SALASAR GREENS
By SALASAR ESTATE DEVELOPERS LLP
RG-MH-02457 · RERA P51700000586 · Last updated on MahaRERA portal: 11 Nov 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 48 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SALASAR GREENS is a Residential / Group Housing project by SALASAR ESTATE DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700000586 on 18 Jul 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing.
At a glance
Project
- NameSALASAR GREENS
- TypeResidential / Group Housing
- Location
- KANAKIA ROAD
- MIRA ROAD EAST
- BHAYANDAR
- Thane
- 401107
- Pincode401107
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700000586
- ReraGenie IDRG-MH-02457
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on18 Jul 2017
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 25 Dec 2022)
- Buildings1 building record
- Documents filed82 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SALASAR GREENS | NA | 9 | 7 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 11 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
SALASAR GREENS: 36% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 11 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed14
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANISH & ASSOCIATES |
| Engineer | PROTECH CONSULTANTS |
| Engineer | PREMNATH CHOUGULE |
| Chartered Accountant | CA SANJAY SHARMA |
| Chartered Accountant | CA VIVEK THAR |
| Partner | Role in project |
|---|---|
| SALASAR ESTATE DEVELOPERS LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Pending Court Litigation the construction work was stopped. We will resume the Construction activities once we receive the Court order.
Litigation declared1
| Case | Court | Status |
|---|---|---|
| 954/2016/2016 | CIVIL COURT | PENDING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jun 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jun 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Jun 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Jun 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed82
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: FORM 1_ JUNE 25_ SALASAR GREENS.pdf | 11 Nov 2025 |
| Form 2File: FORM 2_ JUNE 25_ SALASAR GREENS.pdf | 11 Nov 2025 |
| Form 3File: FORM 3_ JUNE 25_ SALASAR GREENS_compressed.pdf | 11 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ SALASAR GREENS.pdf | 11 Nov 2025 |
| Form 1File: FORM 1_ SEP 25_ SALASAR GREENS.pdf | 11 Nov 2025 |
| Form 2File: FORM 2_ SEP 25_ SALASAR GREENS.pdf | 11 Nov 2025 |
| Form 3File: FORM 3_ SEP 25_ SALASAR GREENS_compressed.pdf | 11 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ SEP 25_ SALASAR GREENS.pdf | 11 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ SALASAR GREENS.pdf | 6 Oct 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ JUNE 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ DEC 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25_ SALASAR GREENS.pdf | 13 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ SEP 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ MARCH 24_ SALASAR GREENS_compressed.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ MARCH 25_ SALASAR GREENS_compressed.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ DEC 24_ SALASAR GREENS_compressed.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ SEP 24_ SALASAR GREENS_compressed.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ JUNE 24_ SALASAR GREENS_compressed.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ DEC 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of CA (Form 3)File: FORM 3_ SEP 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ SEP 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ MARCH 25_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ DEC 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ SEP 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ JUNE 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ MARCH 24.pdf | 13 May 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2_ DEC 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 23_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ JUNE 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ SEP 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ DEC 24_ SALASAR GREENS.pdf | 13 May 2025 |
| Disclosure of sold/ booked inventoryFile: SLD UNSOLD_ MARCH 25_ SALASAR GREENS.pdf | 13 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A_ MARCH 20_ SALASAR GREENS.pdf | 12 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A_ MARCH 21_ SALASAR GREENS.pdf | 12 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A_ MARCH 22_ SALASAR GREENS.pdf | 12 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A_ MARCH 23_ SALASAR GREENS.pdf | 12 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_ MARCH 24.pdf | 12 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2024-25)File: FORM 5_ MARCH 24_SALASAR ESTATE DEVELOPERS LLP_SALASAR GREENS.pdf | 12 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-SALASAR GREENS_22-23.pdf | 4 Mar 2024 |
| Declaration in FORM BFile: FORM B.pdf | 28 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SALASAR GREENS_JUN 23P.pdf | 25 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-SALASAR GREENS_JUN 23.pdf | 25 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-SALASAR GREENS_22 23.pdf | 25 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-SALASAR GREENS_JUN 23.pdf | 25 Aug 2023 |
| Certificates of CA (Form 3)File: FORM 3 GREENS.pdf | 25 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SALASAR GREENS_JUN 23P.pdf | 17 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-SALASAR GREENS_JUN 23.pdf | 17 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-SALASAR GREENS_22 23.pdf | 17 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-SALASAR GREENS_JUN 23.pdf | 17 Aug 2023 |
| Certificates of CA (Form 3)File: FORM 3-SALASAR GREENS_JUN 23.pdf | 17 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 2019-2020.pdf | 6 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 2020-2021.pdf | 6 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 2021-2022.pdf | 6 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FORM 2A-SALASAR GREENS_MAR 23.pdf | 5 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: FORM 2A-SALASAR GREENS_MAR 23.pdf | 5 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A-SALASAR GREENS_MAR 23.pdf | 5 Jun 2023 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT CC-SALASAR GREENS.pdf | 4 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SALASAR GREENS_MAR 23.pdf | 4 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-SALASAR GREENS_DEC 22.pdf | 4 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-SALASAR GREENS_MAR 23.pdf | 4 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD BOOKED-SALASAR GREENS_MAR 23.pdf | 4 Jun 2023 |
| CERSAI detailsFile: CERSAI-SALASAR GREENS.pdf | 4 Jun 2023 |
| Certificates of CA (Form 3)File: FORM 3-SALASAR GREENS_MAR 23_compressed.pdf | 4 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: SED Salasar Greens MahaRERA Form 5 CA Certificate 29092018.PDF | 4 Dec 2019 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: SED Salasar Greens MahaRERA Form 5 CA Certificate 04112019.PDF | 4 Dec 2019 |
| Proforma of Allotment letterFile: Performa of agreement.pdf | 17 Jul 2017 |
| Declaration in FORM BFile: FROM 'B' (SALASAR GREENS).pdf | 8 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Cert (SG)2.pdf | 6 Jul 2017 |
| Certificates of CA (Form 3)File: CA certificate SG2.pdf | 6 Jul 2017 |
| Layout approvalFile: salasar greens1.pdf | 21 Jun 2017 |
| Building plan approvalFile: IOD.pdf | 21 Jun 2017 |
| PAN CardFile: PAN CARD.pdf | 21 Jun 2017 |
| Copy of the legal title reportFile: LEGAL TITLE REPORT.pdf | 21 Jun 2017 |
| Details of encumbrancesFile: INDEX II DEVELOPMENT AGREEMENT.pdf | 21 Jun 2017 |
| Copy of Layout Approval (in case of layout)File: salasar greens1.pdf | 21 Jun 2017 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SALASAR ASSOCIATES | OPP. D'MART. | 1 | Completed | Feb 2015 | Late, May 2015 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 82 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SALASAR GREENS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MIRA ROAD EAST7,600+ in Thane
Filed coordinates, straight-line distance. 253 registered projects within 2 km.
Codename StarLife
JP Infra Realty Private Limited
Prestige Garden Trails
PRESTIGE ESTATES PROJECTS LIMITED
TIARA HILLS PHASE I BLDG NO 3, 5 AND 2
PNK SPACE DEVELOPMENT PVT LTD
The Palace Tower B
JP Infra Realty Private Limited
Sector 2A - Wings JKL
Eversmile Properties Private Limited
CRESCENT WTC - WESTERN TRADE CENTER - PHASE -
CRESCENT SHELTERS
See every Thane project, with the district possession charts
Builder: SALASAR ESTATE DEVELOPERS LLP
SALASAR ESTATE DEVELOPERS LLP has 2 registrations on MahaRERA, including SALASAR GREENS and SALASAR WOODS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if SALASAR GREENS is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SALASAR GREENS?
The registered promoter entity is SALASAR ESTATE DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SALASAR GREENS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SALASAR GREENS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SALASAR GREENS?
The professionals named in the filing: Architect: ANISH & ASSOCIATES; Engineer: PROTECH CONSULTANTS; Engineer: PREMNATH CHOUGULE; Chartered Accountant: CA SANJAY SHARMA; Chartered Accountant: CA VIVEK THAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SALASAR GREENS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback