ReraGenieLog inGet a buyer report

Home / Browse projects / Udupi, Karnataka / SAMRIDDHI

Registration approved No litigation declared Mixed Development project

SAMRIDDHI

By Samriddhi Builders

RG-KA-92018 · RERA PRM/KA/RERA/1273/318/PR/031024/007111 · Last updated on RERA Karnataka portal: 14 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2027Possession promisedno revision filed
3 of 15Construction stages donefurthest along: RCC or MS Framed structure, 35%
19 of 27Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 175 documents Report an error

SAMRIDDHI is a Mixed Development project by Samriddhi Builders in Udupi, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1273/318/PR/031024/007111 on 3 Oct 2024. Possession is promised by 14 Mar 2027. 8 of the 27 units on this registration are recorded sold or booked, and 3 of 15 construction stages are filed complete.

At a glance

Project

  • NameSAMRIDDHI
  • TypeMixed Development
  • Location
    • Udupi
    • 574113
  • Pincode574113
  • RERA no.PRM/KA/RERA/1273/318/PR/031024/007111
  • ReraGenie IDRG-KA-92018

Builder

  • NameSamriddhi Builders
  • Entity typeProprietorship
  • GSTIN29AWZPD3629H1ZZ
  • Authorized SignatoryAnand John Xavier Dsouza

Key dates

this monthRegisteredOct 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on3 Oct 2024
  • Promised completion14 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed175 files

Current status

30%8 of 27 units booked
6.7%Of the estimated cost spent so far

Figures as on 14 Jul 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Samriddhi-----27

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 15 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 35%.

Building: 23% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)Not applicable
RCC or MS Framed structure35%
Masonry Construction10%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes0%
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes30%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceYes0%
Outer WallNoNot applicable
Open parking areasYes0%
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership7

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,764 sq m
Land owned byNot the promoter
Named landowners7
LandownerVillageDistrict
Anand John Xavier DSouza--
ANAND JOHN XAVIER DSOUZA--
ANAND JOHN XAVIER DSOUZA--
ANAND JOHN XAVIER DSOUZA--
ANAND JOHN XAVIER DSOUZA--
ANAND JOHN XAVIER DSOUZA--
ANAND JOHN XAVIER DSOUZA--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.11 cr
Cost incurredRs 27.32 lakh
Spent of the estimate6.66%
BuildingWingEstimatedIncurred
-NARs 4.00 crRs 27.32 lakh
-NARs 5.00 lakh-
-NARs 5.00 lakh-
-NARs 50,000-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectThrivikrama Bhat T & Associates, Architectural consultants & Engineers
EngineerShrikar.A. Karanth T & Associates Architectural consultants and Engineers
Chartered AccountantCA Mahindra Shenoy P

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed175

As listed on the registration, under the names the promoter filed them with; the newest 80 of 175 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1273/318/PR/031024/007111 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: form 5.pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: form 6.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Architect report.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Report-06-Er.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf20 Feb 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Dec 2025.pdf20 Feb 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Dec 2025.pdf20 Feb 2026
Q3 2025-26 Water supply and sewage board20 Feb 2026
Q3 2025-26 KPTCL- BESCOM20 Feb 2026
Query1 - P&L, BS and ITR for 2020-21, 2021-22, 2022-23 with CA UDINFile: 1_ITR_PL_BalSheet_with_CAUDIN_3_years.pdf28 Aug 2024
Query3 - CA Certificate in prescribed format Form 1 in new formatFile: 3_CA CERTIFICATE.pdf28 Aug 2024
Query1 - Area details is updated in form according to sanctioned plan which is attached hereFile: 4_LATEST SANCTIONED DRAWING (2).pdf28 Aug 2024
Query2 - Valid Engineer license from Kaup Town Municipal Council applicable for project addressFile: 5_License Kaup.pdf28 Aug 2024
Query3 - Amenities and Common Area details are updated according to sanctioned drawingsFile: 4_LATEST SANCTIONED DRAWING (2).pdf28 Aug 2024
Query3 - Engineer Calculation SheetFile: 4_AREA DETAILS_Sanctioned_drawings.pdf28 Aug 2024
- Source of Funds - Already incurred approval costsFile: PANCHAYATH_ FEES_LABOUR CESS.pdf28 Aug 2024
- Source of Funds - Investment in Land RTCFile: Promoter_Investment_in_Land.pdf28 Aug 2024
Query no 1.3 Profit and loss account, balance sheet, ITR 2021-23 and CA letter 2020-21File: 1_3_PL_BS_ITR_2021_22_23.pdf24 May 2024
Query no 1.1 Bank Account name as per direction circularFile: 1_1_Bank_Account_Name_Changed.pdf24 May 2024
Query no 1.2 Proprietory License and GST RegistrationFile: 1_2_Proprietorship_GST.pdf24 May 2024
Query 1.4 CA KYC and Membership Certificate - with self attestedFile: 1_4_CA_KYC.pdf24 May 2024
Query 1.5 Sources of Funds to complete the project with supporting documentsFile: 1_5_Source_of_Funds.pdf24 May 2024
Query 1.6 CA Certificate in new format Form -01 is uploaded aboveFile: 1_6_CA Certificate_Form_01_New_Format.pdf24 May 2024
Query 2.1 Title / Sale Deed in favour of Land owner for Sy no 142/9File: 2_1_Title_Sale_Deed_fvg_Land_Owner_Sy_No_142_9.pdf24 May 2024
Query no. 2.2 Hissa/Phody for all project sy nos. exccept sy 315/4File: 2_2_Hissa_Phody_All_Project_Sy_Nos.pdf24 May 2024
Query no 2.3 Advocate Search Report for all Project Sy nos.File: 2_3_Advocate Search Report All Project Sy Nos_.pdf24 May 2024
Query no 3.1 Single Plot LayoutFile: 3_1_2_Single Plot Order Layout.pdf24 May 2024
Query no 3.2 Single Plot Layout OrderFile: 3_1_2_Single Plot Order Layout.pdf24 May 2024
Query no 3.3 CDP Map showing the proposed site - is not attached as the project is located outside tFile: 3_3_CDP_Map_Not_applicable.pdf24 May 2024
Query no 3.4 Commencement CertificateFile: 3_4_Commencement_Certificate.pdf24 May 2024
Query no 3.5 - . All legible sanctioned drawings, floor plans, sectional drawings and elevationsFile: 3_5_Drawings_Section_Plan.pdf24 May 2024
Query no 4.1 Area Calculation Sheet certificed by EngineerFile: 4_1_Area_Calculation_Sheet.pdf24 May 2024
Query no. 4.2 Engineers Renewed License certificate by local bodyFile: 4_2_Renewed_Engineers_Licence.pdf24 May 2024
Query no 4.3 Amenities and Common Area Details and Engineer CertificateFile: 4_3_Ammenities_and_Common_Areas.pdf24 May 2024
Query no 4.4 . STP design drawings as per the guidelines of KSPCB NOCFile: 4_4_STP_Design.pdf24 May 2024
Query no 4.5 Visible MESCOM NOC and Water Supply NOCFile: 4_5_MESCOM_WATER_NOC.pdf24 May 2024
Query no 4.6 Self attested Land Cost Calculation SheetFile: 4_6_Land Cost Calculation Sheet.pdf24 May 2024
Query no 4.7 Annexure A to Proforma Allotment Letter is updated and uploaded above,File: 4_7_Allotment_Letter.pdf24 May 2024
Query no 4.8 Proforma for Agreement for Sale as per GOK notification by incorporating details, projeFile: 4_8_AGREEMENT FOR SALE FINAL.pdf24 May 2024
Query No 2 - Proprietorship registration certificate and GST registration certificate is attached.File: SAMRIDDHI BUILDERS LICENCE-merged.pdf9 Apr 2024
Query No 4 - CA KYC and Membership CertificateFile: CA Details KYC and Member Card-merged.pdf9 Apr 2024
Query No 1 - Title/ Sale deed in favour of land owner for Sy no. 142/9, 300/3 and 300/5File: Gift and Release deed-merged-compressed.pdf9 Apr 2024
Query No 2 - Hissa/Phody for all project Sy NosFile: HISSA PHODY.pdf9 Apr 2024
Query No 3 - EC from 29 Dec till date for all project Sy NosFile: Latest EC.pdf9 Apr 2024
Query No. 4 - Local Board Khata for Sy No. 300/2, 300/4, 300/6, 315/4 in the name of Anand John XaviFile: KHATHA AJXD.pdf9 Apr 2024
Query No. 6 - Advocate Search Report for all Sy Nos.File: Advocate Search Report Application.pdf9 Apr 2024
Query No. 7 - Guidance value certificate issued by Sub-Registrar for all project sy nos. - UploadedFile: Guidance Value Certificate.pdf9 Apr 2024
Query No 3 - Upload single plot layoutFile: SINGLE PLOT.pdf9 Apr 2024
Query No 4 - Upload single plot layout order - Uploaded as requiredFile: SINGLE LAYOUT ORDER.pdf9 Apr 2024
Query No 5 - Upload certified carpet area calculation - Architect Certificate is uploadedFile: Architect Area Calculation Certificate.pdf9 Apr 2024
Query No 7 - Upload village map showing the proposed site - Uploaded as requiredFile: Village Map.pdf9 Apr 2024
Query No 8 - Upload commencement certificate - Uploaded as requiredFile: Commencement Certificate.pdf9 Apr 2024
Query No 9 - Upload KSPCB CFE - Uploaded as requiredFile: STP CFE.pdf9 Apr 2024
Query No 10 - Upload all clear legible sanctioned drawings, floor plan, sectional drawings, and elevFile: SANCTIONED DRAWINGS.pdf9 Apr 2024
Query No 2 - Area Calculation Sheet certified by engineerFile: Area Calculation Sheet by Engineer.pdf9 Apr 2024
Query No 4 - Latest self attested copy of renewed engineer licence certificateFile: Engineer License Renewed Certificate-compressed.pdf9 Apr 2024
Query No 6 - Please uploaded the self attested copy of the NOC issued by MESCOM and Water Supply autFile: ELECTRICITY NOC & WATER NOC.pdf9 Apr 2024
Query No 7 - Please upload the land cost calculation sheet as per the guidance value (Self attestedFile: Guidance Value Certificate.pdf9 Apr 2024
Query No 9 - Please update the Annexure A and upload the proforma of allotment letter - Uploaded asFile: Allotment letter final 06-04-2024.pdf9 Apr 2024
Query No 10 - Please mention the project name and project address and upload the project specificatiFile: Arch Engr Certificate with project name.pdf9 Apr 2024
Query No 11 - Please mention the project name and project address and upload the section 3(1) notariFile: SECTION 3(1) AFFIDAVIT.pdf9 Apr 2024
Query No 12 - Updated AFS as requiredFile: proforma latest 06-04-2024.pdf9 Apr 2024
RTC, survey 142/9-
Mutation, survey 142/9-
Encumbrance Certificate, survey 142/9-
Conversion/Alienation Order, survey 142/9-
Sale/Title/Gift Deed, survey 142/9-
Khatha, survey 142/9-
RTC, survey 300/2-
Mutation, survey 300/2-
Encumbrance Certificate, survey 300/2-
Conversion/Alienation Order, survey 300/2-
Sale/Title/Gift Deed, survey 300/2-
Khatha, survey 300/2-

How this compares with Udupi

30%of this project is bookeddistrict median 0%
22%of Udupi projects moved their completion datethis one has not
0%of Udupi registrations have lapsed or been cancelledthis one is on the register

Computed across the 260+ Udupi projects on ReraGenie, from their own filings.

Keep SAMRIDDHI on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Udupi260+ in Udupi

Builder: Samriddhi Builders

Samriddhi Builders has 1 registration on RERA Karnataka, including SAMRIDDHI. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Udupi district page.

Frequently asked questions

What are my rights if SAMRIDDHI is delayed beyond 14 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of SAMRIDDHI?

The registered promoter entity is Samriddhi Builders, a proprietorship as per the filing. Its GSTIN 29AWZPD3629H1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in SAMRIDDHI?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at SAMRIDDHI?

The professionals named in the filing: Architect: Thrivikrama Bhat T & Associates, Architectural consultants & Engineers; Engineer: Shrikar.A. Karanth T & Associates Architectural consultants and Engineers; Chartered Accountant: CA Mahindra Shenoy P. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAMRIDDHI?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAMRIDDHI. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAMRIDDHI to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.