Home / Browse projects / Pune, Maharashtra / SAISHA PHASE - 2

Registered No litigation declared Residential / Group Housing project

SAISHA PHASE - 2

By SAI SAMARTTHA PROPERTIES

RG-MH-17097 · RERA P52100028374 · Last updated on MahaRERA portal: 16 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 29 months
  • 2 extensions taken
  • Rs 13.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 29 months from the original
14 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
10 of 64Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 146 documents Report an error

SAISHA PHASE - 2 is a Residential / Group Housing project by SAI SAMARTTHA PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100028374 on 22 Feb 2021. Possession is promised by 31 May 2027. The completion date has moved by 29 months from the original filing. 54 of the 64 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete.

At a glance

Project

  • NameSAISHA PHASE - 2
  • TypeResidential / Group Housing
  • Location
    • PAVANA NAGAR
    • NEAR TO SHRIYANS SOCIETY
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100028374
  • ReraGenie IDRG-MH-17097

Builder

  • NameSAI SAMARTTHA PROPERTIES
  • Entity typePartnership
  • PartnerNIKHIL PRAKASH NIKAM
  • Other registrations4 more →
  • Completed2 of 5
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2021First promiseDec 2024Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 Feb 2021
  • Promised completion31 May 2027
  • Revised completionRevised to 31 May 2027 (originally 23 Dec 2024)
  • Buildings2 building records
  • Documents filed146 files

Current status

84%54 of 64 units booked
98.4%Work done, per cost certificate

Figures as on 16 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WING - 4 TO 11 FLOORNA8840040
MHADA WINGNA6424024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 16 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

A WING - 4 TO 11 FLOOR55%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
MHADA WING73%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 16 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership19

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area8,900 sq m
Land owned byThe promoter, with other names on the file
Named landowners19
Encumbrance on the landDeclared present
Charge in favour ofCAPRI GLOBAL CAPITAL LIMITED
Secured amountRs 13.00 crore
CERSAI search filedYes
Declared on29 Oct 2025
LandownerVillageDistrict
SUPRIYA SUNIL KHAIRNARPunawalePune
SUNIL MARUTI KHAIRNARPunawalePune
SUREKHA PRABHAKARRAO SHINDEPunawalePune
DHANANJAY RAMBHAU AUNDHEKARPunawalePune
SANTOSH SOPAN NEVASEPunawalePune
KIRAN SANTOSH NEVASEPunawalePune
SUNITA PANDURANG BHUJBALPunawalePune
CHANDRABHAGA TUKARAM KUDALEPunawalePune
REKHA RAJESH DARSHILEPunawalePune
MANDA BALU KUDALEPunawalePune
BALU SAHADU KUDALEPunawalePune
MAHENDRA BALU KUDALEPunawalePune
RAHUL BALU KUDALEPunawalePune
MADHURI RAJESH MALIPunawalePune
PRAKASH LAXMAN PARKHEPunawalePune
RESHMA PRAKASH PARKHEPunawalePune
DIVAKAR BALASHEB KATEPunawalePune
JYOTI DIWAKAR KATEPunawalePune
VISHNU RAMBHAU BHUJBALPunawalePune

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI2471.19
Proposed, not sanctioned2,471 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLOT 1, SECTOR 27A, PRADHIKARAN, NIGDI, PUNE-411044
Estimated costRs 9.95 cr
Cost incurredRs 9.79 cr
Work done98.36%
BuildingWingEstimatedIncurred
A WING - 4 TO 11 FLOORNARs 6.50 crRs 6.40 cr
MHADA WINGNARs 3.15 crRs 3.10 cr
-NARs 29.89 lakhRs 29.41 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVINOD DHUSIA ARCHITECTS
ArchitectUNUSUAL SPACES
EngineerG A BHILARE CONSULTANTS PVT LTD
EngineerSatish Gagare
Chartered AccountantNAMRATA DHRUVE & CO -
Chartered AccountantANRK ASSOCIATES LLP
Chartered AccountantV S A P & COMPANY
PartnerRole in project
SAI SAMARTTHA PROPERTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21112518394Dec 2024 → Jan 2027

Reason as filed by the promoterWe, the Promoter of the project, are applying for an extension of the project registration under Section 7(3) of the Real Estate (Regulation and Development) Act, 2016, to enable us to complete the necessary statutory and regulatory compliances on the MahaRERA portal. The construction and development work of the project has already been completed, and the Full Occupancy Certificate for the entire project has been obtained from the concerned Planning Authority on 23/07/2026. We are required to upload the said Occupancy Certificate and update the relevant project completion details on the MahaRE

P52100028374/WarDec 2024 → May 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jan 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Apr 2025

Documents filed146

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 146 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 for 2025-26- Q2.pdf16 Sep 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q3 saisha II final.pdf16 Sep 2026
Withdrawal Update Form 1File: Form 1 for FY 2025-26 Q4 saisha II.pdf16 Sep 2026
Withdrawal Update Form 1File: Form1 for FY 2026-27 final.pdf16 Sep 2026
Withdrawal Update Form 2File: Form 2 For FY 2025-26 Q2 Final.pdf16 Sep 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q3 final.pdf16 Sep 2026
Withdrawal Update Form 2File: Form 2 for FY 2025-26 Q4 final.pdf16 Sep 2026
Withdrawal Update Form 2File: Form 2 for FY 2026-27 Q1 final.pdf16 Sep 2026
Withdrawal Update Form 3File: Form 3 For FY 2025-26 Q2 Final.pdf16 Sep 2026
Withdrawal Update Form 3File: Form 3 For FY 2025-26 Q3 Final.pdf16 Sep 2026
Withdrawal Update Form 3File: Form 3 For FY 2025-26 Q4 Final.pdf16 Sep 2026
Withdrawal Update Form 3File: Form 3 For FY 2026-27 Q1 final.pdf16 Sep 2026
Withdrawal Update Form 1File: Form 1 For FY 2025-26 Q1 Final.pdf11 Sep 2026
Withdrawal Update Form 2File: Form 2 For FY 2025-26 Q2 Final.pdf11 Sep 2026
Withdrawal Update Form 3File: Form 3 For FY 2025-26 Q1 final.pdf11 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A for FY 2025-26 Saisha Plase II final.pdf10 Sep 2026
Form 5 (FY 2025-2026)File: Form 5 Shaisha II for FY 2025-26 final.pdf10 Sep 2026
Form 2A (FY 2024-2025)File: Form 2A for FY 2024-25 Saisha Plase II final.pdf9 Jun 2026
Form 5 (FY 2024-2025)File: Annual Audit Form 5 FY 2024-25 Saisha II.pdf5 Dec 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: REG CERTIFICATE.pdf3 Jun 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Saisha.pdf30 Apr 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC Saisha.pdf30 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar saisha ph 2 july 24.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar saishph2 oct24.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Saisha Phase2 Jun24.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Saisha 2 Sep 24.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Er Saishaph2 oct24.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Saisha 2 Qty 1 booking.pdf24 Oct 2024
Disclosure of sold/ booked inventoryFile: Saisha 2 Qty 2 booking.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Saisha Ph2 April 2024.pdf21 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saisha ph2 apri 24 enng.pdf21 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA SAISHA PHASE II.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AR Saisha PH2 April 24 C.pdf13 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Saisha ph2 April 24 (2).pdf13 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Saisha ph2 C.pdf13 Jun 2024
Disclosure of sold/ booked inventoryFile: Saisha Project - Ph-2 - Inventory certificate - March-24.pdf24 Apr 2024
Disclosure of sold/ booked inventoryFile: SAISHA PROJECT - PH2 - Inventory certificate Dec-23.pdf22 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf13 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Saisha ph2 FY 22-23.pdf3 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: saisha second architect certificate.pdf28 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate saisha phase 2 second.pdf28 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saisha Ph2 CA.pdf28 Nov 2023
Disclosure of sold/ booked inventoryFile: Inventory Certificate Saisha 2 Sept 23.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Saisha Ph2 july 23.pdf7 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate Saisha - Ph - 2.pdf18 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Saisha - Ph - 2.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: RERA - Inventory Certifiacte - June - 23 - PH - 2.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saisha Ph2 April 2023.pdf5 Jul 2023
Details of encumbrancesFile: RERA encumbrance - 2023.pdf15 May 2023
Disclosure of sold/ booked inventoryFile: Saisha Inventory certificate - PH-2.pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5(UT) Saisha2 20-21 signed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5(UT) Saisha2 20-21 signed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5(UT) Saisha2 21-22 signed.pdf27 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5(UT) Saisha2 21-22 signed.pdf27 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Saisha Ph2.pdf24 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Saisha Ph2.pdf5 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Saisha Ph2.pdf5 Feb 2023
Disclosure of sold/ booked inventoryFile: Booking Saisha Ph2.pdf5 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saishaph2 Ar.pdf21 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: saisha ph2 Eng.pdf21 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Saisha ph2.pdf21 Oct 2022
Disclosure of sold/ booked inventoryFile: RERA INVENTORY Ph2 SEPT-22.pdf21 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 2 Sept 22.pdf21 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saishaph 2 mar22.pdf30 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Saishaph2 jun22.pdf30 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ar Saisha ph 2.pdf9 Aug 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Saisha phase 2.pdf9 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quilty Saisha phase 2.pdf9 Aug 2022
Disclosure of sold/ booked inventoryFile: RERA INVENTORY CERTIFICATE - SAISHA PH-2.pdf14 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saisha Ar Ph2 c.pdf8 Jun 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saisha Phase 2.pdf25 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Saisha Phase 2 Quailty Assurance Certificate.pdf25 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Saisha Phase 2 Quailty Assurance Certificate.pdf25 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Saisha Phase 2 Quailty Assurance Certificate.pdf25 May 2022
Disclosure of sold/ booked inventoryFile: Inventory Certificate Saisha - PH - 2.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: RERA INVENTORY CERTIFICATE SAISHA PH-2.pdf6 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: IMG_20211223_0001_compressed (1).pdf28 Dec 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QA Saisha 2.pdf28 Dec 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: NAME RESERVATION LETTER_0001.pdf3 Dec 2021

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SHRIYANSGAT NO 43 PUNAVALE TAL MULSHI DIST PUNE172CompletedOct 2016Late, Mar 2017

How this compares with Pune

84%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 29 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAISHA PHASE - 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR TO SHRIYANS SOCIETY13,700+ in Pune

2 kmSAISHA PHASE - 2Completed 116Lapsed / revoked 117Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 268 registered projects within 2 km.

Builder: SAI SAMARTTHA PROPERTIES

SAI SAMARTTHA PROPERTIES has 5 registrations on MahaRERA, including SARISHA and SHREYA. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SAISHA PHASE - 2 is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAISHA PHASE - 2?

The registered promoter entity is SAI SAMARTTHA PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAISHA PHASE - 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAISHA PHASE - 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAISHA PHASE - 2?

The professionals named in the filing: Architect: VINOD DHUSIA ARCHITECTS; Architect: UNUSUAL SPACES; Engineer: G A BHILARE CONSULTANTS PVT LTD; Engineer: Satish Gagare; Chartered Accountant: NAMRATA DHRUVE & CO -; Chartered Accountant: ANRK ASSOCIATES LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAISHA PHASE - 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAISHA PHASE - 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAISHA PHASE - 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.