Home / Browse projects / Thane, Maharashtra / SAPTASHREE GALICIA

Registered No litigation declared Others project

SAPTASHREE GALICIA

By SAPTASHREE REALITY PRIVATE LIMITED

RG-MH-06743 · RERA P51700054273 · Last updated on MahaRERA portal: 29 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 10.00 crore secured on the land, in favour of TJSB SAHAKARI BANK LTD

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2028Possession promisedno revision filed
3 of 9Construction stages donefurthest along: Slabs of Super Structure, 88%
125 of 165Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

SAPTASHREE GALICIA is a Others project by SAPTASHREE REALITY PRIVATE LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700054273 on 15 Jan 2024. Possession is promised by 31 May 2028. 40 of the 165 units on this registration are recorded sold or booked, and 3 of 9 construction stages are filed complete.

At a glance

Project

  • NameSAPTASHREE GALICIA
  • TypeOthers
  • Location
    • KOLSHET ROAD
    • KOLSHET
    • Thane (M Corp.)
    • Thane
    • 400607
  • Pincode400607
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700054273
  • ReraGenie IDRG-MH-06743

Builder

  • NameSAPTASHREE REALITY PRIVATE LIMITED
  • Entity typeCompany
  • Managing DirectorAMARSINGH NARAYANSINGH THAKUR
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredJan 2024PromisedMay 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Jan 2024
  • Promised completion31 May 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed91 files

Current status

24%40 of 165 units booked
50.3%Work done, per cost certificate

Figures as on 29 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAPTASHREE GALICIANA202014817165

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 9 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 88%.

SAPTASHREE GALICIA: 60% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt Floor100%
Slabs of Super Structure88%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks61%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.42%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.5%

Progress on shared amenities15

As on 29 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed271

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots271
Closed/Covered186
Open Space85

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area2,889 sq m
Land owned byNot the promoter
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofTJSB SAHAKARI BANK LTD
Secured amountRs 10.00 crore
CERSAI search filedYes
Declared on16 May 2026
LandownerVillageDistrict
Shri Madhukar Jagan @Jagnath BhoirThane (M Corp.)Thane
Shri Dasharath Jagan @ Jagnath BhoirThane (M Corp.)Thane
Kum. Tanvi Bharat BhoirThane (M Corp.)Thane
Kum. Janvhi Bharat BhoirThane (M Corp.)Thane
Smt. Revati Harishchandra PatilThane (M Corp.)Thane
Smt. Anita Bharat BhoirThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI12706.66
Proposed, not sanctioned10,261 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchV S MARG THANE WEST
Estimated costRs 40.74 cr
Cost incurredRs 20.50 cr
Work done50.31%
BuildingWingEstimatedIncurred
SAPTASHREE GALICIANARs 40.74 crRs 20.50 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAAKAAR ARCHITECTS
EngineerRajan Chandrakant Tipnis
EngineerJ Kumar Shekharan
Chartered AccountantA K O R D & CO.
Chartered AccountantMAYUR GOSRANI AND ASSOCIATES
Chartered AccountantR G V A & Associates
PartnerRole in project
SAPTASHREE REALITY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Aug 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2028

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 2A- saptashree galicia- March-26.pdf29 Jun 2026
Withdrawal Update Form 1File: FORM 1 Saptashree Galicia Q4 FY 25-26 signed.pdf3 Jun 2026
Withdrawal Update Form 2File: FORM 2 Saptashree Galicia Q4 FY 25-26 signed.pdf3 Jun 2026
Withdrawal Update Form 3File: FORM 3 Saptashree Galicia Q4 FY 25-26_ signed.pdf3 Jun 2026
Withdrawal Update Form 1File: SAPTASHREE REALTY GALCIA - last quater 2025.pdf16 Feb 2026
Withdrawal Update Form 2File: FORM-2-SAPTASHREE GALICIA- Q325.pdf16 Feb 2026
Withdrawal Update Form 3File: Form 3_Q3 Saptashree Galicia_Signed_compressed.pdf16 Feb 2026
Form 5 (FY 2023-2024)File: (FY 2023-24).pdf9 Dec 2025
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Saptashree Galicia.pdf9 Dec 2025
Withdrawal Update Form 1File: FORM 1 - GALICIA-09-25- FINAL.pdf25 Nov 2025
Withdrawal Update Form 2File: FORM-2- GALICIA-SEPT-25.pdf25 Nov 2025
Withdrawal Update Form 3File: Form 3 Q2_compressed.pdf25 Nov 2025
Withdrawal Update Form 1File: FORM1-Q1-25-26- SAPTASHREE GALICIA.pdf3 Sep 2025
Withdrawal Update Form 2File: FORM 2 Q1.pdf3 Sep 2025
Withdrawal Update Form 3File: FORM -3-Q1-25-26- SAPTASHREE GALICIA promoter signed.pdf3 Sep 2025
Withdrawal Update Form 1File: FORM1-Q1-25-26- SAPTASHREE GALICIA.pdf29 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q1.pdf29 Aug 2025
Withdrawal Update Form 3File: FORM -3-Q1-25-26- SAPTASHREE GALICIA promoter signed.pdf29 Aug 2025
Withdrawal Update Form 1File: FORM1-Q1-25-26- SAPTASHREE GALICIA.pdf28 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q1.pdf28 Aug 2025
Withdrawal Update Form 3File: FORM -3-Q1-25-26- SAPTASHREE GALICIA promoter signed.pdf28 Aug 2025
Layout approvalFile: SANCTIONED PLAN DTD 19-06-2025 Sign PDF.pdf1 Aug 2025
Building plan approvalFile: AMENDED PERMISSION-CC DTD 19-06-2025 Sign.pdf1 Aug 2025
Commencement certificateFile: AMENDED PERMISSION-CC DTD 19-06-2025 Sign.pdf1 Aug 2025
Withdrawal Update Form 1File: FORM1-Q1-25-26- SAPTASHREE GALICIA.pdf1 Aug 2025
Withdrawal Update Form 2File: FORM 2 Q1.pdf1 Aug 2025
Withdrawal Update Form 3File: FORM -3-Q1-25-26- SAPTASHREE GALICIA promoter signed.pdf1 Aug 2025
Withdrawal Update Form 1File: FORM1_GALICIA_MARCH-24.pdf26 Jul 2025
Withdrawal Update Form 2File: FORM-2_GALICIA_MARCH-24.pdf26 Jul 2025
Withdrawal Update Form 3File: Withdrawal Application Form3 (4).pdf26 Jul 2025
Form 2A (FY 2024-2025)File: 2A_GALICIA_SIGNED.pdf28 Jun 2025
Form 1File: FORM1- SAPTASHREE GALICIA- MARCH-25.pdf21 May 2025
Form 2File: FORM 2 20-5-25 Galicia.pdf21 May 2025
Form 3File: Signed Form 3_compressed.pdf21 May 2025
Disclosure of Sold and Booked InventoryFile: sold unsold inventroy - march-25.pdf21 May 2025
Self-declaration of Quarterly ProgressFile: Q4-Declarations.pdf21 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 Q3-GALICIA-SIGNED.pdf27 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2- Galicia-DEC-24 (1).pdf27 Mar 2025
Disclosure of sold/ booked inventoryFile: sold unsold invetory - dec-24.pdf25 Mar 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE - DEC-24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Q3 24-25- FORM1-GALCIA-DEC-24.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 galicia.pdf24 Mar 2025
CERSAI detailsFile: Assets based report- dec-24.pdf24 Mar 2025
CERSAI detailsFile: DEBTORS BASED REPORT-DEC-24.pdf24 Mar 2025
CERSAI detailsFile: CERSAI_Search_Report_200344799421_For_Debtor_Based_Search_13_03_2025_15_00_12_901.pdf24 Mar 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCE - DEC-24.pdf24 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-ARCHITECT CERTIFICATE - GALICIA-SEPT-24.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3- SEPT-24-GALICIA.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SEPT-24-GALICIA.pdf6 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2-JUNE-24.pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM-5_SAPTASHREE GALICIA.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1-ARCHITECT CERTIFICATE- GALICIA - JUNE-24.pdf31 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_June 24.pdf31 Dec 2024
Details of encumbrances concerned to FinanceFile: LEGAL_FINANCIAL ENCUMBRANCE.pdf30 Dec 2024
Details of encumbrances concerned to FinanceFile: LEGAL_FINANCIAL ENCUMBRANCE.pdf30 Dec 2024
Details of encumbrances concerned to LegalFile: LEGAL_FINANCIAL ENCUMBRANCE.pdf30 Dec 2024
Details of encumbrances concerned to LegalFile: LEGAL_FINANCIAL ENCUMBRANCE.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1_GALICIA_MARCH-24.pdf11 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2_GALICIA_MARCH-24.pdf11 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_GALICIA_MARCH-24.pdf11 May 2024
Proforma of Agreement for saleFile: RERA Promoter Agreement Galicia (2).pdf29 Apr 2024
Building plan approvalFile: FLOOR_PLAN.pdf11 Dec 2023
Building plan approvalFile: FLOOR_PLAN- REFUGEE AND PARKING TOWER.pdf11 Dec 2023
Layout approvalFile: LAYOUT_PLAN.pdf11 Dec 2023
Copy of Layout Approval (in case of layout)File: LAYOUT_PLAN.pdf11 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: FLOOR_PLAN.pdf11 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: FLOOR_PLAN- REFUGEE AND PARKING TOWER.pdf11 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OTHER REAL ESTATE_AMARSINGH THAKUR.pdf11 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OTHER REAL ESTATE_SOHANSINGH THAKUR.pdf11 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSUREOF OTHER REAL ESTATE_ANITA THAKUR.pdf11 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: ARCHITECT_04_COMMENCEMENT_CERTIFICATE.pdf28 Nov 2023
Details of encumbrances concerned to FinanceFile: MNGT_02_ENCUMBRANCE_FINANCE.pdf27 Nov 2023
Details of encumbrances concerned to FinanceFile: MNGT_02A_ENCUMBRANCE LEGAL.pdf27 Nov 2023
Details of encumbrances concerned to LegalFile: MNGT_02_ENCUMBRANCE_FINANCE.pdf27 Nov 2023
Details of encumbrances concerned to LegalFile: MNGT_02A_ENCUMBRANCE LEGAL.pdf27 Nov 2023
Declaration in FORM BFile: FORM B_ SAPTASHREE REALITY.pdf27 Nov 2023
CERSAI detailsFile: MNGT_09A_DECLARATION_CRESAI (1).pdf18 Nov 2023
PAN CardFile: MNGT_10_PAN CARD.pdf7 Nov 2023
Copy of the legal title reportFile: LEGAL_05_LEGAL TITLE REPORT.pdf7 Nov 2023

How this compares with Thane

24%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAPTASHREE GALICIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOLSHET7,600+ in Thane

2 kmSAPTASHREE GALICIACompleted 64Lapsed / revoked 11Other 54Dot size: filed unitsN

Filed coordinates, straight-line distance. 129 registered projects within 2 km.

Builder: SAPTASHREE REALITY PRIVATE LIMITED

SAPTASHREE REALITY PRIVATE LIMITED has 2 registrations on MahaRERA, including SAPTASHREE HEIGHTS and SAPTASHREE GALICIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAPTASHREE GALICIA is delayed beyond 31 May 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAPTASHREE GALICIA?

The registered promoter entity is SAPTASHREE REALITY PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAPTASHREE GALICIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAPTASHREE GALICIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAPTASHREE GALICIA?

The professionals named in the filing: Architect: SAAKAAR ARCHITECTS; Engineer: Rajan Chandrakant Tipnis; Engineer: J Kumar Shekharan; Chartered Accountant: A K O R D & CO.; Chartered Accountant: MAYUR GOSRANI AND ASSOCIATES; Chartered Accountant: R G V A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAPTASHREE GALICIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAPTASHREE GALICIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAPTASHREE GALICIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.