ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / SALASAR EXOTICA - I

Completed No litigation declared Residential / Group Housing project

SALASAR EXOTICA - I

By Salasar Associates

RG-MH-27811 · RERA P51700025546 · Last updated on MahaRERA portal: 24 Feb 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SALASAR EXOTICA - I is a Residential / Group Housing project by Salasar Associates in Thane, Maharashtra, registered with MahaRERA as P51700025546 on 28 Jun 2020. The registration is recorded completed; possession was promised by 30 Jun 2025.

At a glance

Project

  • NameSALASAR EXOTICA - I
  • TypeResidential / Group Housing
  • Location
    • HATKESH ROAD
    • MIRA ROAD EAST
    • Mira-Bhayandar (M Corp.)
    • Thane
    • 401107
  • Pincode401107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700025546
  • ReraGenie IDRG-MH-27811

Builder

  • NameSalasar Associates
  • Entity typePartnership
  • PartnersANAND RAMPRASAD AGRAWAL, JORDAN STEPHEN PEREIRA, MANHARLAL BALWANTRAI MEHTA, MANOJ MOTAJI PUROHIT, ARJUN MANOJ PUROHIT, HARISH BABULAL AGRAWAL, SANJAY SATYANARAYAN AGRAWAL, MANISH BABULAL AGRAWAL
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2020PromisedJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on28 Jun 2020
  • Promised completion30 Jun 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHUKHAND A BUILDING TYPE - 1 MIXEDNA220000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

BHUKHAND A BUILDING TYPE - 1 MIXED: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed128

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots128
Closed/Covered128

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,476 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6052.79
Proposed, not sanctioned3,756 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOREGAON EAST

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnish & Associates
EngineerPROTECH CONSULTANTS
Chartered AccountantThar & Co
Chartered AccountantAMIT B AGARWAL & ASSOCIATES
PartnerRole in project
Salasar Associates-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Feb 2025

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: 2 OC PLANS-1.pdf24 Feb 2025
Building plan approvalFile: 2 OC PLANS-2-3.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 OC PLANS-1.pdf24 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 OC PLANS-2-3.pdf24 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOC Certificate - Salasar Exotica -I.pdf12 Feb 2025
Status of ConveyanceFile: CONVE.pdf12 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Architect Certificate.pdf11 Feb 2025
Layout approvalFile: Revised CC plans-1.pdf7 Feb 2025
Building plan approvalFile: Revised CC plans-2_compressed.pdf7 Feb 2025
Building plan approvalFile: Revised CC plans-3_compressed.pdf7 Feb 2025
Building plan approvalFile: Revised CC plans-4.pdf7 Feb 2025
Building plan approvalFile: Revised CC plans-5.pdf7 Feb 2025
Copy of Layout Approval (in case of layout)File: Revised CC plans-1.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised CC plans-2_compressed.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised CC plans-3_compressed.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised CC plans-4.pdf7 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised CC plans-5.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: oc scan.pdf7 Feb 2025
Layout approvalFile: GetUserDocumentFileContent (1).pdf6 Feb 2025
Copy of Layout Approval (in case of layout)File: GetUserDocumentFileContent (1).pdf6 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf6 Feb 2025
Commencement Certificates / NA Order for plotted developmentFile: Revised CC_compressed.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A (1).pdf24 Sep 2023
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf24 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf24 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-SALASAR EXOTICA 1_MAR 2023.pdf24 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-SALASAR EXOTICA 1_MAR 2023.pdf24 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-SALASAR EXOTICA 1_MAR 2023_compressed.pdf24 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf11 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC2022.pdf11 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2022.pdf11 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A.pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_compressed.pdf11 Feb 2023
Disclosure of sold/ booked inventoryFile: FORM 3 DEC 2022_compressed.pdf11 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2022_compressed.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.pdf11 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 21-22.pdf11 Feb 2023
Declaration about Commencement CertificateFile: Declaration Certificate.pdf21 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: SA Certficate for quality.pdf21 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: SA Certficate for quality.pdf21 May 2022
CERSAI detailsFile: CERSAI.pdf16 May 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Pro - Tech Consultants Salasar Asspciates _compressed.pdf14 Oct 2021
Declaration in FORM BFile: ARA Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: HBA Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: MBM Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: AP Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: MP Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: MBA Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: JSP Exotica Form B.pdf12 Jun 2020
Declaration in FORM BFile: SSA Exotica Form B.pdf12 Jun 2020
Proforma of Allotment letterFile: Draft Agreement for Sale Salasar Exotica 1.pdf12 Jun 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SA Salasar Exotica I MahaRERA Form 3 CA Certificate 1-2.pdf27 Jan 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SA Salasar Exotica I MahaRERA Form 3 CA Certificate 2-2.pdf27 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SA Salasar Exotica I MahaRERA Form 1 Architects Certificate.PDF24 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SA Salasar Exotica I MahaRERA Form 2 Engineer certificate.PDF24 Jan 2020
Proforma of Allotment letterFile: SA Salasar Exitica I MahaRERA Self Declaration And Performa for Allotment Letter.PDF21 Jan 2020
Layout approvalFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 16 Location Plan.PDF20 Jan 2020
Building plan approvalFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 26 B2 Ground First Floor Plan.PDF20 Jan 2020
Building plan approvalFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 36 B2 Typical Floor Plan.PDF20 Jan 2020
Building plan approvalFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 46 A1 Ground First Floor Plan.PDF20 Jan 2020
Building plan approvalFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 56 A1 Typical Floor Plan.PDF20 Jan 2020
Building plan approvalFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 66 A1 Terrace Floor Plan.PDF20 Jan 2020
PAN CardFile: SA Salasar Exotica - I Salasar Associates PAN Card.PDF20 Jan 2020
Copy of the legal title reportFile: SA Salasar Exotica I 14102019 Certificate Of Title Adv PHari.PDF20 Jan 2020
Copy of the legal title reportFile: SA Salasar Exotica I 14102019 Search Report Adv PHari.PDF20 Jan 2020
Details of encumbrancesFile: SA Salasar Exotica - Encumberance Certificate.PDF20 Jan 2020
Copy of Layout Approval (in case of layout)File: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 16 Location Plan.PDF20 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 26 B2 Ground First Floor Plan.PDF20 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 36 B2 Typical Floor Plan.PDF20 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 46 A1 Ground First Floor Plan.PDF20 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 56 A1 Typical Floor Plan.PDF20 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: SA Salasar Exotica I MBMC Approved Plan Dated 27122019 66 A1 Terrace Floor Plan.PDF20 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: SA Salasar Exotica I MBMC Approved CC Dated 27122019.pdf20 Jan 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SALASAR WOODSOLD 299 NEW 180 HISSA 4 KANAKIA ROAD MIRA ROAD EAST THANE 401107144CompletedDec 2020Late, Dec 2020

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SALASAR EXOTICA - I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIRA ROAD EAST7,600+ in Thane

2 kmSALASAR EXOTICA - ICompleted 38Lapsed / revoked 30Other 23Dot size: filed unitsN

Filed coordinates, straight-line distance. 91 registered projects within 2 km.

Builder: Salasar Associates

Salasar Associates has 1 registration on MahaRERA, including SALASAR EXOTICA - I. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SALASAR EXOTICA - I is delayed beyond 30 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SALASAR EXOTICA - I?

The registered promoter entity is Salasar Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SALASAR EXOTICA - I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SALASAR EXOTICA - I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SALASAR EXOTICA - I?

The professionals named in the filing: Architect: Anish & Associates; Engineer: PROTECH CONSULTANTS; Chartered Accountant: Thar & Co; Chartered Accountant: AMIT B AGARWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SALASAR EXOTICA - I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SALASAR EXOTICA - I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SALASAR EXOTICA - I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.