ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / Samarth Enclave

Registered No litigation declared Residential / Group Housing project

Samarth Enclave

By Shashikant Tukaram Patil

RG-MH-06708 · RERA P99000054500 · Last updated on MahaRERA portal: 3 Sep 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Oct 2028Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Stilt Floor, 80%
57 of 162Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

Samarth Enclave is a Residential / Group Housing project by Shashikant Tukaram Patil in Palghar, Maharashtra, registered with MahaRERA as P99000054500 on 25 Jan 2024. Possession is promised by 31 Oct 2028. 105 of the 162 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameSamarth Enclave
  • TypeResidential / Group Housing
  • Location
    • Mancel Pada Road
    • Virar
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401305
  • Pincode401305
  • RERA no.P99000054500
  • ReraGenie IDRG-MH-06708

Builder

  • NameShashikant Tukaram Patil
  • Entity typeIndividual
  • PartnersSwapnil Shashikant Patil, Shashikant Tukaram Patil

Key dates

this monthRegisteredJan 2024PromisedOct 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Jan 2024
  • Promised completion31 Oct 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed94 files

Current status

65%105 of 162 units booked
88.9%Work done, per cost certificate

Figures as on 3 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Samarth EnclaveNA881620162

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 80%.

Samarth Enclave: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)-
Podiums (if any)-
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,038 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2026

Approvals and building plan

Sanctioning authorityVVMC
Permissible FSI7089.31
Proposed, not sanctioned7,089 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVirar
Estimated costRs 18.48 cr
Cost incurredRs 16.44 cr
Work done88.94%
BuildingWingEstimatedIncurred
Samarth EnclaveNARs 18.18 crRs 16.36 cr
-NARs 30.00 lakhRs 7.50 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAbhay Raut
EngineerApurva Velani
Chartered AccountantPatade and Associates
Chartered AccountantChetan Kadam
PartnerRole in project
Shashikant Tukaram Patil-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Nov 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Nov 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 6 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2028

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 3File: Form 3.pdf3 Sep 2026
Form 1File: Form 1 ARCHITECTS CERTIFICATES nov 24.pdf16 Aug 2026
Form 2File: Form 2 ENGINEER CERTIFICATE Sept 2024 Upoaded.pdf16 Aug 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD June 2026.pdf16 Aug 2026
Form 3File: merged form 3 final.pdf16 Aug 2026
Form 1File: Form 1 ARCHITECTS CERTIFICATES nov 24.pdf16 Aug 2026
Form 2File: Form 2 ENGINEER CERTIFICATE Sept 2024 Upoaded.pdf16 Aug 2026
Form 3File: form 3 CA certificate compressed.pdf16 Aug 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD June 2026.pdf16 Aug 2026
Form 1File: Form 1 ARCHITECTS CERTIFICATES nov 24.pdf16 Aug 2026
Form 2File: Form 2 ENGINEER CERTIFICATE Sept 2024 Upoaded.pdf16 Aug 2026
Form 3File: form 3 CA certificate compressed.pdf16 Aug 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD June 2026.pdf16 Aug 2026
Form 1File: Annex A Architech Certificate DEc 2025.pdf16 Aug 2026
Form 2File: 130126 - Engineers Certificate.pdf16 Aug 2026
Form 3File: form 3 CA certificate compressed.pdf16 Aug 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD June 2026.pdf16 Aug 2026
Form 1File: Form 1 Signed.pdf16 Aug 2026
Form 2File: Form 2 Signed.pdf16 Aug 2026
Form 3File: FROM 3 signed.pdf16 Aug 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD June 2026.pdf16 Aug 2026
Form 2A (FY 2023-2024)File: 100326 - Engr Quality Assurance Form-2A.pdf16 Aug 2026
Form 2A (FY 2024-2025)File: 100326 - Engr Quality Assurance Form-2A.pdf16 Aug 2026
Form 5 (FY 2023-2024)File: rera account opening details.pdf16 Aug 2026
Form 5 (FY 2024-2025)File: Form 5.pdf14 Aug 2026
Form 5 (FY 2025-2026)File: Form 5 25 26.pdf14 Aug 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf12 Aug 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf12 Aug 2026
Withdrawal Update Form 3File: FROM 3 signed.pdf12 Aug 2026
Withdrawal Update Form 1File: Form 1 Signed.pdf11 Aug 2026
Withdrawal Update Form 2File: Form 2 Signed.pdf11 Aug 2026
Withdrawal Update Form 3File: FROM 3 signed.pdf11 Aug 2026
Form 2A (FY 2025-2026)File: Form 2A March 2026 Signed.pdf11 Aug 2026
Withdrawal Update Form 1File: Annex A Architech Certificate DEc 2025.pdf9 Aug 2026
Withdrawal Update Form 2File: 130126 - Engineers Certificate.pdf9 Aug 2026
Withdrawal Update Form 3File: form 3 CA certificate compressed.pdf9 Aug 2026
Withdrawal Update Form 1File: Annex A Architech Certificate DEc 2025.pdf7 Mar 2026
Withdrawal Update Form 1File: Annex A Architech Certificate DEc 2025.pdf7 Mar 2026
Withdrawal Update Form 1File: Annex A Architech Certificate DEc 2025.pdf7 Mar 2026
Withdrawal Update Form 1File: Annex A Architech Certificate DEc 2025.pdf7 Mar 2026
Withdrawal Update Form 2File: 130126 - Engineers Certificate.pdf7 Mar 2026
Withdrawal Update Form 2File: 130126 - Engineers Certificate.pdf7 Mar 2026
Withdrawal Update Form 2File: 130126 - Engineers Certificate.pdf7 Mar 2026
Withdrawal Update Form 2File: 130126 - Engineers Certificate.pdf7 Mar 2026
Withdrawal Update Form 3File: form 3 CA certificate compressed.pdf7 Mar 2026
Withdrawal Update Form 3File: form 3 CA certificate compressed.pdf7 Mar 2026
Withdrawal Update Form 3File: form 3 CA certificate compressed.pdf7 Mar 2026
Withdrawal Update Form 3File: form 3 CA certificate compressed.pdf7 Mar 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECTS CERTIFICATES Aug 2024.pdf9 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFICATE Sept 2024.pdf9 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: merged form 3 final.pdf19 Dec 2023
Proforma of Allotment letterFile: allotment letter as per rera.pdf19 Dec 2023
Deviation Report with respect to Allotment letterFile: Declaration No deviation Deviation Report Allotment letter.pdf19 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf19 Dec 2023
Other - TechnicalFile: clarification.pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: no encumberance certificate-legal.pdf18 Dec 2023
Details of encumbrances concerned to LegalFile: no encumberance certificate-legal.pdf18 Dec 2023
Other - LegalFile: 1 Release deed 1 compressed.pdf18 Dec 2023
Other - LegalFile: 2 Hakh Sod Patra compressed.pdf18 Dec 2023
Building plan approvalFile: CC approval order- CC Order comp.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: no encumberance certificate-1.pdf6 Dec 2023
Details of encumbrances concerned to FinanceFile: legal title report lawyer comp.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: no encumberance certificate-1.pdf6 Dec 2023
Details of encumbrances concerned to LegalFile: legal title report lawyer comp.pdf6 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: CC approval order- CC Order comp.pdf6 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC approval order- CC Order comp.pdf6 Dec 2023
Declaration about Commencement CertificateFile: Format D DECLARATION ABOUT COMMENCEMNT CERTIFICATE- new.pdf6 Dec 2023
Declaration in FORM BFile: Form B Affidavit Cum Declaration.pdf6 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch certificate Final.pdf6 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Final Compressed.pdf6 Dec 2023
CERSAI detailsFile: CERSAI_Search_Report_200289210777_For_Asset_Based_Search_06_12_2023_12_17_04_587.pdf6 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest-1.pdf6 Dec 2023
Proforma of Agreement for saleFile: Sale Agreement comp-01-12 (1).pdf6 Dec 2023
Proforma of Agreement for saleFile: Sale Agreement comp-13-26 (1).pdf6 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account for real estate projects updated.pdf6 Dec 2023
Layout approvalFile: 1-1.pdf28 Nov 2023
Layout approvalFile: 2-2.pdf28 Nov 2023
Layout approvalFile: 3-3.pdf28 Nov 2023

How this compares with Palghar

65%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Samarth Enclave on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Virar3,200+ in Palghar

Builder: Shashikant Tukaram Patil

Shashikant Tukaram Patil has 1 registration on MahaRERA, including Samarth Enclave. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Samarth Enclave is delayed beyond 31 Oct 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Samarth Enclave?

The registered promoter entity is Shashikant Tukaram Patil, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Samarth Enclave?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Samarth Enclave?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Samarth Enclave?

The professionals named in the filing: Architect: Abhay Raut; Engineer: Apurva Velani; Chartered Accountant: Patade and Associates; Chartered Accountant: Chetan Kadam. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Samarth Enclave?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Samarth Enclave. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Samarth Enclave to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.