ReraGenieLog inGet a buyer report

Home / Browse projects / Satara, Maharashtra / SAJ RAUT RESIDENCY

Registration lapsed No litigation declared Residential / Group Housing project

SAJ RAUT RESIDENCY

By SAJ DEVELOPERS

RG-MH-24080 · RERA P52700008948 · Last updated on MahaRERA portal: 1 Aug 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 4 months past the filed date
  • Completion date moved by 54 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Jun 2026Possession promised4 months past this date
8 of 33Construction stages doneacross 3 buildings; furthest along: Staircases, 98%
0Complaints at MahaRERAon this registration
Jump to the 67 documents Report an error

SAJ RAUT RESIDENCY is a Residential / Group Housing project by SAJ DEVELOPERS in Satara, Maharashtra, registered with MahaRERA as P52700008948 on 19 Aug 2017. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 54 months from the original filing.

At a glance

Project

  • NameSAJ RAUT RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • Shirwal
    • Khandala
    • Satara
    • 412801
  • Pincode412801
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52700008948
  • ReraGenie IDRG-MH-24080

Builder

  • NameSAJ DEVELOPERS
  • Entity typePartnership
  • PartnerAJINKYA SUHAS DEDGE

Key dates

4 months past promisethis monthRegisteredAug 2017First promiseDec 2021Revised toJun 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion30 Jun 2026
  • Revised completionRevised to 30 Jun 2026 (originally 30 Dec 2021)
  • Buildings3 building records
  • Documents filed67 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAJ RAUT RESIDENCY E BUILDINGNA50000
SAJ RAUT RESIDENCY BUILDING B 3RD FLOORNA10000
SAJ RAUT RESIDENCY C BUILDING X WING 3RD FLOORNA10000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 1 Aug 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Staircases, at 98%.

SAJ RAUT RESIDENCY E BUILDING79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises92%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.96%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
SAJ RAUT RESIDENCY BUILDING B 3RD FLOOR43%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks93%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.60%
SAJ RAUT RESIDENCY C BUILDING X WING 3RD FLOOR52%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises92%
Sanitary Fittings within the flats / premises85%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks98%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 1 Aug 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes70%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes55%
Landscaping & Tree PlantingYes10%
Street LightingYes40%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes70%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes20%

Parking filed7

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots7
Closed/Covered3
Open Space4
BuildingClosed/CoveredOpen SpaceTotal
SAJ RAUT RESIDENCY BUILDING B 3RD FLOOR314
SAJ RAUT RESIDENCY C BUILDING X WING 3RD FLOOR033

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,800 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI5594.58
Proposed, not sanctioned5,595 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPANSARE BUILDING MAIN ROAD SHIRWAL

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS TALEKAR ASSOCIATES
PartnerRole in project
SAJ DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52700011626Dec 2021 → Dec 2022

Reason as filed by the promoterReason for delay is due to COVID -19, and Labour Shortage we were unable to complete the project on time.

EXT52700017199Dec 2021 → Jun 2026

Reason as filed by the promoterDelay is due to the pandemic covid 19 shortage of labor.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 31 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed67

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Inventory (1) (1).pdf1 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Inventory (1) (1) (1).pdf1 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold_Unsold_Inventory.pdf28 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: F1 jun 23.pdf21 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saj f2 jun 23.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: saj form 2A.pdf21 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Saj Raut Residency.pdf2 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Certificate.pdf18 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch_Cert_Saj_Sadafuly.pdf7 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Saj Raut Residency .pdf1 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form-_2A (1).pdf27 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf24 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf22 Feb 2023
Certificates of CA (Form 3)File: form 3.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form_5.pdf14 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Certificate_2018-19.pdf16 Jul 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Certificate_2019-20.pdf16 Jul 2022
CERSAI detailsFile: CERSAI_Search_Report_200233488199_For_Asset_Based_Search_26_03_2022_16_57_32_798.pdf26 Mar 2022
Declaration about Commencement CertificateFile: Format- D.pdf24 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form-2A.pdf24 Mar 2022
Disclosure of sold/ booked inventoryFile: Form-2A.pdf24 Mar 2022
Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory.pdf24 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera_Certificate_20-21.pdf21 Mar 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate.pdf25 Mar 2019
Certificates of CA (Form 3)File: CA cert.pdf25 Mar 2019
Certificates of CA (Form 5)File: Saj dev Form 05.pdf14 Feb 2019
Certificates of CA (Form 3)File: CA cert.pdf26 Nov 2018
Certificates of CA (Form 3)File: CA Cert Final.pdf19 Nov 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARC Dev.pdf22 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Dev.pdf22 May 2018
Certificates of CA (Form 3)File: CA Final.pdf22 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: saj homes architect.pdf3 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: saj homes engineers.pdf3 Mar 2018
Certificates of CA (Form 3)File: saj homes CA.pdf3 Mar 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arc Saj Dev 2.pdf6 Nov 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENG2.pdf6 Nov 2017
Certificates of CA (Form 3)File: CA SAJ DEVELOPERS.pdf6 Nov 2017
Layout approvalFile: 1 of 1.pdf31 Jul 2017
Building plan approvalFile: 1 of 5.pdf31 Jul 2017
Building plan approvalFile: 2 of 5.pdf31 Jul 2017
Building plan approvalFile: 4 of 5.pdf31 Jul 2017
Building plan approvalFile: 5 of 5.pdf31 Jul 2017
Building plan approvalFile: 3 of 5.pdf31 Jul 2017
PAN CardFile: Ajinkya Dedge-PAN Card.pdf31 Jul 2017
PAN CardFile: Suhas Dedge - PAN Card.pdf31 Jul 2017
PAN CardFile: saj dvp pan.pdf31 Jul 2017
Copy of the legal title reportFile: Legal title report _ SAJ.pdf31 Jul 2017
Details of encumbrancesFile: SAJ DEV NO ENCUM.pdf31 Jul 2017
Details of encumbrancesFile: SAJ DEV NO LITIGATION.pdf31 Jul 2017
Copy of Layout Approval (in case of layout)File: 1 of 1.pdf31 Jul 2017
Building Plan Approval (IOD)File: 1 of 5.pdf31 Jul 2017
Building Plan Approval (IOD)File: 2 of 5.pdf31 Jul 2017
Building Plan Approval (IOD)File: 3 of 5.pdf31 Jul 2017
Building Plan Approval (IOD)File: 4 of 5.pdf31 Jul 2017
Building Plan Approval (IOD)File: 5 of 5.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: COLLECTOR ORDER.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: NA Order Saj developers.pdf31 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: GP BUILDING SANCTION SAJ DVP-ilovepdf-compressed (3).pdf31 Jul 2017
Declaration in FORM BFile: FORM B PROMOTER.pdf31 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arcitect Certific 1.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SAJ DEVELOPERS FORM 2.pdf31 Jul 2017
Certificates of CA (Form 3)File: FORM 3 CA.pdf31 Jul 2017
Proforma of Allotment letterFile: DRAFT AGREEMENT.pdf31 Jul 2017
OtherFile: 7 12 Gat No 364.pdf31 Jul 2017
OtherFile: DEV AGR SAJ DEDGE.pdf31 Jul 2017
OtherFile: DEV AGR SAJ RAUT.pdf31 Jul 2017
OtherFile: Saj Developers firm reg.pdf31 Jul 2017

How this compares with Satara

16%of Satara projects moved their completion datethis one moved by 54 months
35%of Satara registrations have lapsed or been cancelledthis one is among them

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep SAJ RAUT RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shirwal1,100+ in Satara

2 kmSAJ RAUT RESIDENCYCompleted 7Lapsed / revoked 9Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: SAJ DEVELOPERS

SAJ DEVELOPERS has 1 registration on MahaRERA, including SAJ RAUT RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What does it mean that SAJ RAUT RESIDENCY shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if SAJ RAUT RESIDENCY is delayed beyond 30 Jun 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAJ RAUT RESIDENCY?

The registered promoter entity is SAJ DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAJ RAUT RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAJ RAUT RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAJ RAUT RESIDENCY?

The professionals named in the filing: Architect: S TALEKAR ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAJ RAUT RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAJ RAUT RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAJ RAUT RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.