dec 2024
Other - TechnicalFile: FSI Declaration Draft_Charu.pdf13 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Updated Format B.pdf13 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Merged Disclosure Document.pdf13 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Ashok Dhanraj Chordia.pdf13 Aug 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest_Atul Ashok Chordia.pdf13 Aug 2024
Building plan approvalFile: Annexure E - Plot, Parking marked.pdf12 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Annexure E - Plot, Parking marked.pdf12 Aug 2024
Layout approvalFile: annexure A - Said Land Plot Boundary.pdf9 Aug 2024
Building plan approvalFile: Building Plan Approval-compressed.pdf9 Aug 2024
Building plan approvalFile: Floor Plans Part 1.pdf9 Aug 2024
Building plan approvalFile: Floor Plans Part 2-compressed.pdf9 Aug 2024
Building plan approvalFile: Floor Plans Part 3-compressed.pdf9 Aug 2024
Building plan approvalFile: Floor Plans Part 4-compressed.pdf9 Aug 2024
Building plan approvalFile: Floor Plans Part 5-compressed.pdf9 Aug 2024
PAN CardFile: PAN Card.pdf9 Aug 2024
Copy of the legal title reportFile: MahaRERA-Legal Title Report-Majari-20-06-2024.pdf9 Aug 2024
Copy of the legal title reportFile: MahaRERA-Aninexure A_Compressed_Part1.pdf9 Aug 2024
Copy of the legal title reportFile: MahaRERA-Aninexure A_Compressed_Part2.pdf9 Aug 2024
Copy of the legal title reportFile: MahaRERA-Aninexure B -20-06-2024.pdf9 Aug 2024
Copy of the legal title reportFile: MahaRERA-Aninexure C -20-06-2024.pdf9 Aug 2024
Copy of Layout Approval (in case of layout)File: annexure A - Said Land Plot Boundary.pdf9 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-compressed.pdf9 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Building Plan Approval-compressed.pdf9 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plans Part 1.pdf9 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plans Part 2-compressed.pdf9 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plans Part 3-compressed.pdf9 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plans Part 4-compressed.pdf9 Aug 2024
Building Plan Approval / NA Order for plotted developmentFile: Floor Plans Part 5-compressed.pdf9 Aug 2024
Other - LegalFile: Merged Conveyance Document-compressed.pdf9 Aug 2024
Other - LegalFile: Merged Satbara_159 and 160.pdf9 Aug 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date
ProjectLocationFlatsStatusPromisedDelivered
Godrej Sky Greens Phase 2Sec 5 Gat no 141P 142P 146P Manjari Khurd off Awhalwadi road Taluka Haveli Pune 412307320OngoingMar 2026Not delivered

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 12 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Sarita Niketan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Manjari-Khurd13,700+ in Pune

2 kmSarita NiketanCompleted 7Lapsed / revoked 4Other 24Dot size: filed unitsN

Filed coordinates, straight-line distance. 35 registered projects within 2 km.

Builder: Manjari Housing Projects LLP

Manjari Housing Projects LLP has 9 registrations on MahaRERA, including GODREJ BOULEVARD and Godrej Park Springs. Its filings disclose 7 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Sarita Niketan is delayed beyond 15 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Sarita Niketan?

The registered promoter entity is Manjari Housing Projects LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Sarita Niketan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Sarita Niketan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Sarita Niketan?

The professionals named in the filing: Architect: VK Architects; Architect: ANA Consortium Pvt Ltd; Engineer: STS Consultants; Engineer: Mangesh Avinash Lawand; Engineer: Siddheshwar Hipparge; Chartered Accountant: MD Deshpande & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Sarita Niketan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Sarita Niketan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Sarita Niketan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.