ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SALASAR SHEETAL SANGEET

Registered No litigation declared Others project

SALASAR SHEETAL SANGEET

By SALASAR LIFESPACES

RG-MH-06521 · RERA P51700052552 · Last updated on MahaRERA portal: 12 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Internal walls, 70%
75 of 105Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

SALASAR SHEETAL SANGEET is a Others project by SALASAR LIFESPACES in Thane, Maharashtra, registered with MahaRERA as P51700052552 on 11 Sep 2023. Possession is promised by 31 Dec 2027. 30 of the 105 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSALASAR SHEETAL SANGEET
  • TypeOthers
  • Location
    • NA
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700052552
  • ReraGenie IDRG-MH-06521

Builder

  • NameSALASAR LIFESPACES
  • Entity typePartnership
  • PartnersANAND RAMPRASAD AGRAWAL, RAVI VASUDEV VYAS, SURESH JAGDISH KHANDELWAL

Key dates

this monthRegisteredSep 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Sep 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

29%30 of 105 units booked
37.5%Work done, per cost certificate

Figures as on 12 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SALASAR SHEETAL SANGEETNA17169213105

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

SALASAR SHEETAL SANGEET: 50% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed121

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots121
Closed/Covered121

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,640 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Nov 2025
LandownerVillageDistrict
SHEETAL SANGEET CO-OPERATIVE HOUSING SOCIETYMira-Bhayandar (M Corp.)Thane

Approvals and building plan

Sanctioning authorityMira-Bhayandar Municipal Corporation
Permissible FSI8758.6
Proposed, not sanctioned6,259 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMIRA ROAD EAST
Estimated costRs 40.00 cr
Cost incurredRs 15.00 cr
Work done37.5%
BuildingWingEstimatedIncurred
SALASAR SHEETAL SANGEETNARs 35.00 crRs 15.00 cr
-NARs 5.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAR ANISH
EngineerRAJESH DUBEY
EngineerPREMNATH CHOUGULE
Chartered AccountantCA SANJAY SHARMA
Chartered AccountantCA VIVEK
PartnerRole in project
SALASAR LIFESPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jun 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: HIGHLIGHTED REVISED PLANS - SALASAR SHEETAL SANGEET_smallpdf.pdf12 Jun 2026
Building plan approvalFile: HIGHLIGHTED REVISED PLANS - SALASAR SHEETAL SANGEET_smallpdf.pdf12 Jun 2026
Withdrawal Update Form 1File: FORM 1_ MARCH 26_ SALASAR SHEETAL SANGEET.pdf2 Jun 2026
Withdrawal Update Form 2File: FORM 2_ MARCH 26_ SALASAR SHEETAL SANGEET.pdf2 Jun 2026
Withdrawal Update Form 3File: FORM 3_ MARCH 26_ SALASAR SHEETAL SANGEET_compressed.pdf2 Jun 2026
Form 5 (FY 2024-2025)File: FORM 5_ MARCH 25_ SALASAR SHEETAL SANGEET.pdf10 Apr 2026
Withdrawal Update Form 1File: FORM 1_ DEC 25_ SALASAR SHEETAL SANGEET.pdf9 Apr 2026
Withdrawal Update Form 2File: FORM 2_ DEC 25_ SALASAR SHEETAL SANGEET.pdf9 Apr 2026
Withdrawal Update Form 3File: FORM 3_ DEC 25_ SALASAR SHEETAL SANGEET_compressed.pdf9 Apr 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ SALASAR SHEETAL SANGEET.pdf2 Apr 2026
Withdrawal Update Form 1File: FORM 1_ SEP 25_ SALASAR SHEETAL SANGEET.pdf2 Apr 2026
Withdrawal Update Form 2File: FORM 2_ SEP 25_ SALASAR SHEETAL SANGEET.pdf2 Apr 2026
Withdrawal Update Form 2File: FORM 2_ SEP 25_ SALASAR SHEETAL SANGEET.pdf2 Apr 2026
Withdrawal Update Form 3File: FORM 3_ SEP 25_ SALASAER SHEETAL SANGEET_compressed.pdf2 Apr 2026
Withdrawal Update Form 3File: FORM 3_ SEP 25_ SALASAER SHEETAL SANGEET_compressed.pdf2 Apr 2026
Form 2A (FY 2024-2025)File: FORM 2A.pdf6 Jan 2026
Building plan approvalFile: REVISED PLANS - SALASAR SHEETAL SANGEET.pdf3 Dec 2025
Form 1File: FORM 1_ SEP 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ SEP 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ SEP 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ DEC 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ DEC 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ DEC 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 23_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ MARCH 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ MARCH 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ MARCH 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ JUNE 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ JUNE 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ JUNE 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ SEP 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ SEP 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ SEP 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ DEC 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ DEC 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ DEC 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ DEC 24_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ MARCH 25_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ MARCH 25_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ MARCH 25_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ MARCH 25_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 1File: FORM 1_ JUNE 25_ SHEETAL SANGEET.pdf29 Jul 2025
Form 2File: FORM 2_ JUNE 25_ SHEETAL SANGEET.pdf29 Jul 2025
Form 3File: FORM 3_ JUNE 25_ SLASASAR SHEETAL SANGEET_compressed.pdf29 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 2A (FY 2023-2024)File: FORM 2A_ MARCH 24_ SALASAR LIFE SPACES_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Form 5 (FY 2023-2024)File: FORM 5_ MARCH 24_SALASAR LIFE SPACES_ SALASAR SHEETAL SANGEET.pdf29 Jul 2025
Details of encumbrances concerned to FinanceFile: ENCUMBRANCES OF FIANACE.pdf2 Feb 2025
CERSAI detailsFile: CERSAI.pdf2 Feb 2025
Details of encumbrances concerned to LegalFile: ENCUMBRANCES OF FIANACE.pdf2 Feb 2025
Disclosure for secured/unsecured finance availed for the projectFile: DISCLOSURE.pdf2 Feb 2025
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- SALASAR SHEETAL SANGEET (With Highlight)).pdf7 Sep 2023
Deviation Report with respect to model copy of AgreementFile: deviation for agreement for sale.pdf26 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Aug 2023
Layout approvalFile: 5 Copy of Layout Approval (in case of layout).pdf14 Aug 2023
Building plan approvalFile: 6 Building Plan Approval.pdf14 Aug 2023
PAN CardFile: 1 PAN CARD.pdf14 Aug 2023
Copy of the legal title reportFile: 2 TITLE CERTIFICATE.pdf14 Aug 2023
Details of encumbrances concerned to FinanceFile: 3 a Details of encumbrances concerned to Finance.pdf14 Aug 2023
Details of encumbrances concerned to FinanceFile: 4 b Details of encumbrances concerned to Legal.pdf14 Aug 2023
Details of encumbrances concerned to LegalFile: 3 a Details of encumbrances concerned to Finance.pdf14 Aug 2023
Details of encumbrances concerned to LegalFile: 4 b Details of encumbrances concerned to Legal.pdf14 Aug 2023
Copy of Layout Approval (in case of layout)File: 5 Copy of Layout Approval (in case of layout).pdf14 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: 6 Building Plan Approval.pdf14 Aug 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 Commencement Certificates.pdf14 Aug 2023
Declaration about Commencement CertificateFile: 8 Declaration about Commencement Certificate.pdf14 Aug 2023
Declaration in FORM BFile: 9 Declaration in FORM B.pdf14 Aug 2023
CERSAI detailsFile: 12 CERSAI details.pdf14 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (1).pdf14 Aug 2023
Proforma of Allotment letterFile: 16 Proforma of Allotment letter .pdf14 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 17 Separate Bank Account details including no encumbrances on the Bank Account or no escro14 Aug 2023
Deviation Report with respect to Allotment letterFile: 18 Deviation Report with respect to Allotment letter.pdf14 Aug 2023

How this compares with Thane

29%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SALASAR SHEETAL SANGEET on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmSALASAR SHEETAL SANGEETCompleted 90Lapsed / revoked 73Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 261 registered projects within 2 km.

Builder: SALASAR LIFESPACES

SALASAR LIFESPACES has 1 registration on MahaRERA, including SALASAR SHEETAL SANGEET. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SALASAR SHEETAL SANGEET is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SALASAR SHEETAL SANGEET?

The registered promoter entity is SALASAR LIFESPACES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SALASAR SHEETAL SANGEET?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SALASAR SHEETAL SANGEET?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SALASAR SHEETAL SANGEET?

The professionals named in the filing: Architect: AR ANISH; Engineer: RAJESH DUBEY; Engineer: PREMNATH CHOUGULE; Chartered Accountant: CA SANJAY SHARMA; Chartered Accountant: CA VIVEK. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SALASAR SHEETAL SANGEET?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SALASAR SHEETAL SANGEET. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SALASAR SHEETAL SANGEET to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.