Home / Browse projects / Thane, Maharashtra / SAMRUDDHI FLORA
SAMRUDDHI FLORA
RG-MH-79048 · RERA P51700053740 · Last updated on MahaRERA portal: 19 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 30 months
- 3 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SAMRUDDHI FLORA is a Residential / Group Housing project by SAMRUDDHI BUILDCON in Thane, Maharashtra, registered with MahaRERA as P51700053740 on 28 Nov 2023. Possession is promised by 30 Jan 2027. The completion date has moved by 30 months from the original filing. 31 of the 42 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameSAMRUDDHI FLORA
- TypeResidential / Group Housing
- Location
- DEVRUNG
- BHIWANDI
- Chavindra
- Thane
- 421302
- Pincode421302
- RERA no.P51700053740
- ReraGenie IDRG-MH-79048
Builder
- NameSAMRUDDHI BUILDCON
- Entity typePartnership
- PartnersRAKESH DAYALCHAND KUMAVAT, PRASHANT MANGALDAS PATIL
- PartnerNARESH KALURAM NAIK
- Other registrations4 more →
- Completed2 of 5
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Nov 2023
- Promised completion30 Jan 2027
- Revised completionRevised to 30 Jan 2027 (originally 30 Jul 2024)
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 19 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SAMRUDDHI FLORA | NA | 6 | 6 | 38 | 4 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 95%.
SAMRUDDHI FLORA: 78% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 95% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 19 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed25
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SAMRUDDHI FLORA | NA | Rs 5.09 cr | Rs 4.84 cr |
| - | NA | Rs 20.36 lakh | Rs 20.36 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DHIRAJ PATIL |
| Engineer | GANESH PATIL |
| Engineer | SAYYED MOHAMMAD IRFAN |
| Chartered Accountant | KISHOR WANKHEDE |
| Partner | Role in project |
|---|---|
| SAMRUDDHI BUILDCON | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDear Team , All documents submitted, please process our application
Reason as filed by the promoterDear Team, We need 6 month extension for our project , we are already near to our completion of our project.
Reason as filed by the promoterDear Team, we are already near to our completion of our project.Our project is expected to receive its Occupancy Certificate (OC) very soon. Please extend project date.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Oct 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jan 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jan 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jan 2027
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 19 Sep 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Sep 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 Sep 2026 |
| Form 2A (FY 2023-2024)File: Form 2A F Y 23-24.pdf | 19 Sep 2026 |
| Form 2A (FY 2024-2025)File: Form 2A F Y 24-25.pdf | 19 Sep 2026 |
| Form 2A (FY 2025-2026)File: Form 2A F Y 25-26.pdf | 19 Sep 2026 |
| Withdrawal Update Form 1File: Form 1 Jan to Mar.pdf | 16 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Jan to Mar.pdf | 16 Jun 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 16 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 April to June.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 April to June.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 July to Sep.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Oct to dec.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Jan to Mar.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 April to June.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 April to June.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 July to sep.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 oct to dec.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Jan to Mar.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 April to June.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 April to June.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 July to Sep.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Oct to Dec.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Jan to Mar.pdf | 15 Jun 2026 |
| Form 1File: Form 1 Nov 23 to dec 23.pdf | 23 Jul 2025 |
| Form 2File: Form 2 Nov 23 to Dec 23.pdf | 23 Jul 2025 |
| Form 3File: Form 3 Nov 23 to Dec 23.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Nov 24 to Dec 23.pdf | 23 Jul 2025 |
| Form 1File: Form 1 Jan 24 to Mar 24.pdf | 23 Jul 2025 |
| Form 2File: Form 2 Jan 24 to Mar 24.pdf | 23 Jul 2025 |
| Form 3File: Form 3 Jan 24 to March 24.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Jan 24 to March 24.pdf | 23 Jul 2025 |
| Form 1File: Form 1 April 24 to June 24.pdf | 23 Jul 2025 |
| Form 2File: Form 2 April 24 to June 24.pdf | 23 Jul 2025 |
| Form 3File: Form 3 April 24 to June 24.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure April 24 to June 24.pdf | 23 Jul 2025 |
| Form 1File: Form 1 July 24 to Sep 24.pdf | 23 Jul 2025 |
| Form 2File: Form 2 July 24 to Sep 24.pdf | 23 Jul 2025 |
| Form 3File: Form 3 July 24 to Sep 24.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure July 24 to Sep 24.pdf | 23 Jul 2025 |
| Form 1File: Form 1 Oct 24 to Dec 24.pdf | 23 Jul 2025 |
| Form 2File: Form 2 Oct 24 to Dec 24.pdf | 23 Jul 2025 |
| Form 3File: Form 3 Oct 24 to Dec 24.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure oct 24 to Dec 24.pdf | 23 Jul 2025 |
| Form 1File: Form 1.pdf | 23 Jul 2025 |
| Form 2File: Form 2.pdf | 23 Jul 2025 |
| Form 3File: Form 3.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Jan 25 to Mar 25.pdf | 23 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 13 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 23 Jan 2025 |
| Declaration in FORM BFile: Form B.pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 3 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Sold or Book Inventory.pdf | 3 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 3 Jul 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 3 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 29 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 29 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate.pdf | 27 Mar 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf | 27 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 27 Mar 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf | 27 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf | 27 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrances Certificate.pdf | 20 Oct 2023 |
| Details of encumbrances concerned to LegalFile: No Encumbrances Certificate.pdf | 20 Oct 2023 |
| CERSAI detailsFile: Cersai Details.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 20 Oct 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 2 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Naresh.pdf | 2 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Prashant.pdf | 2 Oct 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rakesh.pdf | 2 Oct 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SAMRUDDHI FLORA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BHIWANDI7,600+ in Thane
GODREJ UPAVAN
PRAKHHYAT DWELLINGS LLP
DGT - Sector 3A - Cluster 2 - Phase 1
ADRIKA DEVELOPERS PRIVATE LIMITED
DOSTI GREATER THANE - PHASE 1
ADRIKA DEVELOPERS PRIVATE LIMITED
Dosti Greater Thane - Sector 3A - Cluster 1B -
ADRIKA DEVELOPERS PRIVATE LIMITED
USHA RESIDENCY
SHREE BUDHDEV INFRA
NARAYANI DHAM BUILDING NO 2A AND 2B
MAYA DEVELOPER
See every Thane project, with the district possession charts
Builder: SAMRUDDHI BUILDCON
SAMRUDDHI BUILDCON has 5 registrations on MahaRERA, including SPARSH HEIGHTS and Samruddhi Complex. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SAMRUDDHI FLORA is delayed beyond 30 Jan 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SAMRUDDHI FLORA?
The registered promoter entity is SAMRUDDHI BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SAMRUDDHI FLORA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SAMRUDDHI FLORA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SAMRUDDHI FLORA?
The professionals named in the filing: Architect: DHIRAJ PATIL; Engineer: GANESH PATIL; Engineer: SAYYED MOHAMMAD IRFAN; Chartered Accountant: KISHOR WANKHEDE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SAMRUDDHI FLORA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback