Home / Browse projects / Nagpur, Maharashtra / SARASWATI NAGARI 6

Registration lapsed No litigation declared Plotted project

SARASWATI NAGARI 6

By NADEEM ANWAR ABDUL SHAKUR

RG-MH-07634 · RERA P50500034695 · Last updated on MahaRERA portal: 11 May 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
58 of 58Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

SARASWATI NAGARI 6 is a Plotted project by NADEEM ANWAR ABDUL SHAKUR in Nagpur, Maharashtra, registered with MahaRERA as P50500034695 on 20 Apr 2022. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 0 of the 58 units on this registration are recorded sold or booked.

At a glance

Project

  • NameSARASWATI NAGARI 6
  • TypePlotted
  • Location
    • KH. NO. 64/1
    • P.H NO. 12A
    • Lonara
    • Nagpur (Rural)
    • Nagpur
    • 441111
  • Pincode441111
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500034695
  • ReraGenie IDRG-MH-07634

Builder

  • NameNADEEM ANWAR ABDUL SHAKUR
  • Entity typeIndividual

Key dates

7 months past promisethis monthRegisteredApr 2022PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on20 Apr 2022
  • Promised completion31 Mar 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed132 files

Current status

0%0 of 58 units booked
65.6%Work done, per cost certificate

Figures as on 11 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 11 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes85%
Street LightingYes95%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area14,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Metropolitain Region Development Authority
Permissible FSI14200.0
Proposed, not sanctioned14,200 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLR DHINGRA ENCLAVE BORNALA FARAS OPP FIRING RANGE KATOL RD TALUKA AND DIST NAGPUR 440013
Estimated costRs 2.66 cr
Cost incurredRs 1.74 cr
Work done65.57%
BuildingWingEstimatedIncurred
-NARs 2.66 crRs 1.74 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPAWAN GUPTA
EngineerAHMAD KASHIF IQBAL
Chartered AccountantMJM Associates
Chartered AccountantPriyanka Parse
PartnerRole in project
NADEEM ANWAR ABDUL SHAKUR-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Apr 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: saraswati nagri 6 form 1.pdf11 May 2026
Withdrawal Update Form 1File: saraswati nagri 6 form 1.pdf11 May 2026
Withdrawal Update Form 1File: saraswati nagri 6 form 1.pdf11 May 2026
Withdrawal Update Form 1File: saraswati nagri 6 form 1.pdf11 May 2026
Withdrawal Update Form 2File: saraswati nagri 6 form 2.pdf11 May 2026
Withdrawal Update Form 2File: saraswati nagri 6 form 2.pdf11 May 2026
Withdrawal Update Form 2File: saraswati nagri 6 form 2.pdf11 May 2026
Withdrawal Update Form 2File: saraswati nagri 6 form 2.pdf11 May 2026
Withdrawal Update Form 3File: saraswati nagri 6 form 3.pdf11 May 2026
Withdrawal Update Form 3File: saraswati nagri 6 form 3.pdf11 May 2026
Withdrawal Update Form 3File: saraswati nagri 6 form 3.pdf11 May 2026
Withdrawal Update Form 3File: saraswati nagri 6 form 3.pdf11 May 2026
Form 1File: Form 1 , 1-3 2024 saraswati nagari 6.pdf8 Oct 2025
Form 2File: Form 2 , 1-3 2024 saraswati nagari 6.pdf8 Oct 2025
Form 3File: Form 3 , 1-3 2024 saraswati nagari 6.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 1-3 2024 saraswati nagari 6.pdf8 Oct 2025
Form 1File: Form 1 , 4-6 2024 saraswati nagari 6.pdf8 Oct 2025
Form 2File: Form 2 , 4-6 2024 saraswati nagari 6.pdf8 Oct 2025
Form 3File: Form 3 , 4-6 2024 saraswati nagari 6.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 4-6 2024 saraswati nagarri 6.pdf8 Oct 2025
Form 1File: Form 1 , 7-9 2024 saraswati nagari 6.pdf8 Oct 2025
Form 2File: Form 2 , 7-9 2024 saraswati nagari 6.pdf8 Oct 2025
Form 3File: Form 3 , 7-9 2024 saraswati nagari 6.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 7-9 2024 saraswati nagari 6.pdf8 Oct 2025
Form 1File: Form 1 , 10-12 2024 saraswati nagari 6.pdf8 Oct 2025
Form 2File: Form 2 , 10-12 2024 saraswati nagari 6.pdf8 Oct 2025
Form 3File: Form 3 , 10-12 2024 saraswati nagari 6.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 10-12 2024 saraswati nagari 6.pdf8 Oct 2025
Form 1File: Form 1 , 1-3 2025 saraswati nagari 6.pdf8 Oct 2025
Form 2File: Form 2 , 1-3 2025 saraswati nagari 6.pdf8 Oct 2025
Form 3File: Form 3 , 1-3 2025 saraswati nagari 6.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 1-3 2025 saraswati nagari 6.pdf8 Oct 2025
Form 1File: april to june 2022 saras 6 (Form 1).pdf6 Oct 2025
Form 2File: april to june 2022 saras 6 (Form 2).pdf6 Oct 2025
Form 3File: april to june 2022 saras 6 (Form 3) (3).pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: april to june 2022 saras 6 Disclosure of sold_ booked inventory (2).pdf6 Oct 2025
Form 1File: july to september 2022 saras 6 (Form 1) (2).pdf6 Oct 2025
Form 2File: july to september 2022 saras 6 (Form 2) (3).pdf6 Oct 2025
Form 3File: july to september 2022 saras 6 (Form 3).pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: july to september 2022 saras 6 Disclosure of sold_ booked inventory (2).pdf6 Oct 2025
Form 1File: oct to dec 2022 saras 6 (Form 1) (2).pdf6 Oct 2025
Form 2File: oct to dec 2022 saras 6 (Form 2) (3).pdf6 Oct 2025
Form 3File: oct to dec 2022 saras 6 (Form 3) (1).pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: oct to dec 2022 saras 6 Disclosure of sold_ booked inventory (1).pdf6 Oct 2025
Form 1File: Form 1 , 1-3 2023 saraswati nagari 6.pdf6 Oct 2025
Form 2File: Form 2 , 1-3 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 3File: form 3 , 1-3 2023 saraswati nagari 6.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 1-3 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 1File: Form 1 4-6 2023 saraswati nagari 6.pdf6 Oct 2025
Form 2File: Form 2 , 4-6 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 3File: Form 3 , 4-6 2023 Saraswati nagari 6.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 4-6 , 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 1File: Form 1 , 7-9 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 2File: Form 2 , 7-9 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 3File: Form 3 , 7-9 2023 Saraswati nagari 6.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 7-9 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 1File: Form 1 , 10-12 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 2File: Form 2 , 10-12 2023 Saraswati nagari 6.pdf6 Oct 2025
Form 3File: Form 3 , 10-12 Saraswati nagari 6.pdf6 Oct 2025
Disclosure of Sold and Booked InventoryFile: DSBI 10-12 2023 Saraswati nagari 6.pdf6 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan to Mar 25.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan to Mar 25.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: DSBI Jan to Mar 25.pdf26 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Jan to Mar 25 CA Certificate SN6Latest.pdf18 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 FORM 3 OCT TO DEC 2023.pdf27 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 FORM 3 APRIL TO JUN 2024.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 Jul to Sep 22.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 Apr to jun 22.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Form 1 Oct to Dec 24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 Jul to Sep 24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 Apr to Jun 24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 Jan to Mar 24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 Oct To Dec 23.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 Jul to Sept 23.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 Apr to Jun 23.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 Jan to Mar 23.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 Oct to Dec 22.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 FORM 3 OCT TO DEC 2024.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 FORM 3 JUL TO SEP 2024.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 FORM 3 APRIL TO JUN 2024.pdf24 Mar 2025

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SARASWATI NAGARI 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near P.H NO. 12A2,800+ in Nagpur

2 kmSARASWATI NAGARI 6Completed 8Lapsed / revoked 2Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: NADEEM ANWAR ABDUL SHAKUR

NADEEM ANWAR ABDUL SHAKUR has 1 registration on MahaRERA, including SARASWATI NAGARI 6. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that SARASWATI NAGARI 6 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SARASWATI NAGARI 6 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SARASWATI NAGARI 6?

The registered promoter entity is NADEEM ANWAR ABDUL SHAKUR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SARASWATI NAGARI 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SARASWATI NAGARI 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SARASWATI NAGARI 6?

The professionals named in the filing: Architect: PAWAN GUPTA; Engineer: AHMAD KASHIF IQBAL; Chartered Accountant: MJM Associates; Chartered Accountant: Priyanka Parse. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SARASWATI NAGARI 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SARASWATI NAGARI 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SARASWATI NAGARI 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.