Sanghvi Heights Phase 2
By Sanghvi Premises Private Limited
RG-MH-28519 · RERA P51900026345 · Last updated on MahaRERA portal: 15 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Sanghvi Heights Phase 2 is a Residential / Group Housing project by Sanghvi Premises Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900026345 on 11 Sep 2020. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 19 of the 31 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameSanghvi Heights Phase 2
- TypeResidential / Group Housing
- Location
- Antop Hill
- Nadkarni Park
- Mumbai City
- 400037
- Pincode400037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900026345
- ReraGenie IDRG-MH-28519
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Sep 2020
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 15 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Sanghvi Heights Phase 2 | NA | 8 | 8 | 31 | 0 | 31 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
Sanghvi Heights Phase 2: 87% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 71% |
Progress on shared amenities15
As on 15 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 81% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 20% |
Parking filed19
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ms Vision Architects |
| Engineer | Nishant Mehta |
| Chartered Accountant | R A N K & Associates |
| Partner | Role in project |
|---|---|
| Sanghvi Premises Private Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe aforesaid under Construction project got delayed in the first half of year 2023 due to critical shortages of key materials like sand and ready-mix concrete, causing delays in construction schedules. In third quarter 2023, implementation of stringent state regulations, particularly stricter air pollution control measures for developers significantly impeded procuring construction materials and managing debris disposal. This resulted in further delays of Few months.
Litigation declared6
| Case | Court | Status |
|---|---|---|
| Criminal Writ Petition No 2091/2014 | Bombay High Court | Pending |
| SC Suit No 1757 of 2016/2016 | Bombay High Court | Pending |
| CC NO 193 SW/2013 | BHOIWADA COURT DADAR MUMBAI | Pending |
| Appeal No 93/2014 | The Honble High Power Committee At Mumbai | Pending |
| Appeal No 94/2014 | The Honble High Power Committee At Mumbai | Pending |
| Appeal no 95/2014 | The Honble High Power Committee At Mumbai | Pending |
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400233 | Tasneem Feroz Nalwalla | Sanghvi Premises Private Limited | 26/09/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Aug 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Sep 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 16 Sep 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 28 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 15 Feb 2025
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: SANGHVI HEIGHTS OC COPY 14-02-2025.pdf | 15 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 signed as on 30092024.pdf | 10 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sanghvi Heights Phase 2Form 3 (CA Certificate) as on 30092024.pdf | 9 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SAPPL2Sold Booked inventory as on 30092024_On portal.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _Sanghvi Heights_30092024.pdf | 8 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24_Sanghvi Heights Phase 2.pdf | 6 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 7 Nov 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200313352631_For_Asset_Based_Search_12CR.pdf | 19 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sanghvi Heights Phase 2_11zon.pdf | 19 Jul 2024 |
| Declaration in FORM BFile: Form B - Sanghvi Heights Phase 2_Compressed.pdf | 18 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Signed.pdf | 18 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf | 18 Jul 2024 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrance.pdf | 11 Jul 2024 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrance.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Sanghvi Heights Phase 2_FY 22-23_11zon.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A_Sanghvi Heights Phase 2_FY 23-24_11zon.pdf | 11 Jul 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about separate bank.pdf | 11 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: SAPPL 2 _ dis of sold unsold_Signed.pdf | 27 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Self Declaration.pdf | 8 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Self Declaration.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf | 8 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Self Declaration.pdf | 8 Mar 2024 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Heights_2.pdf | 6 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 _Sanghiv Heights _II FORM 22-23_SIGNED Final.pdf | 17 Oct 2023 |
| Details of encumbrancesFile: RERA Encumbrance_sanghvi Heights 2.pdf | 12 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Heights Phase 2 as on 30062023.pdf | 29 Aug 2023 |
| Declaration about Commencement CertificateFile: Format D - Declaration on CC.pdf | 22 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A - FY-21.pdf | 22 May 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A - FY-22.pdf | 22 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC SANGHVI HEIGHTS FINAL 27-02-2023 (1).pdf | 28 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Samghvi heights Phase 2 _Disclosure of soldunsold.pdf | 28 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: sanghvi phase 2 - sold unsold details.pdf | 24 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Sanghvi Heights Phase- II_Form 5 FY 21-22.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Heights31122021.pdf | 2 Jun 2022 |
| Disclosure of sold/ booked inventoryFile: Pages from Sanghvi Heights31032022.pdf | 2 Jun 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sanghvi Heights Phase 2 as on 31122021.pdf | 5 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: SanghviHeightsWadalaFurtherCC21st foor dated19012022.pdf | 24 Jan 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sanghvi Heigts Phase 2 June 21.pdf | 14 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Sanghvi Heights Phase 2 September.pdf | 14 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sanghvi Heights Phase 2_Form 5_Signed.pdf | 14 Oct 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Sanghvi Heights CC 20 th floor part Date -30_09_2021_compressed.pdf | 30 Sep 2021 |
| Building plan approvalFile: IOA_17082021_Heights.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20210828_3.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20210828_0004_compressed.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20210828_0005_compressed.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20210828_0006_compressed.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20210828_0007_compressed.pdf | 16 Sep 2021 |
| Layout approvalFile: MYSCAN_20210828_0008_compressed.pdf | 16 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210828_3.pdf | 16 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210828_0004_compressed.pdf | 16 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210828_0005_compressed.pdf | 16 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210828_0006_compressed.pdf | 16 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210828_0007_compressed.pdf | 16 Sep 2021 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_20210828_0008_compressed.pdf | 16 Sep 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA_17082021_Heights.pdf | 16 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_17082021_Heights_compressed.pdf | 16 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sanghvi Heights Phase 2_Sold Booked Inventory_compressed.pdf | 16 Aug 2021 |
| Proforma of Allotment letterFile: AFS1_compressed.pdf | 11 Aug 2021 |
| Proforma of Allotment letterFile: AFS_2_compressed.pdf | 11 Aug 2021 |
| Details of encumbrancesFile: ENCUMBRANCE OF SANGHVI HEIGHTS_AU.pdf | 4 Aug 2021 |
| Proforma of Allotment letterFile: AFS- Sanghvi Heights Phase 2- SPPL by Grishma 2 Aug 21.pdf | 4 Aug 2021 |
| Declaration in FORM BFile: Form B_Revised_upload.pdf | 9 Sep 2020 |
| Proforma of Allotment letterFile: AFS- Sanghvi Heights - SPPL 1 Sep 2020_Revised.pdf | 9 Sep 2020 |
| Proforma of Allotment letterFile: Sanghvi Heights - Allotment Draft.pdf | 9 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_Sanghvi Heights 2_06-25-2020_upload.pdf | 4 Sep 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Qualilty Ass Certficate_upload.pdf | 4 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Certificate_Sanghvi Heights Phase 2_signed_upload.pdf | 28 Aug 2020 |
| Layout approvalFile: Layout 2 for 19 floors 11 Feb 2020.pdf | 27 Aug 2020 |
| Building plan approvalFile: IOD 2 11 Feb 2020.pdf | 27 Aug 2020 |
| PAN CardFile: 1 PAN.pdf | 27 Aug 2020 |
| Copy of the legal title reportFile: Title Report - CS other than 68_OK.pdf | 27 Aug 2020 |
| Copy of the legal title reportFile: Title Report - CS No 68 pt.pdf | 27 Aug 2020 |
| Details of encumbrancesFile: Non Encumbrance Certificate_upload.pdf | 27 Aug 2020 |
| Copy of Layout Approval (in case of layout)File: Layout 2 for 19 floors 11 Feb 2020.pdf | 27 Aug 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD 2 11 Feb 2020.pdf | 27 Aug 2020 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Phase 2.pdf | 27 Aug 2020 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Phase 2_upload.pdf | 27 Aug 2020 |
Promoter's earlier projects9
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Sanghvi Valley Phase - Ii | Kalwa | 124 | Completed | Dec 2015 | Late, Feb 2016 |
| Sanghvi Ecocity | Mira Road | 226 | Completed | Dec 2015 | Late, Apr 2016 |
| Sanghvi Nisarg Phase II | Lonavla | 12 | Completed | Jun 2015 | Late, Jul 2015 |
| Shree Mohankheda Heights | Byculla | 60 | Completed | Dec 2013 | Late, Mar 2014 |
| Sanghvi Galaxy | Girgaon | 34 | Completed | Dec 2011 | Late, Nov 2012 |
| Sanghvi Exotica | Dahisar | 75 | Completed | Dec 2011 | Late, Jul 2012 |
| Sanghvi Nakshtra | Nasik | 96 | Completed | Jul 2011 | Late, Aug 2011 |
| Sanghvi Nisarg - Phase I | Lonavla | 44 | Completed | Mar 2011 | Late, Dec 2015 |
| Sanghvi Valley Phase I | Kalwa | 176 | Completed | Dec 2009 | Late, May 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai City
Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Sanghvi Heights Phase 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nadkarni Park780+ in Mumbai City
Filed coordinates, straight-line distance. 120 registered projects within 2 km.
The Earth
AB BUILDERS AND DEVELOPERS SOLUTIONS PRIVA
AJMERA MANHATTAN BUILDING 3A AND 3B
AJMERA REALTY AND INFRA INDIA LTD
AJMERA MANHATTAN BUILDING 4A AND 4B
AJMERA REALTY AND INFRA INDIA LTD
DOSTI EASTERN BAY - PHASE 3
DOSTI REALTY LTD
Siddha Sky Phase 2
M/s Sejal Shakti Realtors LLP
Siddha Sky Phase 4
Sejal Shakti Realtors LLP
See every Mumbai City project, with the district possession charts
Builder: Sanghvi Premises Private Limited
Sanghvi Premises Private Limited has 8 registrations on MahaRERA, including Sanghvi Evana and SANGHVI SOLITAIRE. Its filings disclose 19 earlier MahaRERA projects: declares 1 of 18 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.
Frequently asked questions
What does it mean that Sanghvi Heights Phase 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Sanghvi Heights Phase 2 is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Sanghvi Heights Phase 2?
The registered promoter entity is Sanghvi Premises Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Sanghvi Heights Phase 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Sanghvi Heights Phase 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Sanghvi Heights Phase 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Sanghvi Heights Phase 2?
The professionals named in the filing: Architect: Ms Vision Architects; Engineer: Nishant Mehta; Chartered Accountant: R A N K & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Sanghvi Heights Phase 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback