Home / Browse projects / Thane, Maharashtra / SAMRUDDHI FLORA

Registered No litigation declared Residential / Group Housing project

SAMRUDDHI FLORA

By SAMRUDDHI BUILDCON

RG-MH-79048 · RERA P51700053740 · Last updated on MahaRERA portal: 19 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 30 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jan 2027Possession promisedmoved 30 months from the original
3 of 11Construction stages donefurthest along: Stilt Floor, 95%
11 of 42Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 96 documents Report an error

SAMRUDDHI FLORA is a Residential / Group Housing project by SAMRUDDHI BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700053740 on 28 Nov 2023. Possession is promised by 30 Jan 2027. The completion date has moved by 30 months from the original filing. 31 of the 42 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAMRUDDHI FLORA
  • TypeResidential / Group Housing
  • Location
    • DEVRUNG
    • BHIWANDI
    • Chavindra
    • Thane
    • 421302
  • Pincode421302
  • RERA no.P51700053740
  • ReraGenie IDRG-MH-79048

Builder

  • NameSAMRUDDHI BUILDCON
  • Entity typePartnership
  • PartnersRAKESH DAYALCHAND KUMAVAT, PRASHANT MANGALDAS PATIL
  • PartnerNARESH KALURAM NAIK
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredNov 2023First promiseJul 2024Revised toJan 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Nov 2023
  • Promised completion30 Jan 2027
  • Revised completionRevised to 30 Jan 2027 (originally 30 Jul 2024)
  • Buildings1 building record
  • Documents filed96 files

Current status

74%31 of 42 units booked
95.2%Work done, per cost certificate

Figures as on 19 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAMRUDDHI FLORANA6638442

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.

SAMRUDDHI FLORA: 78% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor95%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 19 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed25

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots25
Closed/Covered11
Open Space14

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,100 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Jun 2026

Approvals and building plan

Sanctioning authorityNAGAR RACHNA AND MULYA NIRDHARAN VIBHAG THANE BRANCH
Permissible FSI3883.74
Proposed, not sanctioned1,942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2 TO 5, GROUND FLOOR, ORBIT COMMERCIAL COMPLEX BARAVE ROAD, KHADAKPADA, KALYAN WEST 421301
Estimated costRs 5.29 cr
Cost incurredRs 5.04 cr
Work done95.19%
BuildingWingEstimatedIncurred
SAMRUDDHI FLORANARs 5.09 crRs 4.84 cr
-NARs 20.36 lakhRs 20.36 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDHIRAJ PATIL
EngineerGANESH PATIL
EngineerSAYYED MOHAMMAD IRFAN
Chartered AccountantKISHOR WANKHEDE
PartnerRole in project
SAMRUDDHI BUILDCON-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700024063Jul 2024 → Jul 2025

Reason as filed by the promoterDear Team , All documents submitted, please process our application

EA24072502182Jul 2024 → Jan 2026

Reason as filed by the promoterDear Team, We need 6 month extension for our project , we are already near to our completion of our project.

EA16062621393Jul 2024 → Jan 2027

Reason as filed by the promoterDear Team, we are already near to our completion of our project.Our project is expected to receive its Occupancy Certificate (OC) very soon. Please extend project date.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jan 2027

Documents filed96

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf19 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf19 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf19 Sep 2026
Form 2A (FY 2023-2024)File: Form 2A F Y 23-24.pdf19 Sep 2026
Form 2A (FY 2024-2025)File: Form 2A F Y 24-25.pdf19 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A F Y 25-26.pdf19 Sep 2026
Withdrawal Update Form 1File: Form 1 Jan to Mar.pdf16 Jun 2026
Withdrawal Update Form 2File: Form 2 Jan to Mar.pdf16 Jun 2026
Withdrawal Update Form 3File: Form 3.pdf16 Jun 2026
Withdrawal Update Form 1File: Form 1 April to June.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 April to June.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 July to Sep.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 Oct to dec.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 Jan to Mar.pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 April to June.pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 April to June.pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 July to sep.pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 oct to dec.pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 Jan to Mar.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 April to June.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 April to June.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 July to Sep.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 Oct to Dec.pdf15 Jun 2026
Withdrawal Update Form 3File: Form 3 Jan to Mar.pdf15 Jun 2026
Form 1File: Form 1 Nov 23 to dec 23.pdf23 Jul 2025
Form 2File: Form 2 Nov 23 to Dec 23.pdf23 Jul 2025
Form 3File: Form 3 Nov 23 to Dec 23.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Nov 24 to Dec 23.pdf23 Jul 2025
Form 1File: Form 1 Jan 24 to Mar 24.pdf23 Jul 2025
Form 2File: Form 2 Jan 24 to Mar 24.pdf23 Jul 2025
Form 3File: Form 3 Jan 24 to March 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Jan 24 to March 24.pdf23 Jul 2025
Form 1File: Form 1 April 24 to June 24.pdf23 Jul 2025
Form 2File: Form 2 April 24 to June 24.pdf23 Jul 2025
Form 3File: Form 3 April 24 to June 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure April 24 to June 24.pdf23 Jul 2025
Form 1File: Form 1 July 24 to Sep 24.pdf23 Jul 2025
Form 2File: Form 2 July 24 to Sep 24.pdf23 Jul 2025
Form 3File: Form 3 July 24 to Sep 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure July 24 to Sep 24.pdf23 Jul 2025
Form 1File: Form 1 Oct 24 to Dec 24.pdf23 Jul 2025
Form 2File: Form 2 Oct 24 to Dec 24.pdf23 Jul 2025
Form 3File: Form 3 Oct 24 to Dec 24.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure oct 24 to Dec 24.pdf23 Jul 2025
Form 1File: Form 1.pdf23 Jul 2025
Form 2File: Form 2.pdf23 Jul 2025
Form 3File: Form 3.pdf23 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Jan 25 to Mar 25.pdf23 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jan 2025
Declaration in FORM BFile: Form B.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf3 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: Sold or Book Inventory.pdf3 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf3 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf29 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf29 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf27 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf27 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf27 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf27 Mar 2024
Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate.pdf20 Oct 2023
Details of encumbrances concerned to LegalFile: No Encumbrances Certificate.pdf20 Oct 2023
CERSAI detailsFile: Cersai Details.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Oct 2023
Copy of the legal title reportFile: Legal Title Report.pdf2 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Naresh.pdf2 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Prashant.pdf2 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rakesh.pdf2 Oct 2023

How this compares with Thane

74%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 30 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAMRUDDHI FLORA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHIWANDI7,600+ in Thane

Builder: SAMRUDDHI BUILDCON

SAMRUDDHI BUILDCON has 5 registrations on MahaRERA, including SPARSH HEIGHTS and Samruddhi Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAMRUDDHI FLORA is delayed beyond 30 Jan 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAMRUDDHI FLORA?

The registered promoter entity is SAMRUDDHI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAMRUDDHI FLORA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAMRUDDHI FLORA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAMRUDDHI FLORA?

The professionals named in the filing: Architect: DHIRAJ PATIL; Engineer: GANESH PATIL; Engineer: SAYYED MOHAMMAD IRFAN; Chartered Accountant: KISHOR WANKHEDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMRUDDHI FLORA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMRUDDHI FLORA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMRUDDHI FLORA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.