Registration lapsed No litigation declared Residential / Group Housing project

SANJAY BALGOUNDA PATIL

By SANJAY BALGOUNDA PATIL

RG-MH-90722 · RERA P53000018735 · Last updated on MahaRERA portal: 6 Nov 2019

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 67 months past the filed date
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Mar 2021Possession promised67 months past this date
1 of 11Construction stages donefurthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 19 documents Report an error

SANJAY BALGOUNDA PATIL is a Residential / Group Housing project by SANJAY BALGOUNDA PATIL in Kolhapur, Maharashtra, registered with MahaRERA as P53000018735 on 29 Nov 2018. Possession was promised by 31 Mar 2021 and is now 67 months past that date. The completion date has moved by 24 months from the original filing.

At a glance

Project

  • NameSANJAY BALGOUNDA PATIL
  • TypeResidential / Group Housing
  • Location
    • KURUNWADE MALA
    • PUJARI MALA
    • Ichalkaranji (M Cl)
    • Hatkanangle
    • Kolhapur
    • 416115
  • Pincode416115
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000018735
  • ReraGenie IDRG-MH-90722

Builder

  • NameSANJAY BALGOUNDA PATIL
  • Entity typeIndividual
  • Declared earlier projects2 →

Key dates

67 months past promisethis monthRegisteredNov 2018First promiseMar 2019Revised toMar 2021

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Nov 2018
  • Promised completion31 Mar 2021
  • Revised completionRevised to 31 Mar 2021 (originally 31 Mar 2019)
  • Buildings1 building record
  • Documents filed19 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
MALATIMADHAV PRESTIGENA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Nov 2019, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

1 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 90%.

MALATIMADHAV PRESTIGE: 65% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)80%
Podiums (if any)80%
Plinth80%
Stilt Floor75%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 6 Nov 2019, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes20%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area984 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1180.5
Proposed, not sanctioned1,180 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchDHANY GALLI

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY BALGOUNDA PATIL
EngineerSANJAY BALGOUNDA PATIL
Chartered AccountantBASUDE MAKOTE AND SAINI
PartnerRole in project
SANJAY BALGOUNDA PATIL-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53000002481Mar 2019 → Mar 2021

Reason as filed by the promoterWE ARE WORKING THIS PROJECT AS PER CUSTOMER AVAILABLE. WE THINK THAT WE WILL GET CUSTOMER AS PER OUR SCHEDULE BUT DUE TO RECESSION IN MARKET THE CUSTOMER RESPONSE IS VERY POOR. SO WE REQUIRE SOME ADDITIONAL TIME TO COMPLETE THE PROJECT.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Nov 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Nov 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed19

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer crt.pdf6 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5.pdf6 Nov 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5-A.pdf6 Nov 2019
OtherFile: LETTER NOV 19.pdf6 Nov 2019
OtherFile: LETTER MARCH 19.pdf6 Nov 2019
OtherFile: BS 18.pdf6 Nov 2019
OtherFile: BS 19.pdf6 Nov 2019
Layout approvalFile: ajantha1 mb.pdf22 Nov 2018
Building plan approvalFile: ajantha1 mb.pdf22 Nov 2018
PAN CardFile: pan.pdf22 Nov 2018
Copy of the legal title reportFile: development agriment.pdf22 Nov 2018
Details of encumbrancesFile: sarbara.pdf22 Nov 2018
Copy of Layout Approval (in case of layout)File: ajantha1 mb.pdf22 Nov 2018
Building Plan Approval (IOD)File: ajantha1 mb.pdf22 Nov 2018
Commencement Certificates / NA Order for plotted developmentFile: paravana.pdf22 Nov 2018
Declaration in FORM BFile: AFIDIVITE.pdf22 Nov 2018
Certificates of CA (Form 3)File: CA Certificate.pdf22 Nov 2018
Proforma of Allotment letterFile: AGREEMENT COPY.pdf22 Nov 2018
OtherFile: searc report-2.pdf22 Nov 2018

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
BALKRISHANA APPARTMENTKURUNDWADE MALA ICHALKARANJI14CompletedNov 2015Late, May 2017

How this compares with Kolhapur

17%of Kolhapur projects moved their completion datethis one moved by 24 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is among them

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep SANJAY BALGOUNDA PATIL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUJARI MALA880+ in Kolhapur

2 kmSANJAY BALGOUNDA PATILCompleted 50Lapsed / revoked 26Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 142 registered projects within 2 km.

Builder: SANJAY BALGOUNDA PATIL

SANJAY BALGOUNDA PATIL has 1 registration on MahaRERA, including SANJAY BALGOUNDA PATIL. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What does it mean that SANJAY BALGOUNDA PATIL shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SANJAY BALGOUNDA PATIL is delayed beyond 31 Mar 2021?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SANJAY BALGOUNDA PATIL?

The registered promoter entity is SANJAY BALGOUNDA PATIL, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SANJAY BALGOUNDA PATIL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SANJAY BALGOUNDA PATIL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SANJAY BALGOUNDA PATIL?

The professionals named in the filing: Architect: SANJAY BALGOUNDA PATIL; Engineer: SANJAY BALGOUNDA PATIL; Chartered Accountant: BASUDE MAKOTE AND SAINI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANJAY BALGOUNDA PATIL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANJAY BALGOUNDA PATIL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANJAY BALGOUNDA PATIL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.