Home / Browse projects / Raigarh, Maharashtra / Samarth
Samarth
RG-MH-66554 · RERA P52000048483 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Samarth is a Others project by Neelkanth Associates in Raigarh, Maharashtra, registered with MahaRERA as P52000048483 on 3 Jan 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 6 months from the original filing. 30 of the 68 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameSamarth
- TypeOthers
- Location
- Panvel
- Old Panvel
- Raigarh
- 410206
- Pincode410206
- RERA no.P52000048483
- ReraGenie IDRG-MH-66554
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Jan 2023
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 30 Jun 2026)
- Buildings1 building record
- Documents filed81 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Samarth | NA | 14 | 14 | 62 | 6 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.
Samarth: 51% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed58
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Samarth | NA | Rs 16.43 cr | Rs 16.43 cr |
| - | NA | Rs 86.46 lakh | Rs 3.93 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEVISE DESIGN |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Chartered Accountant | NB Sayed & Associates |
| Partner | Role in project |
|---|---|
| Neelkanth Associates | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. The project stands at 95% completion. 2. Form B uploaded. 3. PERT for the remaining completion work is uploaded in the Application. 4. The Project got delayed due to following reasons:- a. Shortage of Skilled Labour - The project faced an acute shortage of skilled labour, which adversely affected construction progress. b. Delay in Procurement of Construction Materials - Delays in the procurement and supply of essential construction materials due to supply chain and transportation issues impacted the project schedule. c. Unseasonal and Extreme Weather Conditions - Heavy and unseasonal rainfa
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 12 Nov 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 12 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed81
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Samarth_form 1 _30-06-2026.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Samarth_Form2_Q1_2026-27_20-07-2026_05-14.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Samarth_Form3_Q1_2026-27_18-07-2026_11-25_doc1.pdf | 20 Jul 2026 |
| Form 1File: Form 1 - Samarth as on March 2026.pdf | 11 Jun 2026 |
| Form 2File: Form 2 - Samarth as on March 2026.pdf | 11 Jun 2026 |
| Form 3File: Form 3 - Samarth as on March 2026.pdf | 11 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Samarth as on march 2026_____.pdf | 11 Jun 2026 |
| Form 5 (FY 2023-2024)File: Samarth 2023-2024.pdf | 5 Jun 2026 |
| Form 5 (FY 2024-2025)File: Samarth 2024-2025.pdf | 5 Jun 2026 |
| Form 1File: Form 1 - Samarth as on Sep 2025.pdf | 3 Jun 2026 |
| Form 2File: Form 2 - Samarth as on June 2025.pdf | 3 Jun 2026 |
| Form 3File: Form 3 - Samarth as on June 2025.pdf | 3 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Samarth as on June 2025.pdf | 3 Jun 2026 |
| Form 1File: Form 1 - Samarth as on Sep 2025.pdf | 3 Jun 2026 |
| Form 2File: Form 2 - Samarth as on Sep 2025.pdf | 3 Jun 2026 |
| Form 3File: Form 3 - Samarth as on Sep 2025.pdf | 3 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Samarth as on Sep 2025.pdf | 3 Jun 2026 |
| Form 1File: Form 1 - Samarth as on Sep 2025.pdf | 1 Jun 2026 |
| Form 2File: Form 2 - Samarth as on Sep 2025.pdf | 1 Jun 2026 |
| Form 3File: Form 3 - Samarth as on Sep 2025.pdf | 1 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Samarth as on Sep 2025.pdf | 1 Jun 2026 |
| Form 1File: Form 1 - Samarth as on Dec 2025.pdf | 1 Jun 2026 |
| Form 2File: Form 2 - Samarth as on Dec 2025.pdf | 1 Jun 2026 |
| Form 3File: Form 3 - Samarth as on Dec 2025.pdf | 1 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Samarth as on Dec 2025.pdf | 1 Jun 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on 31st December 2024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on Dec 2024.pdf | 13 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on Sep 2024.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on Sep 2024.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on June 2024.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: gggggg.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on 30-06-2024.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on March 2024.pdf | 22 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on 31-03-2024.pdf | 22 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Engineer’s Certificate on Cost Incurred on Project (Form 2) (1).pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: d.pdf | 20 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Samarth as on Dec 2023.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on Dec 2023.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on Dec 2023.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on March 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on June 2023.pdf | 14 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Samarth as on Sept 2023.pdf | 14 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on March 2023.pdf | 14 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on June 2023.pdf | 14 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on Sept 2023.pdf | 14 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf | 27 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAMARTH - March 2023.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Samarth - June 2023.pdf | 26 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Samarth as on 21-10-2023.pdf | 23 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Samarth as on Sept 2023.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on 30-09-2023.pdf | 16 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samarth Mar 23 - Form 2.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Samarth Jun 23 - Form 2.pdf | 11 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on 31-03-2023.pdf | 10 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Samarth as on 30-06-2023.pdf | 10 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5- Samarth as on 2022-23.pdf | 30 Sep 2023 |
| Proforma of Agreement for saleFile: Draft AFS_Neelkanth Associates_Samarth_12_12_2022.pdf | 17 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf | 17 Dec 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Agreement for sale_11zon.pdf | 17 Dec 2022 |
| Proforma of Allotment letterFile: Allotment Letter_Neelkanth Associates_Samarth_21_11_2022.pdf | 6 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (2).pdf | 5 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: deviation report - allotment letter.pdf | 5 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER - FINANCE.pdf | 24 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER - LEGAL.pdf | 24 Nov 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER - FINANCE.pdf | 24 Nov 2022 |
| Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER - LEGAL.pdf | 24 Nov 2022 |
| Declaration about Commencement CertificateFile: FORMAT D.pdf | 24 Nov 2022 |
| Declaration in FORM BFile: AFFIDEVIT - N ASSOCIATES_rotated.pdf | 24 Nov 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200252407648_For_Asset_Based_Search_17_11_2022_11_44_40_195.pdf | 17 Nov 2022 |
| Layout approvalFile: BUILDING PLAN.pdf | 12 Nov 2022 |
| Building plan approvalFile: BUILDING PLAN 1_merged.pdf | 12 Nov 2022 |
| PAN CardFile: NEELKANTH ASSOCIATES PAN CARD.pdf | 12 Nov 2022 |
| Copy of the legal title reportFile: LEGAL TITEL REPORT.pdf | 12 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: BUILDING PLAN.pdf | 12 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN 1_merged.pdf | 12 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 6 other registrations, which the RERA portal never shows together
- All 81 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Samarth on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Old Panvel5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Neelkanth Associates
NEELKANTH ASSOCIATES has 7 registrations on MahaRERA, including NEELKANTH ROYALE PALMS - F WING PHASE II and SHREE RAM KALPANA. Its filings disclose 8 earlier MahaRERA projects: declares 4 of 6 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Samarth is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Samarth?
The registered promoter entity is Neelkanth Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Samarth?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Samarth?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Samarth?
The professionals named in the filing: Architect: DEVISE DESIGN; Engineer: SK Consultants & Engineers; Chartered Accountant: Pranav Bhaskaran & Associates; Chartered Accountant: NB Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Samarth?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback