Home / Browse projects / Udupi, Karnataka / SANIDHYA RESIDENCY

Registration approved No litigation declared Mixed Development project

SANIDHYA RESIDENCY

By VINAY KUMAR

RG-KA-01346 · RERA PRM/KA/RERA/1273/319/PR/290423/005907 · Last updated on RERA Karnataka portal: 25 Apr 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Sep 2022Possession promisedno revision filed
0 of 14Construction stages donefurthest along: Earth work and other leveling..., 0%
19 of 19Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 84 documents Report an error

SANIDHYA RESIDENCY is a Mixed Development project by VINAY KUMAR in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/319/PR/290423/005907 on 29 Apr 2023. Possession is promised by 5 Sep 2022. 0 of the 19 units on this registration are recorded sold or booked, and 0 of 14 construction stages are filed complete.

At a glance

Project

  • NameSANIDHYA RESIDENCY
  • TypeMixed Development
  • Location
    • Karkala
    • Udupi
    • 574110
  • Pincode574110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1273/319/PR/290423/005907
  • ReraGenie IDRG-KA-01346

Builder

  • NameVINAY KUMAR
  • Entity typeProprietorship Firm
  • GSTIN29AGRPK6273E1ZX
  • Authorized SignatoryVINAY KUMAR

Key dates

Registered
29 Apr 2023
Promised
5 Sep 2022

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on29 Apr 2023
  • Promised completion5 Sep 2022
  • Revised completionNone
  • Buildings1 building record
  • Documents filed84 files

Current status

0%0 of 19 units booked

Figures as on 25 Apr 2023, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SANIDHYA RESIDENCY-----19

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 25 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 14 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 0%.

Building: 0% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 25 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area809 sq m
Land owned byNot the promoter
Named landowners1
LandownerVillageDistrict
VINAY KUMAR--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 1.23 cr
BuildingWingEstimatedIncurred
-NARs 1.23 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMOHAMMED NAUSHAD
EngineerMOHAMMED NAUSHAD
Chartered AccountantAJITH PRASAD

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed84

As listed on the registration, under the names the promoter filed them with; the newest 80 of 84 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/319/PR/290423/005907 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
sale deed project land owner in the name of sarojini shettyFile: deed in name of sarojini shedthi.pdf25 Apr 2023
clarificationFile: clarification.pdf25 Apr 2023
sarojini shedthi deedFile: sale deed.pdf25 Apr 2023
RTC, survey 361/1P2-
Mutation, survey 361/1P2-
Encumbrance Certificate, survey 361/1P2-
Conversion/Alienation Order, survey 361/1P2-
Sale/Title/Gift Deed, survey 361/1P2-
Khatha, survey 361/1P2-
Registration CertificateFile: GST.pdf-
Certificate issued by CA Form 1File: ca certificate_compressed.pdf-
Certificate issued by Architect Form 2File: Form -2.pdf-
Certificate issued by Engineer Form 3File: Form-3.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Certificate from Chartered AccountFile: ca certificate_compressed.pdf-
Balance Sheet 2021 - 2022File: BS 2022.pdf-
Balance Sheet 2020 - 2021File: BS 2021.pdf-
Balance Sheet 2019 - 2020File: BS 2020.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL 2022.pdf-
Audited Profit and Loss Statement 2020 - 2021File: PL 2021.pdf-
Audited Profit and Loss Statement 2019 - 2020File: PL 2020.pdf-
Cash Flow Statement 2021 - 2022File: IS 2022.pdf-
Cash Flow Statement 2020 - 2021File: IS 2021.pdf-
Auditor's Report 2021 - 2022File: UDIN-2022.pdf-
Auditor's Report 2020 - 2021File: UDIN-2021.pdf-
Auditor's Report 2019 - 2020File: UDIN-2020.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 2022-23.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 2020-21.pdf-
building licence approval-
sanction plan-
single layout final-
sanction plan-
sanction plan-
sanction plan-
specification-
single layout final-
single layout final-
Stability certiifcate-
search report-
title deed-
conversion order_compressed-
conversion order_compressed-
proforma AOS-
proforma allotment letter-
broucher-
form b_compressed-
affidvit 3(1)-
mescom noc-
water noc-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
guidance value-
estimation cost of engineer-
completion certificate-
bank affidavit-
affidavit for sold unsold units-
bank affidavit by promoter-
bank account with bank affidavit-
Form-6-
Form-5-
area statement-
delay reason-

How this compares with Udupi

0%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep SANIDHYA RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

Builder: VINAY KUMAR

VINAY KUMAR has 1 registration on RERA Karnataka, including SANIDHYA RESIDENCY. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if SANIDHYA RESIDENCY is delayed beyond 5 Sep 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SANIDHYA RESIDENCY?

The registered promoter entity is VINAY KUMAR, a proprietorship firm as per the filing. Its GSTIN 29AGRPK6273E1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SANIDHYA RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SANIDHYA RESIDENCY?

The professionals named in the filing: Architect: MOHAMMED NAUSHAD; Engineer: MOHAMMED NAUSHAD; Chartered Accountant: AJITH PRASAD. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SANIDHYA RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SANIDHYA RESIDENCY. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SANIDHYA RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.