Home / Browse projects / Pune, Maharashtra / Samasta Barajati Gujarathi Mahajan

Registered No litigation declared Others project

Samasta Barajati Gujarathi Mahajan

By Shri Samasta Barajatis Gujrati Mahajan

RG-MH-99524 · RERA P52100054712 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
25 of 25Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Samasta Barajati Gujarathi Mahajan is a Others project by Shri Samasta Barajatis Gujrati Mahajan in Pune, Maharashtra, registered with MahaRERA as P52100054712 on 6 Feb 2024. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 0 of the 25 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameSamasta Barajati Gujarathi Mahajan
  • TypeOthers
  • Location
    • Ravivar Peth
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411002
  • Pincode411002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054712
  • ReraGenie IDRG-MH-99524

Builder

  • NameShri Samasta Barajatis Gujrati Mahajan
  • Entity typeTrust
  • TrusteesJyotiprakash KANHAIYALAL Saraf

Key dates

1 months past promisethis monthRegisteredFeb 2024PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed90 files

Current status

0%0 of 25 units booked
60.0%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A BuildingNA3381624
B BuildingNA11011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

A Building44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks35%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
B Building43%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,400 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on20 Apr 2026

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI2753.18
Proposed, not sanctioned990 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPune City, 181, Budhwar Peth Pune 411002
Estimated costRs 1.54 cr
Cost incurredRs 92.25 lakh
Work done60.0%
BuildingWingEstimatedIncurred
A BuildingNARs 1.00 crRs 92.25 lakh
B BuildingNARs 38.39 lakh-
-NARs 15.38 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Shripad Padhye
EngineerMr Chirag Yogesh Mehta
Chartered AccountantCA Shete Shete and Co Shete
PartnerRole in project
Shri Samasta Barajatis Gujrati Mahajan-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Apr 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: CC (1).pdf27 Apr 2026
Layout approvalFile: 1 (2)_compressed.pdf27 Apr 2026
Building plan approvalFile: 2_compressed.pdf27 Apr 2026
Building plan approvalFile: 3_compressed.pdf27 Apr 2026
Building plan approvalFile: 4_compressed.pdf27 Apr 2026
Building plan approvalFile: 5_compressed.pdf27 Apr 2026
Building plan approvalFile: 6_compressed.pdf27 Apr 2026
Building plan approvalFile: 7_compressed.pdf27 Apr 2026
Building plan approvalFile: 8_compressed.pdf27 Apr 2026
Withdrawal Update Form 1File: Architect certificate (2).pdf27 Apr 2026
Withdrawal Update Form 1File: Architect certificate (2).pdf27 Apr 2026
Withdrawal Update Form 1File: Architect certificate (1).pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 - Gujarati.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2 - Gujarati.pdf27 Apr 2026
Withdrawal Update Form 2File: Form 2-Gujarathi March 2026 (1).pdf27 Apr 2026
Withdrawal Update Form 3File: SIGNED FORM RERA FINAL.pdf27 Apr 2026
Withdrawal Update Form 3File: SIGNED FORM RERA FINAL.pdf27 Apr 2026
Withdrawal Update Form 3File: SIGNED FORM RERA FINAL.pdf27 Apr 2026
Form 1File: Form 1 (2) (2).pdf10 Sep 2025
Form 2File: Form 2- Gujrathi.pdf10 Sep 2025
Form 3File: Form 3- Samata.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold-gujrathi.pdf10 Sep 2025
Form 1File: Form 1 (2) (2).pdf10 Sep 2025
Form 2File: Form 2- Gjratgu.pdf10 Sep 2025
Form 3File: Form 3- Samata.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold-gujrathi.pdf10 Sep 2025
Form 1File: Form 1 (2).pdf10 Sep 2025
Form 2File: F2- Gujarati (1).pdf10 Sep 2025
Form 3File: Form 3- Samata.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOld unsold - Gujrati.pdf10 Sep 2025
Form 1File: Form 1 (2).pdf10 Sep 2025
Form 2File: F2- Gujarati.pdf10 Sep 2025
Form 3File: Form 3- Samata.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOld unsold - Gujrati.pdf10 Sep 2025
Form 1File: 2ND STAGE RERA CER SCAN COPY.pdf10 Sep 2025
Form 2File: Form 2- Gujrati (1).pdf10 Sep 2025
Form 3File: FINAL FORM 3 (2).pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: SOld unsold - Gujrati.pdf10 Sep 2025
Form 3File: Form 3- Samata.pdf10 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold-gujrathi.pdf10 Sep 2025
Form 1File: Form 1 (2) (2).pdf10 Sep 2025
Form 2File: Form 2- Gujrathi.pdf10 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2) (2).pdf23 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Samata.pdf23 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Gujrathi.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold unsold-gujrathi.pdf23 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2) (2).pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Samata.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Gjratgu.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: sold Unsold- sept 24.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold-gujrathi.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2).pdf10 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: F2- Gujarati (1).pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: SOld unsold - Gujrati.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Samata.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2ND STAGE RERA CER SCAN COPY.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Gujrati (1).pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL FORM 3 (2).pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Trust.pdf2 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (23).pdf15 Dec 2023
Layout approvalFile: 1.pdf14 Dec 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (8).pdf14 Dec 2023
Building plan approvalFile: 3.pdf14 Dec 2023
Building plan approvalFile: 4.pdf14 Dec 2023
Building plan approvalFile: 5 (15).pdf14 Dec 2023
Building plan approvalFile: 6.pdf14 Dec 2023
Building plan approvalFile: Adobe Scan Nov 28, 2023 (1).pdf14 Dec 2023
PAN CardFile: 1 PAN Card (3).pdf14 Dec 2023
Copy of the legal title reportFile: ilovepdf_merged (19) (1).pdf14 Dec 2023
Copy of the legal title reportFile: Adobe Scan Dec 11, 2023 (2).pdf14 Dec 2023
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance (8) (1).pdf14 Dec 2023
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance (8) (1).pdf14 Dec 2023
Copy of Layout Approval (in case of layout)File: 1.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (8).pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 5 (15).pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf14 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Adobe Scan Nov 28, 2023 (1).pdf14 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC (1).pdf14 Dec 2023

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samasta Barajati Gujarathi Mahajan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ravivar Peth13,700+ in Pune

2 kmSamasta Barajati GujaratCompleted 172Lapsed / revoked 139Other 160Dot size: filed unitsN

Filed coordinates, straight-line distance. 471 registered projects within 2 km.

Builder: Shri Samasta Barajatis Gujrati Mahajan

Shri Samasta Barajatis Gujrati Mahajan has 1 registration on MahaRERA, including Samasta Barajati Gujarathi Mahajan. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Samasta Barajati Gujarathi Mahajan is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samasta Barajati Gujarathi Mahajan?

The registered promoter entity is Shri Samasta Barajatis Gujrati Mahajan, a trust as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samasta Barajati Gujarathi Mahajan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samasta Barajati Gujarathi Mahajan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samasta Barajati Gujarathi Mahajan?

The professionals named in the filing: Architect: Ar Shripad Padhye; Engineer: Mr Chirag Yogesh Mehta; Chartered Accountant: CA Shete Shete and Co Shete. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samasta Barajati Gujarathi Mahajan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samasta Barajati Gujarathi Mahajan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samasta Barajati Gujarathi Mahajan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.