Home / Browse projects / Thane, Maharashtra / Samadhan Co op Hsg Soc Ltd
Samadhan Co op Hsg Soc Ltd
RG-MH-05765 · RERA P51700052264 · Last updated on MahaRERA portal: 7 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 12 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Samadhan Co op Hsg Soc Ltd is a Others project by SHUBH ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700052264 on 9 Aug 2023. Possession was promised by 31 Oct 2025 and is now 12 months past that date. 42 of the 61 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.
At a glance
Project
- NameSamadhan Co op Hsg Soc Ltd
- TypeOthers
- Location
- Katrap
- Badlapur (M Cl)
- Ambarnath
- Thane
- 421503
- Pincode421503
- RERA no.P51700052264
- ReraGenie IDRG-MH-05765
Builder
- NameSHUBH ASSOCIATES
- Entity typePartnership
- PartnersRUPESH PARSHURAM DALAL, RAKESH PARSHURAM DALAL, ISHWAR NARAYAN PATEL, BHARAT NARAYAN PATEL, SURDAS DHARMA PATIL, SURESH NARAYAN PATEL
- Other registrations4 more →
- Completed2 of 5
- No longer live3 lapsed, de-registered or revoked
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2023
- Promised completion31 Oct 2025
- Revised completionNone
- Buildings2 building records
- Documents filed70 files
Current status
Figures as on 7 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 7 | 7 | 14 | 4 | 18 |
| WING B | NA | 8 | 8 | 41 | 2 | 43 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is External plumbing and external plaster, at 80%.
WING A79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
WING B79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 70% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 40% |
Progress on shared amenities15
As on 7 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed6
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership7
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Samadhan Co op Hsg Soc Ltd | Badlapur (M Cl) | Thane |
| Ratnadeep Gopa Kedar | Badlapur (M Cl) | Thane |
| BHAGWAN GOBA KEDAR | Badlapur (M Cl) | Thane |
| PRADNYA YASHWANT PAGARE | Badlapur (M Cl) | Thane |
| JAYASHREE VIJAY PAGARE | Badlapur (M Cl) | Thane |
| ANAND GOBA KEDAR | Badlapur (M Cl) | Thane |
| SHUDDHODHAN GOBA KEDAR | Badlapur (M Cl) | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 5.85 cr | Rs 5.26 cr |
| WING B | NA | Rs 5.85 cr | Rs 5.26 cr |
| - | NA | Rs 55.00 lakh | Rs 13.75 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | RAJ ASSOCIATES ARCHITECT & ENGINEERS |
| Engineer | SV PATEL |
| Chartered Accountant | Priyottam Ghaisas |
| Chartered Accountant | GAJANAN MORESHWAR GHAISAS |
| Partner | Role in project |
|---|---|
| SHUBH ASSOCIATES | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Jul 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 May 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 May 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 May 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed70
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 - Architect Certificate Sept 2025 - Samadhan (1).pdf | 7 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 - Architect Certificate Sept 2025 - Samadhan (1).pdf | 7 Jan 2026 |
| Withdrawal Update Form 2File: engineer certificate sept 25.pdf | 7 Jan 2026 |
| Withdrawal Update Form 2File: engineer certificate sept 25.pdf | 7 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate - Sept 2025.pdf | 7 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - CA Certificate - Sept 2025.pdf | 7 Jan 2026 |
| Form 2A (FY 2024-2025)File: FORM 2A - Samadhan 01.04.2024 to 31.03.2025.pdf | 4 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form 2A - Samadhan - 09.08.2023 to 31.03.2024.pdf | 4 Aug 2025 |
| Form 2A (FY 2025-2026)File: Form 2A - Samadhan - 01.04.2025 to 31.03.2026 (1).pdf | 4 Aug 2025 |
| Form 1File: Architect Certificate - Form 1 - Q1 2025-26.pdf | 23 Jul 2025 |
| Form 2File: Engg Certificate - Form 2 - Q1 2025-26.pdf | 23 Jul 2025 |
| Form 3File: CA Certificate - Form 3 - Q1 - 2025-26.pdf | 23 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexure - Q1 2025-26 (1).pdf | 23 Jul 2025 |
| Form 1File: 300923 Architect Certificate.pdf | 15 Jul 2025 |
| Form 2File: RERA CERTIFICATE DATED 300923.pdf | 15 Jul 2025 |
| Form 3File: Form 3 - Samadhan - July - Sept 23.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture - 23-24 q2.pdf | 15 Jul 2025 |
| Form 1File: 311223 Architect Certificate.pdf | 15 Jul 2025 |
| Form 2File: RERA CERTIFICATE DATED 311223.pdf | 15 Jul 2025 |
| Form 3File: Form 3 - Samadhan - Oct - Dec 23.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture - 23-24 q3.pdf | 15 Jul 2025 |
| Form 1File: 310324 Architect Certificate.pdf | 15 Jul 2025 |
| Form 2File: RERA CERTIFICATE DATED 310324.pdf | 15 Jul 2025 |
| Form 3File: Form 3 - Samadhan - Jan - March 24.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture -23-24 q4.pdf | 15 Jul 2025 |
| Form 1File: Architect Certificate 12062024.pdf | 15 Jul 2025 |
| Form 2File: 1656RERA CERTIFICATE 170624.pdf | 15 Jul 2025 |
| Form 3File: Form 3 Samadhan Fund Transfer 280624_compressed.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture - 24-25 q1.pdf | 15 Jul 2025 |
| Form 1File: Architect CertificateSamadhan 30092024.pdf | 15 Jul 2025 |
| Form 2File: Engg CertificateQ2 2024-25.pdf | 15 Jul 2025 |
| Form 3File: Form 3 - Samadhan -Q2 2024-25.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture - 24-25 q2.pdf | 15 Jul 2025 |
| Form 1File: Architect Certi 31122024.pdf | 15 Jul 2025 |
| Form 2File: Engg CertificateQ3 2024-25.pdf | 15 Jul 2025 |
| Form 3File: Form 3 Oct Dec 24 Shubh Associates.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture - 24-25 q3.pdf | 15 Jul 2025 |
| Form 1File: Architect Certificate FORM 1 31032025.pdf | 15 Jul 2025 |
| Form 2File: Engg CertificateQ3 2024-25.pdf | 15 Jul 2025 |
| Form 3File: Form 3 - CA Certificate - Q4 24-25.pdf | 15 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Annexture -24-25 Q4.pdf | 15 Jul 2025 |
| Copy of the legal title reportFile: 2 Copy of the legal title report (4)_page-0001.pdf | 25 Jul 2023 |
| CERSAI detailsFile: Cersai declaration - samadhan.pdf | 17 Jun 2023 |
| Layout approvalFile: scan document 10339_compressed.pdf | 19 May 2023 |
| Building plan approvalFile: scan document 10339_compressed.pdf | 19 May 2023 |
| Copy of Layout Approval (in case of layout)File: scan document 10339_compressed.pdf | 19 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan document 10339_compressed.pdf | 19 May 2023 |
| Details of encumbrances concerned to FinanceFile: Self Declaration - Litigation Encumbrances.pdf | 9 May 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration - Litigation Encumbrances.pdf | 9 May 2023 |
| CERSAI detailsFile: GetUserDocumentFileContent.pdf | 2 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 samadhan.pdf | 2 May 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: annexure A interest_compressed.pdf | 2 May 2023 |
| Proforma of Allotment letterFile: Model Form of Allotment Le.pdf | 2 May 2023 |
| Layout approvalFile: scan document 10338_compressed.pdf | 1 May 2023 |
| Building plan approvalFile: scan document 10338_compressed.pdf | 1 May 2023 |
| PAN CardFile: Pan Card (Shubh Associate).pdf | 1 May 2023 |
| Copy of the legal title reportFile: Title Certificate.pdf | 1 May 2023 |
| Details of encumbrances concerned to FinanceFile: Self Declaration - Finance Encumbrances.pdf | 1 May 2023 |
| Details of encumbrances concerned to LegalFile: Self Declaration - Finance Encumbrances.pdf | 1 May 2023 |
| Copy of Layout Approval (in case of layout)File: scan document 10338_compressed.pdf | 1 May 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: scan document 10338_compressed.pdf | 1 May 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement crti_compressed.pdf | 1 May 2023 |
| Declaration about Commencement CertificateFile: Format D revised.pdf | 1 May 2023 |
| Declaration in FORM BFile: Form B - Partners_compressed.pdf | 1 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 1 May 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate (2).pdf | 1 May 2023 |
| Proforma of Agreement for saleFile: BLANK AGREEMENT.pdf | 1 May 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - declaration - Rera collection Account.pdf | 1 May 2023 |
| Deviation Report with respect to Allotment letterFile: Self Declaration - Allotment Letter.pdf | 1 May 2023 |
| Deviation Report with respect to model copy of AgreementFile: Self Declaration - Agreement For Sale.pdf | 1 May 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 4 other registrations, which the RERA portal never shows together
- All 70 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Samadhan Co op Hsg Soc Ltd on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Katrap7,600+ in Thane
PRADHAN MANTRI AWAS YOJANA - URBAN
KULGAON BADLAPUR MUNICIPAL COUNCIL
Mohan Alcoves I
MOHAN LIFESPACES LLP
MANOHAR VIKAS SHREEJI PARAISO PHASE - 2
DEEPLAXMI DEVELOPERS
SHREEJI MILESTONE
DEEP LAXMI ASSOCIATES
Mohan Willows III
MOHAN LIFESPACES LLP
SHREEJI SQUARE PHASE I
SHREEJI DEVELOPERS
See every Thane project, with the district possession charts
Builder: SHUBH ASSOCIATES
SHUBH ASSOCIATES has 5 registrations on MahaRERA, including VINAYRAJ REGENCY and Shubh Aarambh. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What does it mean that Samadhan Co op Hsg Soc Ltd shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Samadhan Co op Hsg Soc Ltd is delayed beyond 31 Oct 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Samadhan Co op Hsg Soc Ltd?
The registered promoter entity is SHUBH ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Samadhan Co op Hsg Soc Ltd?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Samadhan Co op Hsg Soc Ltd?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Samadhan Co op Hsg Soc Ltd?
The professionals named in the filing: Architect: RAJ ASSOCIATES ARCHITECT & ENGINEERS; Engineer: SV PATEL; Chartered Accountant: Priyottam Ghaisas; Chartered Accountant: GAJANAN MORESHWAR GHAISAS. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Samadhan Co op Hsg Soc Ltd?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback