Home / Browse projects / Ratnagiri, Maharashtra / SAIDEEP

Completed No litigation declared Others project

SAIDEEP

By Shri Siddhivinayak Constructions

RG-MH-86342 · RERA P52800046852 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Ratnagiri registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
0 of 11Construction stages donefurthest along: Excavation, 0%
13 of 63Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

SAIDEEP is a Others project by Shri Siddhivinayak Constructions in Ratnagiri, Maharashtra, registered with MahaRERA as P52800046852 on 14 Sep 2022. The registration is recorded completed; possession was promised by 31 May 2026. 50 of the 63 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameSAIDEEP
  • TypeOthers
  • Location
    • 12 m Wide Internal Road
    • Shivaji Nagar
    • Ratnagiri (M Cl)
    • Ratnagiri
    • 415639
  • Pincode415639
  • RERA no.P52800046852
  • ReraGenie IDRG-MH-86342

Builder

  • NameShri Siddhivinayak Constructions
  • Entity typePartnership
  • PartnersTejal Deepak Salvi, Deepak Yashwant Salvi, Manali Deepak Salvi, Aditya Deepak Salvi
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2022PromisedMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Sep 2022
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

79%50 of 63 units booked

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SAIDEEPNA8763063

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

SAIDEEP: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed92

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots92
Closed/Covered46
Open Space46

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,050 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Aug 2025

Approvals and building plan

Sanctioning authorityRatnagiri Municipal Council
Permissible FSI4070.4
Proposed, not sanctioned4,070 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKhareghat Road, Ratnagiri Pin415612

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSAMBHAJI D PATIL
EngineerKanekar Charuddatta rajendra Rajshree
EngineerPranjan Dipak Rasal
Chartered AccountantA H PATWARDHAN
Chartered AccountantPatwardhan H. L. And Co.
Chartered AccountantS C Paranjape & Co.
PartnerRole in project
Shri Siddhivinayak Constructions-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Sep 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1.pdf15 May 2026
Form 2File: Form 2.pdf15 May 2026
Form 3File: Form 3.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf15 May 2026
OthersFile: Form 4.pdf15 May 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory Saideep 31122025.pdf24 Mar 2026
Form 3File: Form III Saideep 31122025.pdf24 Mar 2026
Form 2File: Engineer Certificate 31122025 Saideep.pdf24 Mar 2026
Form 1File: Form 1 Saideep 04122025.pdf24 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Saideep 30092025.pdf24 Mar 2026
Form 1File: Saideep Form 1 30092025.pdf24 Mar 2026
Form 2File: Engineer Certificate Saideep 30092025.pdf24 Mar 2026
Form 3File: Form III Saideep 30092025.pdf24 Mar 2026
Form 2A (FY 2024-2025)File: Form 2A Annexure C Saideep 2024-25.pdf2 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 Saideep 2024-25.pdf2 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked Inventory Saideep 30062025.pdf13 Sep 2025
Form 3File: Form III Saideep 30062025.pdf13 Sep 2025
Form 1File: Form 1 Saideep 3062025.pdf13 Sep 2025
Form 2File: Engineer Certificate Saideep30062025.pdf13 Sep 2025
Form 1File: Saideep Form 1 31032025.pdf9 Aug 2025
Form 2File: Form 2 Saideep 30042025.pdf9 Aug 2025
Form 3File: Saideep Form 1 31032025.pdf9 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold booked inventory.pdf9 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Saideep_31-12-2024.pdf28 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Saideep 31-03-2025.pdf28 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III saideep (2).pdf24 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form II saideep.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III CA Certificate Saideep 30092024.pdf16 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Saideep.pdf16 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Saideep Form 5.pdf15 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III Saideep.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Saideep Form - 1.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Saideep.pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Saideep Form 2.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Annexure C Saideep 2023-24.pdf1 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Saideep.pdf28 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate saideep.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III CA Certificate.pdf28 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III CA CertificateSaideep.pdf28 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Saideep 2022-23.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1 Saideep.pdf14 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate SAIDEEP.pdf17 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate Saideep.pdf12 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A form 1 Saideep.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Annexure A Form 1 Saideep.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saideep Engineer Certificate.pdf21 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revised Engineer Certificate.pdf21 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form III CA Certificate Saideep compressed.pdf21 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SAIDEEP Architect Certificate Form 1.pdf24 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saideep Engineer Certificate Form 2.pdf24 Feb 2023
Proforma of Allotment letterFile: ANNEXURE A.pdf7 Sep 2022
Copy of the legal title reportFile: search.pdf3 Sep 2022
Deviation Report with respect to Allotment letterFile: Deviation Allotment.pdf3 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Agreement.pdf3 Sep 2022
Details of encumbrances concerned to FinanceFile: 3 Self Declaration regarding encumbrances finance.pdf16 Aug 2022
Details of encumbrances concerned to LegalFile: 4 Self Declaration regarding encumbrances legal.pdf16 Aug 2022
Proforma of Allotment letterFile: Allotment.pdf16 Aug 2022
Proforma of Allotment letterFile: A F Sale.pdf16 Aug 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 34 Declaration about separate bank account.pdf16 Aug 2022
Building plan approvalFile: 6 Drawing 1.pdf1 Aug 2022
Building plan approvalFile: 7 Drawing 2.pdf1 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 6 Drawing 1.pdf1 Aug 2022
Building Plan Approval / NA Order for plotted developmentFile: 7 Drawing 2.pdf1 Aug 2022
Declaration about Commencement CertificateFile: 10 Declaration about commencement certificate.pdf1 Aug 2022
CERSAI detailsFile: 17 CERSAI_Search_Report_200243648315_For_Asset_Based_Search_31_07_2022_16_29_59_296.pdf1 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 18 Form 3 CA.pdf1 Aug 2022
PAN CardFile: Pan Card.pdf30 Jul 2022
Layout approvalFile: LAYOUT.pdf15 Jul 2022
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf15 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Order.pdf15 Jul 2022
Declaration in FORM BFile: Form B affidavit cum declaration Sai Deep_compressed.pdf15 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architects certificate 1 final.pdf15 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Saideep Engineer Certificate Revised.pdf15 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Yashodhan AppartmentS.NO. 313 Nachane Road Ratnagiri100CompletedDec 2018Oct 2018

How this compares with Ratnagiri

79%of this project is bookeddistrict median 23%
15%of Ratnagiri projects moved their completion datethis one has not
30%of Ratnagiri registrations have lapsed or been cancelledthis one is completed

Computed across the 1,100+ Ratnagiri projects on ReraGenie, from their own filings.

Keep SAIDEEP on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Shivaji Nagar1,100+ in Ratnagiri

Builder: Shri Siddhivinayak Constructions

Shri Siddhivinayak Constructions has 2 registrations on MahaRERA, including Yashodhan Apartment and SAIDEEP. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Ratnagiri district page.

Frequently asked questions

What are my rights if SAIDEEP is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SAIDEEP?

The registered promoter entity is Shri Siddhivinayak Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SAIDEEP?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SAIDEEP?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SAIDEEP?

The professionals named in the filing: Architect: SAMBHAJI D PATIL; Engineer: Kanekar Charuddatta rajendra Rajshree; Engineer: Pranjan Dipak Rasal; Chartered Accountant: A H PATWARDHAN; Chartered Accountant: Patwardhan H. L. And Co.; Chartered Accountant: S C Paranjape & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SAIDEEP?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SAIDEEP. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SAIDEEP to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.