Red flags

  • Completion date moved by 26 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jul 2026Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
6 of 10Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

SAIRAJ AVENUE WING B is a Residential / Group Housing project by VIRENDRA ATMARAM SALUNKHE in Thane, Maharashtra, registered with MahaRERA as P51700049787 on 24 Feb 2023. The registration is recorded completed; possession was promised by 31 Jul 2026. The completion date has moved by 26 months from the original filing. 4 of the 10 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAIRAJ AVENUE WING B
  • TypeResidential / Group Housing
  • Location
    • SUBHASH NAGAR ROAD BELAVALI
    • BEHIND SHREE COMPLEX BADLAPUR WEST
    • Badlapur (M Cl)
    • Ambarnath
    • Thane
    • 421503
  • Pincode421503
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700049787
  • ReraGenie IDRG-MH-37725

Builder

  • NameVIRENDRA ATMARAM SALUNKHE
  • Entity typeIndividual

Key dates

this monthRegisteredFeb 2023First promiseMay 2024Revised toJul 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Feb 2023
  • Promised completion31 Jul 2026
  • Revised completionRevised to 31 Jul 2026 (originally 31 May 2024)
  • Buildings1 building record
  • Documents filed79 files

Current status

40%4 of 10 units booked
98.7%Work done, per cost certificate

Figures as on 24 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAIRAJ AVENUE WING BNA5510010

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

SAIRAJ AVENUE WING B: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area199 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
Declared on21 Feb 2026
LandownerVillageDistrict
AVINASH D PATKARBadlapur (M Cl)Thane

Approvals and building plan

Sanctioning authorityKULGAON BADLAPUR MUNCIPAL COUNCIL
Permissible FSI338.54
Proposed, not sanctioned339 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOPP SURYA NAGAR KATRAP BADLAPUR EAST
Estimated costRs 76.98 lakh
Cost incurredRs 75.98 lakh
Work done98.71%
BuildingWingEstimatedIncurred
SAIRAJ AVENUE WING BNARs 67.35 lakhRs 66.68 lakh
-NARs 9.62 lakhRs 9.30 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH KHAMBAYAT
EngineerATUL KUDTARKAR
Chartered AccountantAMRRITA JAGNAANI
Chartered AccountantR V CHARI
PartnerRole in project
VIRENDRA ATMARAM SALUNKHE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700019905May 2024 → May 2025

Reason as filed by the promoterDue to Recession in Construction Business all the Construction Work has been slow down for more than 12 Months. And also Shortage of Labour & Material , we are not able to Move Construction Work in Full Speed.

EA26072502205May 2024 → Dec 2025

Reason as filed by the promoterDue to Recession in Construction Business, all the construction work has been slowed down for more than 12 months, and also shortage of labours & material, we are not able to move construction work in full speed.

EA21022619944May 2024 → Jul 2026

Reason as filed by the promoterDue to Recession in Construction Business all the Construction Work has been slow down for more than 12 Months. And also Shortage of Labour & Material , we are not able to Move Construction Work in Full Speed.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM 2A 2025-26.pdf24 Jun 2026
Occupational CertificateFile: OC - Sairaj Avenue - B - Wing.pdf2 Jun 2026
Withdrawal Update Form 1File: FORM 1 MARCH 26.pdf29 May 2026
Withdrawal Update Form 2File: FORM 2 MARCH 26.pdf29 May 2026
Withdrawal Update Form 3File: FORM 3 MARCH 26.pdf29 May 2026
Form 2A (FY 2025-2026)File: FORM 2A 2025-26.pdf29 May 2026
Form 1File: FORM 1 SEPT 2025.pdf20 Feb 2026
Form 2File: FORM 2 SEPT 2025.pdf20 Feb 2026
Form 3File: FORM 3 SEPT 2025.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf20 Feb 2026
Form 1File: FORM 1 DEC 2025.pdf20 Feb 2026
Form 2File: FORM 2 DEC 2025.pdf20 Feb 2026
Form 3File: FORM 3 DEC 2025.pdf20 Feb 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf20 Feb 2026
Form 1File: Form 1.pdf26 Jun 2025
Form 2File: Form 2.pdf26 Jun 2025
Form 3File: form 3.pdf26 Jun 2025
Disclosure of Sold and Booked InventoryFile: sold unsold list.pdf26 Jun 2025
Form 2A (FY 2024-2025)File: form 2A 24-25.pdf26 Jun 2025
Form 5 (FY 2024-2025)File: FORM 5.pdf26 Jun 2025
Form 2A (FY 2022-2023)File: FORM 2A 22-23.pdf24 Jun 2025
Form 2A (FY 2023-2024)File: FORM 2A 23-24.pdf24 Jun 2025
Form 5 (FY 2022-2023)File: FORM 5 22-23.pdf21 Jun 2025
Form 5 (FY 2023-2024)File: FORM 5 23-24.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 31122024.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 31122024.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 31122024.pdf18 Jan 2025
Declaration in FORM BFile: AFFIDAVIT.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD UNITS.pdf19 Dec 2024
Declaration in FORM BFile: affedvit cum declaration.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Shree Sai Builders 30624.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - shree sai builders 30924.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 6 24.pdf29 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30 9 24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - April to Jun 24.pdf29 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - July To Sept 24.pdf29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SHREE SAI BUIL AND DEV FORM 2 A.pdf29 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 520241129_16325551.pdf29 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dated 31032024.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dated 31032024.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dated 31032024.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf8 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q4 31032023 LAST YEAR.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q1 30062023.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q2 30092023.pdf4 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 Q3 31122023.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q4 31032023 LAST YEAR.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q1 30062023.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q2 30092023.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM2 Q3 31122023.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q4 31032023 LAST YEAR.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q1 30062023.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q2 30092023.pdf4 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 Q3 31122023.pdf4 Feb 2024
Other - TechnicalFile: plinth completion.pdf15 Feb 2023
Declaration about Commencement CertificateFile: ANNEXDURE D.pdf2 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSBD FORM 1 NEW.pdf2 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSBD FORM 2 NEW.pdf2 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: new letter.pdf5 Jan 2023
Layout approvalFile: PLAN FINAL.pdf22 Dec 2022
Copy of Layout Approval (in case of layout)File: PLAN FINAL.pdf22 Dec 2022
Other - TechnicalFile: LETTER.pdf22 Dec 2022
Copy of the legal title reportFile: Virendra Latest Title f.pdf9 Nov 2022
Building plan approvalFile: SHREE SAI PLAN_compressed.pdf17 Oct 2022
PAN CardFile: VIRU PAN FINAL.pdf17 Oct 2022
Details of encumbrances concerned to FinanceFile: NON ENC FINANCE.pdf17 Oct 2022
Details of encumbrances concerned to LegalFile: SHREE SAI NON ENCUBRANCE FINAL.pdf17 Oct 2022
Building Plan Approval / NA Order for plotted developmentFile: SHREE SAI PLAN_compressed.pdf17 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: C C _compressed.pdf17 Oct 2022
Declaration in FORM BFile: FORM B FINAL.pdf17 Oct 2022
CERSAI detailsFile: CERSAI REPORT.pdf17 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL.pdf17 Oct 2022
Proforma of Allotment letterFile: AL_compressed (1).pdf17 Oct 2022
Proforma of Allotment letterFile: VIREN AFS.pdf17 Oct 2022
Proforma of Agreement for saleFile: VIREN AFS.pdf17 Oct 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK LETTER.pdf17 Oct 2022
Deviation Report with respect to Allotment letterFile: DEVIATION AL.pdf17 Oct 2022
Deviation Report with respect to model copy of AgreementFile: DEVIATION AFS.pdf17 Oct 2022

How this compares with Thane

40%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 26 months
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SAIRAJ AVENUE WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BEHIND SHREE COMPLEX BADLAPUR WEST7,600+ in Thane

2 kmSAIRAJ AVENUE WING BCompleted 183Lapsed / revoked 69Other 92Dot size: filed unitsN

Filed coordinates, straight-line distance. 344 registered projects within 2 km.

Builder: VIRENDRA ATMARAM SALUNKHE

VIRENDRA ATMARAM SALUNKHE has 1 registration on MahaRERA, including SAIRAJ AVENUE WING B. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if SAIRAJ AVENUE WING B is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAIRAJ AVENUE WING B?

The registered promoter entity is VIRENDRA ATMARAM SALUNKHE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAIRAJ AVENUE WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAIRAJ AVENUE WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAIRAJ AVENUE WING B?

The professionals named in the filing: Architect: RAJESH KHAMBAYAT; Engineer: ATUL KUDTARKAR; Chartered Accountant: AMRRITA JAGNAANI; Chartered Accountant: R V CHARI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAIRAJ AVENUE WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAIRAJ AVENUE WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAIRAJ AVENUE WING B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.